Yocto Project Weekly Status July 14, 2020
Current Dev Position: YP 3.2 M2
Next Deadline: YP 3.2 M2 build date 2020/7/27
Next Team Meetings:
- Bug Triage meeting Thursday July 16th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Aug 4th at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday July 14th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - See https://www.twitch.tv/theyoctojester
Key Status/Updates:
- A key autobuilder race has been identified as a race around the bitbake lock file which will hopefully continue to reduce the number of intermittent failures being seen. It potentially explains a number of the open bugs. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
- We are struggling with maintainers for some key components of the system/infrastructure such as devtool, wic, buildhistory and patchwork/patchtest. If anyone can help in these areas please contact Richard.
- Another way to help the project is to help us with bugs that are currently unassigned but ideally needed during 3.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.2_Unassigned_Enhancements.2FBugs
- We’re planning to migrate the project documentation from docbook to sphinx. If you’re interested/able to help with this please join the discussion over on the docs mailing list.
YP 3.2 Milestone Dates:
- YP 3.2 M2 build date 2020/7/27
- YP 3.2 M2 Release date 2020/8/7
- YP 3.2 M3 build date 2020/8/31
- YP 3.2 M3 Release date 2020/9/11
- YP 3.2 M4 build date 2020/10/5
- YP 3.2 M4 Release date 2020/10/30
Planned upcoming dot releases:
- YP 3.0.4 build date 2020/8/10
- YP 3.0.4 release date 2020/8/21
- YP 3.1.2 build date 2020/9/14
- YP 3.1.2 release date 2020/9/25
Tracking Metrics:
- WDD 2465 (last week 2485) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1269 (last week 1268)
- Patches in the Pending State: 498 (39%) [last week 497 (39%)]