Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Status 17 February 2026 ==
== Yocto Project Status 24 February 2026 ==
Current Dev Position: YP 6.0 M2<br/>
Current Dev Position: YP 6.0 M2<br/>
Next Deadline: YP 6.0 M2 Build Date 2026-02-16<br/>
Next Deadline: YP 6.0 M2 Build Date 2026-02-16<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 19th Feb. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 26th Feb. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync  - Tuesday 17th Feb. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync  - Tuesday 24th Feb. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 19th Feb. 10am GMT and Monday 23rd Feb. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 26th Feb. 10am GMT and Monday 2nd Mar. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.0.33 is awaiting approval
*YP 4.0.33 is due for release
*YP 5.0.16 is in QA
*YP 5.0.16 is in QA
*YP 6.0 M2 is due to build this week but is blocked by high priority bugs.
*YP 5.2.3 is queued for QA
*There are currently 5 high open bugs, which will block M2. Three have line of sight to being resolved:
*YP 6.0 M2 is due to build when we have patches merged
**rust do_test_compile/do_install segfault (#16058)
*We have two open high issues which need further work that will block M3:  
**Generation of releases.json needs updating (#16138)
**x86 kvm broken on Fedora 43 (cpu features issue?) (#16074)
**AB-INT: do_image_wic: tar command return exit status 2 (#16143)
**AB-INT: opkg-build segmentation fault (memory corruption in pseudo?) (#16078)
*Two are currently needing further work:  
*We also have issues we need to resolve before release:
**x86 kvm broken on Fedora 43 (#16074)
**Allowing non-destructive git fetcher updates for bitbake-setup
**AB-INT: opkg-build segmentation fault (#16078)
**Splitting wic into an external tool
*We removed the bazaar, osc and cvs fetchers since they are obsolete and nobody should be using them
**Kernel rust support
*We removed sysvinit compatibility support from systemd images since this will not be supported by upstream during the lifespan of our upcoming LTS release.
**Switching to pkg-config
*We removed legacy tls support from openssl in the interests of providing better secure defaults.
**Deprecation of ltp (upstream dropped runltp and mandate kirk)
**How to improve DEBUG_BUILD?
**DISTRO_FEATURES changes to ‘nodistro’ in OE-Core
**SBOM/cve-check changes
*We updated “nodistro” to use 3 of the include files poky was already using:
**Space optimization to reduce build footprint and sstate object size
**Disabling most static libraries by default (build size/speed wins)
**Enabling security flags by default
*“nodistro” now also enables uninative by default to allow for better CDN sstate reuse
*Distros now need to use INIT_MANAGER to select their preferred init system with the default being systemd for “nodistro”. Poky’s defaults remain unchanged and we don’t have plans to change this at this time due to the work involved and impact (e.g test result comparisons).
*The number of intermittent failures affecting builds, both stable and development, continues to be problematic - we continue to prioritise addressing these since any given build is now statistically likely to hit one or more of them.
*The number of intermittent failures affecting builds, both stable and development, continues to be problematic - we continue to prioritise addressing these since any given build is now statistically likely to hit one or more of them.
*Patch review is now using two branches:
**“master-review”  - patches which pass on the autobuilder and will be discussed on the patch review call (https://git.openembedded.org/openembedded-core-contrib/log/?h=master-review)
**“master-backlog” - patches which have been discussed and need further investigation or more detailed feedback which we haven’t had time for yet (https://git.openembedded.org/openembedded-core-contrib/log/?h=master-backlog)
*Patches are merging but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
*Patches are merging but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.


Line 40: Line 46:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2941 (last week 2973) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2893 (last week 2941) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1108 (last week 1106)
**Total patches found: 1107 (last week 1108)
**Patches in the Pending State: 151 (14%) [last week 152 (14%)]
**Patches in the Pending State: 151 (14%) [last week 151 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/


Line 56: Line 62:
'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.16 Release Date 2026-02-20
*YP 5.0.16 Release Date 2026-02-20
*YP 5.3.2 Build Date 2026-02-16
*YP 5.3.2 Release Date 2026-02-27
*YP 5.3.2 Release Date 2026-02-27
*YP 4.0.34 Build Date 2026-02-23
*YP 4.0.34 Build Date 2026-02-23

Revision as of 15:23, 24 February 2026

Yocto Project Status 24 February 2026

Current Dev Position: YP 6.0 M2
Next Deadline: YP 6.0 M2 Build Date 2026-02-16

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 4.0.33 is due for release
  • YP 5.0.16 is in QA
  • YP 5.2.3 is queued for QA
  • YP 6.0 M2 is due to build when we have patches merged
  • We have two open high issues which need further work that will block M3:
    • x86 kvm broken on Fedora 43 (cpu features issue?) (#16074)
    • AB-INT: opkg-build segmentation fault (memory corruption in pseudo?) (#16078)
  • We also have issues we need to resolve before release:
    • Allowing non-destructive git fetcher updates for bitbake-setup
    • Splitting wic into an external tool
    • Kernel rust support
    • Switching to pkg-config
    • Deprecation of ltp (upstream dropped runltp and mandate kirk)
    • How to improve DEBUG_BUILD?
    • DISTRO_FEATURES changes to ‘nodistro’ in OE-Core
    • SBOM/cve-check changes
  • We updated “nodistro” to use 3 of the include files poky was already using:
    • Space optimization to reduce build footprint and sstate object size
    • Disabling most static libraries by default (build size/speed wins)
    • Enabling security flags by default
  • “nodistro” now also enables uninative by default to allow for better CDN sstate reuse
  • Distros now need to use INIT_MANAGER to select their preferred init system with the default being systemd for “nodistro”. Poky’s defaults remain unchanged and we don’t have plans to change this at this time due to the work involved and impact (e.g test result comparisons).
  • The number of intermittent failures affecting builds, both stable and development, continues to be problematic - we continue to prioritise addressing these since any given build is now statistically likely to hit one or more of them.
  • Patches are merging but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.

Ways to contribute:

New to the project?

Tracking Metrics:

YP 6.0 Milestone Dates:

  • YP 6.0 M2 Build Date 2026-02-16
  • YP 6.0 M2 Release Date 2026-02-27
  • YP 6.0 M3 Build Date 2026-03-09
  • YP 6.0 M3 Release Date 2026-03-20
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26

Upcoming dot releases:

  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives