== Yocto Project Weekly Status July 1st, 2025 ==
== Yocto Project Weekly Status July 8th, 2025 ==
Current Dev Position: YP 5.3 M2<br/>
Current Dev Position: YP 5.3 M2<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday July 3rd at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday July 10th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday July 1st at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday July 8th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday July 3rd 10am GMT and Monday July 7th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday July 10th 10am GMT and Monday July 14th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3 M1 is due to be released. One issue was found which needs to be fixed during M2: https://bugzilla.yoctoproject.org/show_bug.cgi?id=15915
*YP 5.3 M1 was released. We still need to look into and fix the issue found: https://bugzilla.yoctoproject.org/show_bug.cgi?id=15915
**Help in debugging and fixing this would be very welcome.
**Help in debugging and fixing this would be very welcome.
*YP 4.0.28 is in QA.
*YP 4.0.28 is due to be released.
*YP 5.2.2 is in QA
*Patches continue to merge into master for upgrades and fixes.
*Patches continue to merge into master for upgrades and fixes.
*There were git tag improvements meaning we can now start adding these to SRC_URIs in all cases as shallow clone tarballs now account for them.
*The clang build time and size increases continue to cause significant concern.
*The clang build time and size increases continue to cause significant concern.
*Patches to improve gomod support in devtool merged.
*The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*OE_SHARED_UMASK was added to control the umask used for files created in the shared DL_DIR and SSTATE_DIR directories.
*There are problems with building native recipes with clang on the autobuilder which are suggesting deeper issues in our gcc files layout.
*A fix for a rare parsing hang has merged and some tweaks to the parsing queueing process are under discussion.
*cmake 4.X is ready to merge for code but is causing significant (~100 recipes) breakage in meta-openembedded. We will hold off a short while but this will merge soon. Khem needs help to fix the recipes there.
*For M2, the following changes have been mentioned as possibilities:
*For M2, the following changes have been mentioned as possibilities:
**bitbake-setup
**bitbake-setup
**wic split from OE-Core
**wic split from OE-Core
**RISC-V tune changes (part 2)
**RISC-V tune changes (part 3)
**switch classextend to use [filter] support from bitbake
**switch classextend to use [filter] support from bitbake


Line 38: Line 39:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2770 (last week 2778) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2800 (last week 2770) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1091 (last week 1093)
**Total patches found: 1091 (last week 1091)
**Patches in the Pending State: 157 (14%) [last week 157 (14%)]
**Patches in the Pending State: 156 (14%) [last week 157 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M1 is ready for release.
*YP 5.3 M1 was released.
*YP 5.3 M2 Build Date 2025-07-21
*YP 5.3 M2 Build Date 2025-07-21
*YP 5.3 M2 Release Date 2025-08-01
*YP 5.3 M2 Release Date 2025-08-01
Line 54: Line 55:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.28 is in QA.
*YP 4.0.28 is ready for release.
*YP 5.2.2 Build Date 2025-07-07
*YP 5.2.2 is in QA.
*YP 5.2.2 Release Date 2025-07-18
*YP 5.0.11 Build Date 2025-07-14
*YP 5.0.11 Build Date 2025-07-14
*YP 5.0.11 Release Date 2025-07-25
*YP 5.0.11 Release Date 2025-07-25

Revision as of 14:42, 8 July 2025

Yocto Project Weekly Status July 8th, 2025

Current Dev Position: YP 5.3 M2
Next Deadline: YP 5.3 M2 Build date 2025-07-21

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M1 was released. We still need to look into and fix the issue found: https://bugzilla.yoctoproject.org/show_bug.cgi?id=15915
    • Help in debugging and fixing this would be very welcome.
  • YP 4.0.28 is due to be released.
  • YP 5.2.2 is in QA
  • Patches continue to merge into master for upgrades and fixes.
  • The clang build time and size increases continue to cause significant concern.
  • The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
  • There are problems with building native recipes with clang on the autobuilder which are suggesting deeper issues in our gcc files layout.
  • A fix for a rare parsing hang has merged and some tweaks to the parsing queueing process are under discussion.
  • cmake 4.X is ready to merge for code but is causing significant (~100 recipes) breakage in meta-openembedded. We will hold off a short while but this will merge soon. Khem needs help to fix the recipes there.
  • For M2, the following changes have been mentioned as possibilities:
    • bitbake-setup
    • wic split from OE-Core
    • RISC-V tune changes (part 3)
    • switch classextend to use [filter] support from bitbake

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M1 was released.
  • YP 5.3 M2 Build Date 2025-07-21
  • YP 5.3 M2 Release Date 2025-08-01
  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 4.0.28 is ready for release.
  • YP 5.2.2 is in QA.
  • YP 5.0.11 Build Date 2025-07-14
  • YP 5.0.11 Release Date 2025-07-25
  • YP 4.0.29 Build Date 2025-08-11
  • YP 4.0.29 Release Date 2025-08-25
  • YP 5.2.3 Build Date 2025-08-18
  • YP 5.2.3 Release Date 2025-08-29
  • YP 5.0.12 Build Date 2025-08-25
  • YP 5.0.12 Release Date 2025-09-05
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives