== Yocto Project Weekly Status Dec. 9th, 2025 ==
== Yocto Project Weekly Status Dec. 16th, 2025 ==
Current Dev Position: YP 5.3 M4 - Final Build QA and Release<br/>
Current Dev Position: YP 6.0 M1<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Dec. 11th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Dec. 18th at 7:30 am PST, then Thursday 8th Jan 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Dec. 9th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Dec. 18th 8 am PDT, then Tuesday 6th Jan 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Dec. 11th 10am GMT and Monday Dec. 13th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Dec. 18th 10am GMT and Monday Dec. 22th 9am PDT, then Monday 5th January 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.14 was released
*YP 5.3 was released, thanks to everyone who helped make it happen!
*YP 5.3 rc4 has passed QA and is under review
*YP 4.0.32 is in QA
*The 5.3 QA report is available and no major release blocking issues were found so we should be able to finally make the release.
*The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
*There was an announcement about the new project roles: https://lists.openembedded.org/g/openembedded-architecture/message/2207
*Welcome to Paul and Yoann in their new roles and huge thanks to Steve!
*Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
*Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
Line 22: Line 20:
**Allowing symlinking of local existing repos into the build instead of fetching
**Allowing symlinking of local existing repos into the build instead of fetching
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
*We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved
*We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 43: Line 41:


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M4 in review for release.
*YP 5.3 M4 is released.


'''YP 6.0 Milestone Dates:'''<br/>
'''YP 6.0 Milestone Dates:'''<br/>
Line 57: Line 55:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.14 was released.
*YP 4.0.32 is in QA.
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16
*YP 5.0.15 Release Date 2026-01-16

Latest revision as of 15:51, 16 December 2025

Yocto Project Weekly Status Dec. 16th, 2025

Current Dev Position: YP 6.0 M1
Next Deadline: YP 6.0 M1 Build Date 2026-01-05

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 was released, thanks to everyone who helped make it happen!
  • YP 4.0.32 is in QA
  • The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
  • Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
  • We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
  • Further bitbake-setup changes under discussion for the new development cycle:
    • defaulting to a common sstate directory and hashequiv server
    • Allowing symlinking of local existing repos into the build instead of fetching
  • The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
  • We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M4 is released.

YP 6.0 Milestone Dates:

  • YP 6.0 M1 Build Date 2026-01-05
  • YP 6.0 M1 Release Date 2026-01-16
  • YP 6.0 M2 Build Date 2026-02-02
  • YP 6.0 M2 Release Date 2026-02-13
  • YP 6.0 M3 Build Date 2026-03-02
  • YP 6.0 M3 Release Date 2026-03-13
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26


Upcoming dot releases:

  • YP 4.0.32 is in QA.
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16
  • YP 5.3.1 Build Date 2026-01-12
  • YP 5.3.1 Release Date 2026-01-23
  • YP 4.0.33 Build Date 2026-01-26
  • YP 4.0.33 Release Date 2026-01-30
  • YP 5.0.16 Build Date 2026-02-09
  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Build Date 2026-02-16
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives