Weekly Status: Difference between revisions
From Yocto Project
Jump to navigationJump to search
No edit summary |
|||
Line 1: | Line 1: | ||
== Yocto Project Weekly Status | == Yocto Project Weekly Status December 4, 2018 == | ||
Current Dev Position: YP 2.7 M1 <br/> | Current Dev Position: YP 2.7 M1 <br/> | ||
Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018<br/> | Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018<br/> | ||
Line 5: | Line 5: | ||
'''SWAT Team Rotation:'''<br/> | '''SWAT Team Rotation:'''<br/> | ||
*SWAT lead is currently: | *SWAT lead is currently: Amanda | ||
*SWAT team rotation: Amanda -> Chen on Dec. 7, 2018 | *SWAT team rotation: Amanda -> Chen on Dec. 7, 2018 | ||
*SWAT team rotation: Chen -> Armin on Nov. 30, 2018 | |||
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | *https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | ||
Line 31: | Line 31: | ||
'''Planned upcoming dot releases:'''<br/> | '''Planned upcoming dot releases:'''<br/> | ||
*YP 2.5.2 (Sumo) will be built soon. | |||
*YP 2.5.2 (Sumo) will be | |||
*YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done. | *YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done. | ||
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M4 is done. | *YP 2.5.3 (Sumo) will be targeted after YP 2.7 M4 is done. | ||
Line 38: | Line 37: | ||
'''Tracking Metrics:'''<br/> | '''Tracking Metrics:'''<br/> | ||
*WDD | *WDD 2425 (last week 2426) (https://wiki.yoctoproject.org/charts/combo.html) | ||
*Poky Patch Metrics | *Poky Patch Metrics | ||
**Total patches found: | **Total patches found: 1675 (last week 1682) | ||
**Percentage of patches in the Pending State: | **Percentage of patches in the Pending State: 736 (44%) [last week 734 (44%)] | ||
'''Key Status Links for YP:'''<br/> | '''Key Status Links for YP:'''<br/> |
Revision as of 15:36, 4 December 2018
Yocto Project Weekly Status December 4, 2018
Current Dev Position: YP 2.7 M1
Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018
SWAT Team Rotation:
- SWAT lead is currently: Amanda
- SWAT team rotation: Amanda -> Chen on Dec. 7, 2018
- SWAT team rotation: Chen -> Armin on Nov. 30, 2018
- https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Key Status/Updates:
- YP 2.4.4 (Rocko) is out of QA and being reviewed. It should release in the next few days. See the QA Report: https://wiki.yoctoproject.org/wiki/WW46_-_2018-11-14_-_Full_Test_Cycle_2.4.4_RC1 and the Release Criteria: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.4_Status#Yocto_Project_2.4.4_release
- The autobuilder was significantly reworked during the quiet period of the US holidays. There was a separate email sent out about the details of this:
http://lists.openembedded.org/pipermail/openembedded-core/2018-November/276436.html
- As part of those changes, all builds with the appropriate code (currently master+thud) now publish xml results files containing all the results of the automated testing. We now need tooling to better analyse and process these results into human readable summaries (especially for ptest) and to highlight regressions.
- We’d like to recognise Joshua Watt for some great work in automating SDK tests on meta-mingw. This is now active on the autobuilder for master testing 64 bit mingw builds.
- These changes also mean we now can test oe-selftest on all the distros we officially test upon. Unfortunately that has the side effect of highlighting how unstable oe-selftest has become. We’re in need to help to try and solve some of these issues. A separate email was sent out on this topic:
http://lists.openembedded.org/pipermail/openembedded-core/2018-November/276497.html
- Until the stability issues are resolved it will likely impact patch merging and divert attention away from other patches such as the sstate hash equivalence and perl/python version upgrades.
Planned Releases for YP 2.6:
- YP 2.7 M1 Cutoff is Dec. 10, 2018
- YP 2.7 M1 Release Target is Dec. 21, 2018
- YP 2.7 M2 Cutoff is Jan. 21, 2019
- YP 2.7 M2 Release Target is Feb. 1, 2019
- YP 2.7 M3 Cutoff is Feb. 25, 2019
- YP 2.7 M3 Release Target is Mar. 8, 2019
- YP 2.7 M4 Cutoff is Apr. 1, 2019
- YP 2.7 M4 Release Target is Apr. 26, 2019
Planned upcoming dot releases:
- YP 2.5.2 (Sumo) will be built soon.
- YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
- YP 2.5.3 (Sumo) will be targeted after YP 2.7 M4 is done.
- YP 2.6.2 (Thud) will be targeted after YP 2.5.3 is done.
Tracking Metrics:
- WDD 2425 (last week 2426) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1675 (last week 1682)
- Percentage of patches in the Pending State: 736 (44%) [last week 734 (44%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features