Current Dev Position: YP 2.8 M4 Feature Freeze<br/>
Current Dev Position: YP 2.8 M4 Feature Freeze<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>


'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>
*SWAT lead is currently: Armin
*SWAT lead is currently: Chen
*SWAT team rotation: Armin -> Chen on Oct. 4, 2019
*SWAT team rotation: Chen -> Paul on Oct. 11, 2019
*SWAT team rotation: Chen -> Anuj on Oct. 11, 2019
*SWAT team rotation: Paul -> Ross on Oct. 18, 2019
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Oct. 3rd at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Oct. 10th at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting Tuesday Oct. 1st at 8am PDT (https://zoom.us/j/990892712)
*Monthly Project Meeting Tuesday Oct. 8th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 8th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (https://zoom.us/j/990892712)
*Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)
*Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*We’re now in feature freeze in M4 for 3.0 and working on bug fixing for final release
*The project is about to build M4 rc1 once some final tweaks have been tested and merged (details below).
*We have a QA report for M3 and this is due for release this week
*Known issues that have been or are to be addressed before M4 rc1 is built:
*The known issues to be addressed before M4 rc1 is built:
**Strace kernel timeout problems - the issue has now been reproduced and understood upstream and a patch has been found to address the issue. We therefore plan to include this in M4 rc1 (thanks Bruce)
**Strace kernel timeout problems
**We upgraded to a new uninative version to ensure compatibility with distros shipping glibc 2.30 (thanks Michael/Armin).
**Better solution for systemd hwdb timeout
**We resolved the systemd hwdb postinst script issues (thanks Ross)
**Fixes for the lsb->altcfg release directory names
*The eSDK performance issue has been worked around but removal of old sstate artefacts on the system however we ultimately do need to improve the code (will target 3.1).
**Fix for hashserv bitbake-selftest server shutdown issue
**There is bitbake upgrade problem where an older OE-Core doesn’t work with a newer bitbake due to bb.build.FuncFailed being missing#
*The aim is to build M4 rc1 this week if at all possible but it depends on the above issues being fixed (there are open high bugs for these)
*A significant performance problem has been found on the autobuilder where some builds are scaling in time badly as the sstate cache grows, taking 12 hours or more in some cases. Unfortunately nobody seems motivated to help work on this kind of issue.
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.



Revision as of 14:47, 8 October 2019

Yocto Project Weekly Status October 8, 2019

Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Chen
  • SWAT team rotation: Chen -> Paul on Oct. 11, 2019
  • SWAT team rotation: Paul -> Ross on Oct. 18, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • The project is about to build M4 rc1 once some final tweaks have been tested and merged (details below).
  • Known issues that have been or are to be addressed before M4 rc1 is built:
    • Strace kernel timeout problems - the issue has now been reproduced and understood upstream and a patch has been found to address the issue. We therefore plan to include this in M4 rc1 (thanks Bruce)
    • We upgraded to a new uninative version to ensure compatibility with distros shipping glibc 2.30 (thanks Michael/Armin).
    • We resolved the systemd hwdb postinst script issues (thanks Ross)
  • The eSDK performance issue has been worked around but removal of old sstate artefacts on the system however we ultimately do need to improve the code (will target 3.1).
  • If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.

Planned Releases for YP 3.0 {2.8}:

  • M3 Release this week.
  • M4 Cutoff 30th Sept - this will be YP 3.0.
  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
  • YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives