Weekly Status
From Yocto Project
Jump to navigationJump to search
Yocto Project Weekly Status September 17, 2019
Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct
SWAT Team Rotation:
- SWAT lead is currently: Paul
- SWAT team rotation: Ross -> Amanda on Sept. 20, 2019
- SWAT team rotation: Amanda -> Chen on Sept. 13, 2019
- //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
- Bug Triage meeting Thursday Sept 19th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Oct. 1st at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Sept. 17th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- We’re now in feature freeze for 3.0 and working on bug fixing for final release
- We have not built M3 yet as there are still three issues that need to be resolved:
- strace ptest regressions with 5.1/5.2 kernels
- systemd timeouts on mips
- hashequiv server rewrite
- The strace regressions will be discussed with the kernel community, the best workaround may be to lower the individual test timeouts so one the affected individual tests fail rather than all tests timing out.
- The qemumips issue with systemd is puzzling as its happening in hwdb and hwdb should be generated in advance anyway. Investigation is ongoing about why its being regenerated, a workaround is to increase the timeout as mips is just slow (it does complete eventually, its just marginal).
- The hashequiv server changes are being tested in master-next
It is planned to build M3 this week with the workarounds mentioned above worst case. Its expected there would be further hashequiv fixing during M4.
- We hope to make up time during M4 by having M3 at high quality and take advantage of our automation.
- Documentation - Due to illness Scott is unavailable for the next month or two so doc patches will be handled by Richard or Ross in the short term. We’ll likely limit them to correctness issues and defer any substantial new text. If anyone has availability and skills to work on the manuals please talk to us. We’re aware there is a patch backlog.
- If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
Planned Releases for YP 3.0 {2.8}:
- M3 Release 6th Sept
- M4 Cutoff 30th Sept - this will be YP 3.0.
- YP 3.0 {2.8 (M4)} Final Release 25th Oct
Planned upcoming dot releases:
- YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
- YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.
Tracking Metrics:
- WDD 2424 (last week 2424) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1417 (last week 1417)
- Patches in the Pending State: 582 (41%) [last week 582 (41%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC