== Yocto Project Weekly Status Oct. 20, 2020 ==
== Yocto Project Weekly Status Dec. 16th, 2025 ==
Current Dev Position: YP 3.2 M4<br/>
Current Dev Position: YP 6.0 M1<br/>
Next Deadline: YP 3.2 M4 Feature Freeze - Now<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Oct. 22nd at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Dec. 18th at 7:30 am PST, then Thursday 8th Jan 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Nov. 3rd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Dec. 18th 8 am PDT, then Tuesday 6th Jan 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Oct. 20th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday  Dec. 18th 10am GMT and Monday  Dec. 22th 9am PDT, then Monday 5th January 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Twitch -  See https://www.twitch.tv/theyoctojester
 
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 3.1.3 has been released.
*YP 5.3 was released, thanks to everyone who helped make it happen!
*We are now (over)due to build M4 rc1. There are currently three high bugs blocking the final M4 build, a buildtools issue where buildtools needs updating in the install script, a toaster issue with recent bitbake cooker process changes and a missing kea init script..
*YP 4.0.32 is in QA
*Major pseudo changes have been merged and are now testing cleanly on the testing infrastructure. The known community reported issues have also been resolved and a couple of underlying pseudo bugs discovered and fixed too. Interestingly there was around a 2GB reduction in the size of the pseudo databases for core-image-sato after the path filtering was added.
*The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
*Victor did some great work in understanding why qemumips was so much slower than qemumips64 and by changing the number of TLBs (easy in software!). we were able to see a 40% speedup in 32 mips qemu test execution times. A further piece of good news is upstream look willing to add functionality which lets us configure the number of TLBs so we shouldn’t have to maintain anything out of tree, thanks Victor!
*Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
*Unfortunately, intermittent autobuilder issues are still occurring, whilst reducing in frequency and number, possibly due to less frequency full rebuilds. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT Help with any of these would be much appreciated, unfortunately it is proving hard to find anyone interested in helping figure these out and they significantly hamper our testing.
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
*Further bitbake-setup changes under discussion for the new development cycle:
**defaulting to a common sstate directory and hashequiv server
**Allowing symlinking of local existing repos into the build instead of fetching
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
*We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs that are currently unassigned for YP 3.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.2_Unassigned_Enhancements.2FBugs
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*There are bugs that are currently unassigned for YP 6.0. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_6.0_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''YP 3.2 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 3.2 M4 build date 2020/10/5
*WDD 2978 (last week 2963) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.2 M4 Release date 2020/10/30
*OE-Core/Poky Patch Metrics
**Total patches found: 1086 (last week 1080)
**Patches in the Pending State: 152 (14%) [last week 152 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Planned upcoming dot releases:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 3.1.4 build date 2020/11/2
*YP 5.3 M4 is released.
*YP 3.1.4 release date 2020/11/13


'''Tracking Metrics:'''<br/>
'''YP 6.0 Milestone Dates:'''<br/>
*WDD 2526 (last week 2506) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 6.0 M1 Build Date 2026-01-05
*Poky Patch Metrics 
*YP 6.0 M1 Release Date 2026-01-16
**Total patches found: 1276 (last week 1273)
*YP 6.0 M2 Build Date 2026-02-02
**Patches in the Pending State: 495 (39%) [last week 494 (39%)]
*YP 6.0 M2 Release Date 2026-02-13
*YP 6.0 M3 Build Date 2026-03-02
*YP 6.0 M3 Release Date 2026-03-13
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26
 
 
'''Upcoming dot releases:'''<br/>
*YP 4.0.32 is in QA.
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16
*YP 5.3.1 Build Date 2026-01-12
*YP 5.3.1 Release Date 2026-01-23
*YP 4.0.33 Build Date 2026-01-26
*YP 4.0.33 Release Date 2026-01-30
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.16 Release Date 2026-02-20
*YP 5.3.2 Build Date 2026-02-16
*YP 5.3.2 Release Date 2026-02-27
*YP 4.0.34 Build Date 2026-02-23
*YP 4.0.34 Release Date 2026-03-06
*YP 5.3.3 Build Date 2026-03-09
*YP 5.3.3 Release Date 2026-03-20
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 39: Line 85:


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]

Latest revision as of 15:51, 16 December 2025

Yocto Project Weekly Status Dec. 16th, 2025

Current Dev Position: YP 6.0 M1
Next Deadline: YP 6.0 M1 Build Date 2026-01-05

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 was released, thanks to everyone who helped make it happen!
  • YP 4.0.32 is in QA
  • The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
  • Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
  • We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
  • Further bitbake-setup changes under discussion for the new development cycle:
    • defaulting to a common sstate directory and hashequiv server
    • Allowing symlinking of local existing repos into the build instead of fetching
  • The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
  • We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M4 is released.

YP 6.0 Milestone Dates:

  • YP 6.0 M1 Build Date 2026-01-05
  • YP 6.0 M1 Release Date 2026-01-16
  • YP 6.0 M2 Build Date 2026-02-02
  • YP 6.0 M2 Release Date 2026-02-13
  • YP 6.0 M3 Build Date 2026-03-02
  • YP 6.0 M3 Release Date 2026-03-13
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26


Upcoming dot releases:

  • YP 4.0.32 is in QA.
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16
  • YP 5.3.1 Build Date 2026-01-12
  • YP 5.3.1 Release Date 2026-01-23
  • YP 4.0.33 Build Date 2026-01-26
  • YP 4.0.33 Release Date 2026-01-30
  • YP 5.0.16 Build Date 2026-02-09
  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Build Date 2026-02-16
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05