Weekly Status

From Yocto Project
Jump to navigationJump to search

Yocto Project Weekly Status October 23, 2019

Current Dev Position: YP 3.0 Final Release
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Paul
  • SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
  • SWAT team rotation: Amanda -> Armin on Nov. 1, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • YP 3.0 as been approved by the TSC and should be released later this week. Only the final tweaks to the release notes remain.
  • Master has continued taking patches for post 3.0.
  • There are a number of intermittent failures on the autobuiler which are causing concern, there is a separate email about this.
  • YP 2.6.4 was built and submitted to QA
  • YP 2.7.2 was not built due to a remaining bug which needs to be resolved first

Next week is ELC-E and therefore may be quiet on the mailing lists with patch merging being delayed.

Planned Releases for YP 3.0 {2.8}:

  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) s planned this week (assuming the remaining bug is resolved).
  • YP 2.6.4 (Thud) is in QA.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives