Yocto Project Weekly Status October 8, 2019
Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct
SWAT Team Rotation:
- SWAT lead is currently: Chen
- SWAT team rotation: Chen -> Paul on Oct. 11, 2019
- SWAT team rotation: Paul -> Ross on Oct. 18, 2019
- //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
- Bug Triage meeting Thursday Oct. 10th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Oct. 8th at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- The project is about to build M4 rc1 once some final tweaks have been tested and merged (details below).
- Known issues that have been or are to be addressed before M4 rc1 is built:
- Strace kernel timeout problems - the issue has now been reproduced and understood upstream and a patch has been found to address the issue. We therefore plan to include this in M4 rc1 (thanks Bruce)
- We upgraded to a new uninative version to ensure compatibility with distros shipping glibc 2.30 (thanks Michael/Armin).
- We resolved the systemd hwdb postinst script issues (thanks Ross)
- The eSDK performance issue has been worked around but removal of old sstate artefacts on the system however we ultimately do need to improve the code (will target 3.1).
- If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
Planned Releases for YP 3.0 {2.8}:
- M3 Release this week.
- M4 Cutoff 30th Sept - this will be YP 3.0.
- YP 3.0 {2.8 (M4)} Final Release 25th Oct
Planned upcoming dot releases:
- YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
- YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.
Tracking Metrics:
- WDD 2552 (last week 2505) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1440 (last week 1427)
- Patches in the Pending State: 587 (41%) [last week 587 (41%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC