Yocto Project Weekly Status June 24th, 2025

Current Dev Position: YP 5.3 M2
Next Deadline: YP 5.3 M2 Build date 2025-07-21

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M1 is in QA
  • Patches continue to merge into master for upgrades and fixes.
  • The UNPACKDIR layout changes merged. This has been disruptive for layers and it will take a while for changes to filter through various layers. It does set up better in the future with tools like devtool to avoid having lots of legacy layouts to support, and cleans up git recipes to be easier to write going forward.
  • To support this, the layer series was updated to whinlatter in core.
  • The clang build time and size increases continue to cause significant concern.
  • There are patches in progress for improving gomod support in devtool and the mirroring issue for gomod was resolved.The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
  • Support for BUILDHISTORY_RESET was removed as it was error prone and better handled on the CI side of integration.
  • OE-Core is adopting the use of glvnd for libGL abstraction
  • The initial RISC-V tune changes merged
  • Support for distro/machine selection with builtin fragments was added.
  • A section was added to the manual on primary and secondary architecture/feature support for Yocto Project: https://docs.yoctoproject.org/dev/ref-manual/yocto-project-supported-features.html
  • An email about this was sent to the openembedded-architecture list: https://lists.openembedded.org/g/openembedded-architecture/message/2162
  • For M2, the following changes have been mentioned as possibilities:
    • bitbake-setup
    • wic split from OE-Core
    • RISC-V tune changes (part 2)
    • go/gomod fetcher changes
    • switch classextend to use [filter] support from bitbake

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M1 in QSA.
  • YP 5.3 M2 Build Date 2025-07-21
  • YP 5.3 M2 Release Date 2025-08-01
  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 4.0.28 Build Date 2025-06-30
  • YP 4.0.28 Release Date 2025-07-11
  • YP 5.2.2 Build Date 2025-07-07
  • YP 5.2.2 Release Date 2025-07-18
  • YP 5.0.11 Build Date 2025-07-14
  • YP 5.0.11 Release Date 2025-07-25
  • YP 4.0.29 Build Date 2025-08-11
  • YP 4.0.29 Release Date 2025-08-25
  • YP 5.2.3 Build Date 2025-08-18
  • YP 5.2.3 Release Date 2025-08-29
  • YP 5.0.12 Build Date 2025-08-25
  • YP 5.0.12 Release Date 2025-09-05
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives