Yocto Project Weekly Status October 15, 2019
Current Dev Position: YP 3.0 Final Release
Next Deadline: YP 3.0 Final Release 25th Oct
SWAT Team Rotation:
- SWAT lead is currently: Paul
- SWAT team rotation: Paul -> Ross on Oct. 18, 2019
- SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
- //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
- Bug Triage meeting Thursday Oct. 17th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting uesday Nov. 5th at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is Tuesday Nov. 12th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- YP 3.0 was built and submitted to QA as 3.0 rc2 (rc1 had build failures).
- There is a QA report from QA for 3.0 rc2. There were two issues raised from testing but these are both relatively minor issues that are unlikely to block release.
- The release is therefore now pending a decision from the TSC on whether we should release.
- Master has started taking patches for post 3.0 to try and avoid any further backlog buildup.
- We plan to build 2.7.2, followed by 2.6.4 imminently, Armin has been preparing the branches.
- We have begun collecting ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
- If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
Planned Releases for YP 3.0 {2.8}:
- YP 3.0 {2.8 (M4)} Final Release 25th Oct
Planned upcoming dot releases:
- YP 2.7.2 (Warrior) is planned this week.
- YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.
Tracking Metrics:
- WDD 2528 (last week 2525) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1445 (last week 1448)
- Patches in the Pending State: 586 (41%) [last week 587 (41%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features