== Yocto Project Weekly Status April 30, 2019 ==
== Yocto Project Weekly Status May 7, 2019 ==
Current Dev Position: YP 2.7 M4 (2.7 rc2 is in QA)<br/>
Current Dev Position: YP 2.8 M1<br/>
Next Deadline: YP 2.7 Release Target April 26, 2019<br/>
Next Deadline: YP 2.8 Milestone 1 Target May ??, 2019<br/>


'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>


*SWAT lead is currently: Paul
*SWAT lead is currently: Anuj
*SWAT team rotation: Paul -> Anuj on May. 3, 2019
*SWAT team rotation: Anuj -> Ross on May. 10, 2019
*SWAT team rotation: Anuj -> Ross on May. 10, 2019
*SWAT team rotation: Ross -> Amanda on May. 17, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday May 2nd at 7:30am PDT (https://zoom.us/j/454367603)
*YP 2.8 Planning meeting Tuesday May 7th at 8am PDT (https://zoom.us/j/990892712)  
*YP 2.8 Planning meeting Tuesday May 7th at 8am PDT (https://zoom.us/j/990892712)  
*Bug Triage meeting Thursday May 9th at 7:30am PDT (https://zoom.us/j/454367603)




'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*Stephen is going to be unavailable for several weeks, please refer any queries to Richard
*Stephen is going to be unavailable for several weeks, please refer any queries to Richard
*YP 2.5.3 was released.
*YP 2.7 was released
*YP 2.7 is out of QA but pending answers to some questions on the QA report and the final pieces of release process.
*Huge kudos this week go to Armin for work on test automation of some of the manual tests
*We’ve merged ltp test automation which is now being run automatically on the autobuilder on a-full builds.
*Master continues to take patches, somewhat slowed by host specific build issues with vte-native
*WDD, our bug tracking metric is high and there are few people helping with bugs.
*The 2.8 planning discussions are starting and there is a google doc summarising the discussions so far: https://docs.google.com/document/d/1CNEKA4d0eT6-e0hnS2pwi7xdZ5_t6smpZO2HbaJGXbU/
*The 2.8 planning discussions are starting and there is a google doc summarising the discussions so far: https://docs.google.com/document/d/1CNEKA4d0eT6-e0hnS2pwi7xdZ5_t6smpZO2HbaJGXbU/
*If people are planning to work on specific things in 2.8 please let us know so we can incorporate this into our plans. If you’re interested in working on anything in the document, please also let us know or talk with us in one of the planning meetings.
*If people are planning to work on specific things in 2.8 please let us know so we can incorporate this into our plans. If you’re interested in working on anything in the document, please also let us know or talk with us in one of the planning meetings.
*At this point we believe we’ve made our final release for the sumo (2.5) series
*The project is planning to adopt SPDX license headers in its source code where practical, bitbake has had these merged as a first step.
*We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs
*We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs


 
'''Planned Releases for YP 2.8:'''<br/>
'''Planned Releases for YP 2.7:'''<br/>
*TBA
*YP 2.7 M4 Cutoff was Apr. 1, 2019
*YP 2.7 M4 Release Target is Apr. 26, 2019


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 2.6.3 (Thud) is in planning
*YP 2.6.3 (Thud) is in planning
*YP 2.7.1 (Warrior) is in planning


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2593 (last week 2598) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2602 (last week 2593) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1565 (last week 1553)
**Total patches found: 1558 (last week 1565)
**Patches in the Pending State: 655 (42%) [last week 654 (42%)]
**Patches in the Pending State: 655 (42%) [last week 655 (42%)]


'''Key Status Links for YP:'''<br/>
'''Key Status Links for YP:'''<br/>

Revision as of 14:41, 7 May 2019

Yocto Project Weekly Status May 7, 2019

Current Dev Position: YP 2.8 M1
Next Deadline: YP 2.8 Milestone 1 Target May ??, 2019

SWAT Team Rotation:

Next Team Meetings:


Key Status/Updates:

  • Stephen is going to be unavailable for several weeks, please refer any queries to Richard
  • YP 2.7 was released
  • The 2.8 planning discussions are starting and there is a google doc summarising the discussions so far: https://docs.google.com/document/d/1CNEKA4d0eT6-e0hnS2pwi7xdZ5_t6smpZO2HbaJGXbU/
  • If people are planning to work on specific things in 2.8 please let us know so we can incorporate this into our plans. If you’re interested in working on anything in the document, please also let us know or talk with us in one of the planning meetings.
  • At this point we believe we’ve made our final release for the sumo (2.5) series
  • The project is planning to adopt SPDX license headers in its source code where practical, bitbake has had these merged as a first step.
  • We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs

Planned Releases for YP 2.8:

  • TBA

Planned upcoming dot releases:

  • YP 2.6.3 (Thud) is in planning
  • YP 2.7.1 (Warrior) is in planning

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features