Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status September 24, 2019 ==
== Yocto Project Weekly Status October 1, 2019 ==
Current Dev Position: YP 2.8 M4 Feature Freeze<br/>
Current Dev Position: YP 2.8 M4 Feature Freeze<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>


'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>
*SWAT lead is currently: Amanda
*SWAT lead is currently: Armin
*SWAT team rotation: Amanda -> Chen on Sept. 27, 2019
*SWAT team rotation: Armin -> Chen on Oct. 4, 2019
*SWAT team rotation: Chen -> Armin on Oct. 4, 2019
*SWAT team rotation: Chen -> Anuj on Oct. 11, 2019
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Sept 26th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Oct. 3rd at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting Tuesday Oct. 1st at 8am PDT (https://zoom.us/j/990892712)
*Monthly Project Meeting Tuesday Oct. 1st at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Sept. 17th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 8th at 8am PDT (https://zoom.us/j/990892712)
*Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)
*Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*We’re now in feature freeze for 3.0 and working on bug fixing for final release
*We’re now in feature freeze in M4 for 3.0 and working on bug fixing for final release
*We have built M3 and this is due from QA on Thursday
*We have a QA report for M3 and this is due for release this week
*The main unresolved issue for 3.0 is with the hash equivalence server causing problems with the eSDK and this issue is being investigated but can’t be reproduced as yet.
*The known issues to be addressed before M4 rc1 is built:
*We also want to find a better solution to the systemd timeout problem before final release.
**Strace kernel timeout problems
**Better solution for systemd hwdb timeout
**Fixes for the lsb->altcfg release directory names
**Fix for hashserv bitbake-selftest server shutdown issue
**There is bitbake upgrade problem where an older OE-Core doesn’t work with a newer bitbake due to bb.build.FuncFailed being missing#
*The aim is to build M4 rc1 this week if at all possible but it depends on the above issues being fixed (there are open high bugs for these)
*A significant performance problem has been found on the autobuilder where some builds are scaling in time badly as the sstate cache grows, taking 12 hours or more in some cases. Unfortunately nobody seems motivated to help work on this kind of issue.
*A significant performance problem has been found on the autobuilder where some builds are scaling in time badly as the sstate cache grows, taking 12 hours or more in some cases. Unfortunately nobody seems motivated to help work on this kind of issue.
*The plan for M4 is to resolve the above issues and any issues raised from M3 QA, then proceed with the main release rc builds. The first M4 build is scheduled for next week.
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.


'''Planned Releases for YP 3.0 {2.8}:'''<br/>
'''Planned Releases for YP 3.0 {2.8}:'''<br/>
*M3 Release 6th Sept
*M3 Release this week.
*M4 Cutoff 30th Sept - this will be YP 3.0.
*M4 Cutoff 30th Sept - this will be YP 3.0.
*YP 3.0 {2.8 (M4)} Final Release 25th Oct
*YP 3.0 {2.8 (M4)} Final Release 25th Oct
Line 34: Line 38:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2505 (last week 2449) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2552 (last week 2505) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1427 (last week 1424)
**Total patches found: 1440 (last week 1427)
**Patches in the Pending State: 587 (41%) [last week 587 (41%)]
**Patches in the Pending State: 587 (41%) [last week 587 (41%)]



Revision as of 14:50, 1 October 2019

Yocto Project Weekly Status October 1, 2019

Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Armin
  • SWAT team rotation: Armin -> Chen on Oct. 4, 2019
  • SWAT team rotation: Chen -> Anuj on Oct. 11, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • We’re now in feature freeze in M4 for 3.0 and working on bug fixing for final release
  • We have a QA report for M3 and this is due for release this week
  • The known issues to be addressed before M4 rc1 is built:
    • Strace kernel timeout problems
    • Better solution for systemd hwdb timeout
    • Fixes for the lsb->altcfg release directory names
    • Fix for hashserv bitbake-selftest server shutdown issue
    • There is bitbake upgrade problem where an older OE-Core doesn’t work with a newer bitbake due to bb.build.FuncFailed being missing#
  • The aim is to build M4 rc1 this week if at all possible but it depends on the above issues being fixed (there are open high bugs for these)
  • A significant performance problem has been found on the autobuilder where some builds are scaling in time badly as the sstate cache grows, taking 12 hours or more in some cases. Unfortunately nobody seems motivated to help work on this kind of issue.
  • If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.

Planned Releases for YP 3.0 {2.8}:

  • M3 Release this week.
  • M4 Cutoff 30th Sept - this will be YP 3.0.
  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
  • YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives