Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status Nov. 4th, 2025 ==
== Yocto Project Weekly Status Nov.11th, 2025 ==
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Nov. 6th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Nov. 13th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Nov. 4th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Nov. 11th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Nov. 6th 10am GMT and Monday Nov. 10th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Nov. 13th 10am GMT and Monday Nov. 17th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.13 was released
*YP 5.3 M3 was released
*YP 5.3 M3 is due to be released
*YP 4.0.31 is due to be released
*YP 4.0.31 is in QA
*We are not yet ready to build 5.3 as there are too many rough edges on bitbake-setup: https://lists.openembedded.org/g/openembedded-architecture/message/2199
*Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
*The documentation changes related to bitbake-setup merged, thanks to all who have helped on these.
*We plan to merge the documentation changes then stop updating the poky repository master branch.
*We are now no longer updating the poky master branch. The distro in meta-yocto remains. Long live poky.
*We are now past the feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
*Toaster is now working with bitbake-setup, huge thanks to David Reyna for resolving the issues there.
**check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
*Upstream linux kernel end-of-life’d 6.16 but we can’t get 6.17 working fully so we’ll be releasing with 6.16 and removing the 6.17 recipes (merged in error).
**Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
**The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
**The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
**Help welcomed to resolve these issues!
*Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. The 6.17 kernel has run into issues we don’t have availability/time to resolve unfortunately so we will have to release with 6.16.
*YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
*YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns but we are lacking patches.
*We removed tcp-wrappers from OE-Core. It was late in but this should have happened long ago and if anyone is using it, you probably shouldn’t be!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 38: Line 34:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 3103 (last week 3001) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 3048 (last week 3103) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1098 (last week 1091)
**Total patches found: 1067 (last week 1098)
**Patches in the Pending State: 153 (14%) [last week 153 (14%)]
**Patches in the Pending State: 175 (16%) [last week 153 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M3 is in review for release.
*YP 5.3 M3 was released.
*YP 5.3 M4 Build Date 2025-11-10
*YP 5.3 M4 Build Date 2025-11-10
*YP 5.3 M4 Release Date 2025-11-28
*YP 5.3 M4 Release Date 2025-11-28


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.13 was released.
*YP 4.0.31 is in review for release.
*YP 4.0.31 is in QA.
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 5.0.14 Release Date 2025-11-28

Revision as of 15:44, 11 November 2025

Yocto Project Weekly Status Nov.11th, 2025

Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release
Next Deadline: YP 5.3 M4 Build Date 2025-11-10

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M3 was released
  • YP 4.0.31 is due to be released
  • We are not yet ready to build 5.3 as there are too many rough edges on bitbake-setup: https://lists.openembedded.org/g/openembedded-architecture/message/2199
  • The documentation changes related to bitbake-setup merged, thanks to all who have helped on these.
  • We are now no longer updating the poky master branch. The distro in meta-yocto remains. Long live poky.
  • Toaster is now working with bitbake-setup, huge thanks to David Reyna for resolving the issues there.
  • Upstream linux kernel end-of-life’d 6.16 but we can’t get 6.17 working fully so we’ll be releasing with 6.16 and removing the 6.17 recipes (merged in error).
  • YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns but we are lacking patches.
  • We removed tcp-wrappers from OE-Core. It was late in but this should have happened long ago and if anyone is using it, you probably shouldn’t be!

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 was released.
  • YP 5.3 M4 Build Date 2025-11-10
  • YP 5.3 M4 Release Date 2025-11-28

Upcoming dot releases:

  • YP 4.0.31 is in review for release.
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives