== Yocto Project Weekly Status October 8, 2019 ==
== Yocto Project Weekly Status October 15, 2019 ==
Current Dev Position: YP 2.8 M4 Feature Freeze<br/>
Current Dev Position: YP 3.0 Final Release<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>


'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>
*SWAT lead is currently: Chen
*SWAT lead is currently: Paul
*SWAT team rotation: Chen -> Paul on Oct. 11, 2019
*SWAT team rotation: Paul -> Ross on Oct. 18, 2019
*SWAT team rotation: Paul -> Ross on Oct. 18, 2019
*SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Oct. 10th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Oct. 17th at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting Tuesday Oct. 8th at 8am PDT (https://zoom.us/j/990892712)
*Monthly Project Meeting uesday Nov. 5th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (https://zoom.us/j/990892712)
*Twitch - Next event is Tuesday Oct. 8th at 8am PDT (https://www.twitch.tv/yocto_project)
*Twitch - Next event is Tuesday Nov. 12th at 8am PDT (https://www.twitch.tv/yocto_project)


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*The project is about to build M4 rc1 once some final tweaks have been tested and merged (details below).
*YP 3.0 was built and submitted to QA as 3.0 rc2 (rc1 had build failures).
*Known issues that have been or are to be addressed before M4 rc1 is built:
*There is a QA report from QA for 3.0 rc2. There were two issues raised from testing but these are both relatively minor issues that are unlikely to block release.
**Strace kernel timeout problems - the issue has now been reproduced and understood upstream and a patch has been found to address the issue. We therefore plan to include this in M4 rc1 (thanks Bruce)
*The release is therefore now pending a decision from the TSC on whether we should release.
**We upgraded to a new uninative version to ensure compatibility with distros shipping glibc 2.30 (thanks Michael/Armin).
*Master has started taking patches for post 3.0 to try and avoid any further backlog buildup.
**We resolved the systemd hwdb postinst script issues (thanks Ross)
*We plan to build 2.7.2, followed by 2.6.4 imminently, Armin has been preparing the branches.
*The eSDK performance issue has been worked around but removal of old sstate artefacts on the system however we ultimately do need to improve the code (will target 3.1).
*We have begun collecting ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.


'''Planned Releases for YP 3.0 {2.8}:'''<br/>
'''Planned Releases for YP 3.0 {2.8}:'''<br/>
*M4 Cutoff 30th Sept - this will be YP 3.0.
*YP 3.0 {2.8 (M4)} Final Release 25th Oct
*YP 3.0 {2.8 (M4)} Final Release 25th Oct


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
*YP 2.7.2 (Warrior) is planned this week.
*YP 2.6.4 (Thud) is planned for after YP 2.7.2  release.
*YP 2.6.4 (Thud) is planned for after YP 2.7.2  release.


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2525 (last week 2552) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2528 (last week 2525) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1448 (last week 1440)
**Total patches found: 1445 (last week 1448)
**Patches in the Pending State: 587 (41%) [last week 587 (41%)]
**Patches in the Pending State: 586 (41%) [last week 587 (41%)]


'''Key Status Links for YP:'''<br/>
'''Key Status Links for YP:'''<br/>

Revision as of 14:52, 15 October 2019

Yocto Project Weekly Status October 15, 2019

Current Dev Position: YP 3.0 Final Release
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Paul
  • SWAT team rotation: Paul -> Ross on Oct. 18, 2019
  • SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • YP 3.0 was built and submitted to QA as 3.0 rc2 (rc1 had build failures).
  • There is a QA report from QA for 3.0 rc2. There were two issues raised from testing but these are both relatively minor issues that are unlikely to block release.
  • The release is therefore now pending a decision from the TSC on whether we should release.
  • Master has started taking patches for post 3.0 to try and avoid any further backlog buildup.
  • We plan to build 2.7.2, followed by 2.6.4 imminently, Armin has been preparing the branches.
  • We have begun collecting ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
  • If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.

Planned Releases for YP 3.0 {2.8}:

  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) is planned this week.
  • YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC