Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status Sept. 23rd, 2025 ==
== Yocto Project Weekly Status Sept. 30th, 2025 ==
Current Dev Position: YP 5.3 M3<br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Sept. 25th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Oct. 2nd at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Sept. 23rd at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Sept. 30th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Sept. 25th 10am GMT and Monday Sept. 29th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Oct. 2nd 10am GMT and Monday Oct. 6th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.0.30 is in QA
*YP 4.0.30 is under review for release
*YP 5.2.4 is in QA
*YP 5.3 M3 is due to build soon
*YP 5.3 M3 is due to build soon
*We’re at feature freeze for YP 5.3. There are three pending items we still aim to merge before building:
*We’re at feature freeze for YP 5.3. There are three pending items we still need to resolve before building:
**Fixing a reproducibility problem in perf from 6.16
**Fixing a reproducibility problem in perf from 6.16
**Split of llvm from clang
**Split of llvm from clang (currently blocked by uninative issues with llvm static libs)
**Merging of bitbake-setup once the autobuilder can use it
**Merging of bitbake-setup once the autobuilder can use it
*We aim to merge bitbake-setup before building 5.3 M3, work is currently being done to migrate the autobuilder to use it.
*We aim to merge bitbake-setup before building 5.3 M3, work is currently being done to migrate the autobuilder to use it.
Line 38: Line 39:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2846 (last week 2828) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2854 (last week 2846) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1105 (last week 1112)
**Total patches found: 1103 (last week 1105)
**Patches in the Pending State: 154 (14%) [last week 155 (14%)]
**Patches in the Pending State: 154 (14%) [last week 154 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


Line 51: Line 52:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.30 is in QA.
*YP 4.0.30 is ready for release.
*YP 5.2.4 Build Date 2025-09-29
*YP 5.2.4 is in QA.
*YP 5.2.4 Release Date 2025-10-10
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 5.0.13 Release Date 2025-10-24

Revision as of 14:39, 30 September 2025

Yocto Project Weekly Status Sept. 30th, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 4.0.30 is under review for release
  • YP 5.2.4 is in QA
  • YP 5.3 M3 is due to build soon
  • We’re at feature freeze for YP 5.3. There are three pending items we still need to resolve before building:
    • Fixing a reproducibility problem in perf from 6.16
    • Split of llvm from clang (currently blocked by uninative issues with llvm static libs)
    • Merging of bitbake-setup once the autobuilder can use it
  • We aim to merge bitbake-setup before building 5.3 M3, work is currently being done to migrate the autobuilder to use it.
  • This change will mean “poky” as a combo-layer repository will no longer be needed or updated.
  • Patch merging is continuing as long as the risk for the changes are low
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.
  • There is a proposal to the TSC requesting an exception to allow backporting of SPDX 3 support to scarthgap. Please comment on the list in support of or against this as appropriate, the TSC is leading towards granting the exception.
  • There are a couple of open Yocto Project positions which we’re in the process of advertising:
    • Ecosystem Engineering and Operations Lead
    • LTS Maintainer - Steve Sakoman is retiring in April 2026

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 4.0.30 is ready for release.
  • YP 5.2.4 is in QA.
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives