== Yocto Project Weekly Status Sept. 21, 2021 ==
== Yocto Project Weekly Status Dec. 16th, 2025 ==
Current Dev Position: YP 3.4 M4<br/>
Current Dev Position: YP 6.0 M1<br/>
Next Deadline: 4th Oct. 2021 YP 3.4 M4 build<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Sept. 23rd at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Dec. 18th at 7:30 am PST, then Thursday 8th Jan 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Oct. 5th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Dec. 18th 8 am PDT, then Tuesday 6th Jan 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Sept. 21st at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday  Dec. 18th 10am GMT and Monday  Dec. 22th 9am PDT, then Monday 5th January 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Twitch -  See https://www.twitch.tv/theyoctojester
 
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 3.3.3 was released
*YP 5.3 was released, thanks to everyone who helped make it happen!
*YP 3.1.11 is in QA.
*YP 4.0.32 is in QA
*The public hash equivalence and sstate share highlighted some issues where builds from sstate were not as optimal as they could be. There are a number of related patches on the mailing list, some are more invasive than others and are marked as RFC. They do fix and improve valid issues but some may be too invasive at this point of the release.
*The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
*The output hash timestamp issues were resolved and this has improved state reuse.
*Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
*Fixes for a number of open bugs in bugzilla have been posted but some have implications for other layers (e.g. accounting site info in task hashes).
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
*Intermittent issues are ongoing and help is very much welcome on these issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
*Further bitbake-setup changes under discussion for the new development cycle:
**defaulting to a common sstate directory and hashequiv server
**Allowing symlinking of local existing repos into the build instead of fetching
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
*We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs that are currently unassigned for YP 3.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enhancements.2FBugs
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*There are bugs that are currently unassigned for YP 6.0. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_6.0_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''YP 3.4 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 3.4 M4 build date 2021/10/04
*WDD 2978 (last week 2963) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.4 M4 Release date 2021/10/29
*OE-Core/Poky Patch Metrics
**Total patches found: 1086 (last week 1080)
**Patches in the Pending State: 152 (14%) [last week 152 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Planned upcoming dot releases:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 3.3.3 is released
*YP 5.3 M4 is released.
*YP 3.1.11 is in QA
*YP 3.1.11 release date 2021/9/24


'''Tracking Metrics:'''<br/>
'''YP 6.0 Milestone Dates:'''<br/>
*WDD 2641 (last week 2623) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 6.0 M1 Build Date 2026-01-05
*Poky Patch Metrics 
*YP 6.0 M1 Release Date 2026-01-16
**Total patches found: 1303 (last week 1304)
*YP 6.0 M2 Build Date 2026-02-02
**Patches in the Pending State: 484 (37%) [last week 484 (37%)]
*YP 6.0 M2 Release Date 2026-02-13
*YP 6.0 M3 Build Date 2026-03-02
*YP 6.0 M3 Release Date 2026-03-13
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26
 
 
'''Upcoming dot releases:'''<br/>
*YP 4.0.32 is in QA.
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16
*YP 5.3.1 Build Date 2026-01-12
*YP 5.3.1 Release Date 2026-01-23
*YP 4.0.33 Build Date 2026-01-26
*YP 4.0.33 Release Date 2026-01-30
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.16 Release Date 2026-02-20
*YP 5.3.2 Build Date 2026-02-16
*YP 5.3.2 Release Date 2026-02-27
*YP 4.0.34 Build Date 2026-02-23
*YP 4.0.34 Release Date 2026-03-06
*YP 5.3.3 Build Date 2026-03-09
*YP 5.3.3 Release Date 2026-03-20
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 41: Line 85:


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]

Latest revision as of 15:51, 16 December 2025

Yocto Project Weekly Status Dec. 16th, 2025

Current Dev Position: YP 6.0 M1
Next Deadline: YP 6.0 M1 Build Date 2026-01-05

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 was released, thanks to everyone who helped make it happen!
  • YP 4.0.32 is in QA
  • The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
  • Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
  • We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
  • Further bitbake-setup changes under discussion for the new development cycle:
    • defaulting to a common sstate directory and hashequiv server
    • Allowing symlinking of local existing repos into the build instead of fetching
  • The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
  • We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M4 is released.

YP 6.0 Milestone Dates:

  • YP 6.0 M1 Build Date 2026-01-05
  • YP 6.0 M1 Release Date 2026-01-16
  • YP 6.0 M2 Build Date 2026-02-02
  • YP 6.0 M2 Release Date 2026-02-13
  • YP 6.0 M3 Build Date 2026-03-02
  • YP 6.0 M3 Release Date 2026-03-13
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26


Upcoming dot releases:

  • YP 4.0.32 is in QA.
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16
  • YP 5.3.1 Build Date 2026-01-12
  • YP 5.3.1 Release Date 2026-01-23
  • YP 4.0.33 Build Date 2026-01-26
  • YP 4.0.33 Release Date 2026-01-30
  • YP 5.0.16 Build Date 2026-02-09
  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Build Date 2026-02-16
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives