== Yocto Project Weekly Status July 29th, 2025 ==
== Yocto Project Weekly Status Aug. 5th, 2025 ==
Current Dev Position: YP 5.3 M2<br/>
Current Dev Position: YP 5.3 M2<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday July 31st at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Aug. 7th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday July 29th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Aug. 5th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday July 31st 10am GMT and Monday Aug. 4th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Aug. 7th 10am GMT and Monday Aug. 11th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3 M2 rc2 is in QA
*YP 5.3 M2 is due to be released
*YP 5.0.11 was released
*Patches continue to merge into master for upgrades and fixes.
*Patches continue to merge into master for upgrades and fixes.
*Things have noticeably slowed due to holidays.
*Things have noticeably slowed due to holidays.
*The lldb reproducibility regression was resolved, thanks!
*xz is now a required host tool
*The clang build time (41min -> 76min) and size (350MB -> 535MB) increases continue to cause significant concern. We do have some mitigation patches in progress but nuch work remains to regain speed/space.
*Patches are proposed to change the default images to be .zst compressed since these work better for releases and sharing
*Compressed images have implications for runqemu which needs to be run in snapshot mode to boot them
*The clang build time (41min -> 76min) and size (350MB -> 535MB) increases continue to cause significant concern. There is some minor improvement with recent patches but much work remains to regain speed/space.
*The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*For M3, the following changes have been mentioned as possibilities:
*For M3, the following changes have been mentioned as possibilities:
Line 36: Line 37:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2826 (last week 2799) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2841 (last week 2826) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1098 (last week 1096)
**Total patches found: 1096 (last week 1096)
**Patches in the Pending State: 156 (14%) [last week 156 (14%)]
**Patches in the Pending State: 156 (14%) [last week 156 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M2 is in QA.
*YP 5.3 M2 is to be released.
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M3 Release Date 2025-09-12
Line 50: Line 51:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.11 was released.
*YP 4.0.29 Build Date 2025-08-11
*YP 4.0.29 Build Date 2025-08-11
*YP 4.0.29 Release Date 2025-08-25
*YP 4.0.29 Release Date 2025-08-25

Revision as of 14:42, 5 August 2025

Yocto Project Weekly Status Aug. 5th, 2025

Current Dev Position: YP 5.3 M2
Next Deadline: YP 5.3 M2 Build date 2025-07-21

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M2 is due to be released
  • Patches continue to merge into master for upgrades and fixes.
  • Things have noticeably slowed due to holidays.
  • xz is now a required host tool
  • Patches are proposed to change the default images to be .zst compressed since these work better for releases and sharing
  • Compressed images have implications for runqemu which needs to be run in snapshot mode to boot them
  • The clang build time (41min -> 76min) and size (350MB -> 535MB) increases continue to cause significant concern. There is some minor improvement with recent patches but much work remains to regain speed/space.
  • The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
  • For M3, the following changes have been mentioned as possibilities:
    • Bitbake-setup (although this is feeling not ready and too late for the next LTS)
    • wic split from OE-Core
    • RISC-V tune changes (final part)
    • switch classextend to use [filter] support from bitbake

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M2 is to be released.
  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 4.0.29 Build Date 2025-08-11
  • YP 4.0.29 Release Date 2025-08-25
  • YP 5.2.3 Build Date 2025-08-18
  • YP 5.2.3 Release Date 2025-08-29
  • YP 5.0.12 Build Date 2025-08-25
  • YP 5.0.12 Release Date 2025-09-05
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: