== Yocto Project Weekly Status Jan. 13th, 2026 ==
== Yocto Project Status 10 February 2026 ==
Current Dev Position: YP 6.0 M1<br/>
Current Dev Position: YP 6.0 M2<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>
Next Deadline: YP 6.0 M2 Build Date 2026-02-16<br/>
6
 
'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 15th Jan. 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 12th Feb. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 13th Jan. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 10rd Feb. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 15th Jan. 10am GMT and Monday 19th Jan. 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday 12th Feb. 10am GMT and Monday 16th Feb. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.15 is in QA
*YP 5.3.1 was released
*YP 6.0 M1 will build when the 5 open high bugs are resolved.
*YP 6.0 M1 was released
*We have a number of issues with build performance tests, test results and hanging glibc NFS tests on the autobuilder which need to be resolved before we can build a new release.
*YP 4.0.33 is in QA
*Due to the number of problems currently present, patch merging will have to slow to avoid adding any further issues.
*YP 6.0 M2 is due to build next week.
*Yoann Congal is starting to ramp up as the new LTS maintainer to take over from Steve Sakoman
*There are currently 5 high open bugs, which will block M2. Three have line of sight to being resolved:
*The linux kernel is now defaulting to 6.18 and the other versions will soon be removed.
**Issues reusing binaries from fedora 42/43 on older systems (#16087)
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
**rust do_test_compile/do_install segfault (#16058)
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
**Generation of releases.json needs updating (#16138)
*We will be entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved (https://bugzilla.yoctoproject.org/show_bug.cgi?id=16105)..
*Two are currently needing further work:
**x86 kvm broken on Fedora 43 (#16074)
**AB-INT: opkg-build segmentation fault (#16078)
*We are about to drop the 6.12 and 6.16 kernel recipes leaving just 6.18 for the next release
*The number of intermittent failures affecting builds, both stable and development, continues to be problematic - we continue to prioritise addressing these since any given build is now statistically likely to hit one or more of them.
*Patch review is now using two branches:
**“master-review”  - patches which pass on the autobuilder and will be discussed on the patch review call (https://git.openembedded.org/openembedded-core-contrib/log/?h=master-review)
**“master-backlog” - patches which have been discussed and need further investigation or more detailed feedback which we haven’t had time for yet (https://git.openembedded.org/openembedded-core-contrib/log/?h=master-backlog)
*Patches are merging but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
 


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 31: Line 40:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 3026 (last week 3011) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2973 (last week 2945) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1089 (last week 1092)
**Total patches found: 1106 (last week 1100)
**Patches in the Pending State: 151 (14%) [last week 151 (14%)]
**Patches in the Pending State: 152 (14%) [last week 152 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/


'''YP 6.0 Milestone Dates:'''<br/>
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M1 Build Date 2026-01-05
*YP 6.0 M2 Build Date 2026-02-16
*YP 6.0 M1 Release Date 2026-01-16
*YP 6.0 M2 Release Date 2026-02-27
*YP 6.0 M2 Build Date 2026-02-02
*YP 6.0 M3 Build Date 2026-03-09
*YP 6.0 M2 Release Date 2026-02-13
*YP 6.0 M3 Release Date 2026-03-20
*YP 6.0 M3 Build Date 2026-03-02
*YP 6.0 M3 Release Date 2026-03-13
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26
*YP 6.0 M4 Release Date 2026-04-26


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.15 in QA.
*YP 4.0.33 is in QA.
*YP 5.3.1 Build Date 2026-01-12
*YP 5.3.1 Release Date 2026-01-23
*YP 4.0.33 Build Date 2026-01-26
*YP 4.0.33 Release Date 2026-01-30
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.16 Release Date 2026-02-20
*YP 5.0.16 Release Date 2026-02-20

Latest revision as of 15:43, 10 February 2026

Yocto Project Status 10 February 2026

Current Dev Position: YP 6.0 M2
Next Deadline: YP 6.0 M2 Build Date 2026-02-16

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3.1 was released
  • YP 6.0 M1 was released
  • YP 4.0.33 is in QA
  • YP 6.0 M2 is due to build next week.
  • There are currently 5 high open bugs, which will block M2. Three have line of sight to being resolved:
    • Issues reusing binaries from fedora 42/43 on older systems (#16087)
    • rust do_test_compile/do_install segfault (#16058)
    • Generation of releases.json needs updating (#16138)
  • Two are currently needing further work:
    • x86 kvm broken on Fedora 43 (#16074)
    • AB-INT: opkg-build segmentation fault (#16078)
  • We are about to drop the 6.12 and 6.16 kernel recipes leaving just 6.18 for the next release
  • The number of intermittent failures affecting builds, both stable and development, continues to be problematic - we continue to prioritise addressing these since any given build is now statistically likely to hit one or more of them.
  • Patch review is now using two branches:
  • Patches are merging but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.


Ways to contribute:

New to the project?

Tracking Metrics:

YP 6.0 Milestone Dates:

  • YP 6.0 M2 Build Date 2026-02-16
  • YP 6.0 M2 Release Date 2026-02-27
  • YP 6.0 M3 Build Date 2026-03-09
  • YP 6.0 M3 Release Date 2026-03-20
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26

Upcoming dot releases:

  • YP 4.0.33 is in QA.
  • YP 5.0.16 Build Date 2026-02-09
  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Build Date 2026-02-16
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives