Yocto Project Weekly Status October 15, 2019

Current Dev Position: YP 3.0 Final Release
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Paul
  • SWAT team rotation: Paul -> Ross on Oct. 18, 2019
  • SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • YP 3.0 was built and submitted to QA as 3.0 rc2 (rc1 had build failures).
  • There is a QA report from QA for 3.0 rc2. There were two issues raised from testing but these are both relatively minor issues that are unlikely to block release.
  • The release is therefore now pending a decision from the TSC on whether we should release.
  • Master has started taking patches for post 3.0 to try and avoid any further backlog buildup.
  • We plan to build 2.7.2, followed by 2.6.4 imminently, Armin has been preparing the branches.
  • We have begun collecting ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
  • If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.

Planned Releases for YP 3.0 {2.8}:

  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) is planned this week.
  • YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features