== Yocto Project Weekly Status January 14, 2020 ==
== Yocto Project Weekly Status Dec. 16th, 2025 ==
Current Dev Position: YP 3.1 M2 <br/>
Current Dev Position: YP 6.0 M1<br/>
Next Deadline: YP 3.1 M2 build date 1/20/2020<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Jan. 16th  at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting - Thursday Dec. 18th at 7:30 am PST, then Thursday 8th Jan 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Fab. 4th  at 8am PDT (https://zoom.us/j/990892712)
*Weekly Project Engineering Sync - Tuesday Dec. 18th 8 am PDT, then Tuesday 6th Jan 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Jan. 14th at 8am PDT (https://zoom.us/j/990892712)
*Yocto Project Patch Review - Thursday  Dec. 18th 10am GMT and Monday  Dec. 22th 9am PDT, then Monday 5th January 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Twitch - Next event is Tuesday Jan. 14th at 8am PDT (https://www.twitch.tv/yocto_project)


'''Tip of the Week:'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
*‘oe-pkgdata-browser’ is a new handy small helper UI added by Ross to visualise the pkgdata held within a build.
*(anyone with tips they’d like to see here, please send to Stephen or Richard)


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 3.1 M2 is due to be built next week.
*YP 5.3 was released, thanks to everyone who helped make it happen!
*Patch merging is roughly on track however there are a number of failures identified with key patches (glibc has a prelink issue on mips, python 3.8 upgrade blocked on uid issue, gstreamer meson transition blocked on nodistro failure). Most of these issues are making progress over time.
*YP 4.0.32 is in QA
*The more worrying aspect is that there are a number of recurring/intermittent failures in the automated testing, mostly from selftest and testimage.
*The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
*Looking at the build history, “full” images have built cleanly only once in the past month (3 times in the last two months), which is a pretty shocking statistic which summarises the challenges we face there. Most of these are being procrastinated on by the bug owners since we can’t reproduce them at will. We really need help working on these kinds of issues.
*Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
*We have changed the sstate mirrors to be per release, simply to lower the numbers of files in any given sstate directory.
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
*The triage team is worried about attendance at triage meetings and the project is finding it hard to find people to help fix bugs. If anyone is willing to work on bugs, assistance would be greatly appreciated.
*Further bitbake-setup changes under discussion for the new development cycle:
**defaulting to a common sstate directory and hashequiv server
**Allowing symlinking of local existing repos into the build instead of fetching
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
*We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.


'''Proposed YP 3.1 Milestone Dates'''<br/>
'''Ways to contribute:'''<br/>
*YP 3.1 M2 build date 1/20/2020
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 3.1 M2 release date 1/31/2020
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*YP 3.1 M3 build date 2/24/2020
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*YP 3.1 M3 release date 3/6/2020
*There are bugs that are currently unassigned for YP 6.0. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_6.0_Unassigned_Enhancements/Bugs
*YP 3.1 M4 build date  3/30/2020
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*YP 3.1 M4 release date  4/24/2020
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''Planned upcoming dot releases:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.7.3 build date  2/10/2020
*WDD 2978 (last week 2963) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.7.3 release date 2/21/2020
*OE-Core/Poky Patch Metrics
*YP 3.0.2 build date  2/3/2020
**Total patches found: 1086 (last week 1080)
*YP 3.0.2 release date 2/14/2020
**Patches in the Pending State: 152 (14%) [last week 152 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Tracking Metrics:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*WDD 2773 (last week 2773) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.3 M4 is released.
*Poky Patch Metrics 
 
**Total patches found: 1411 (last week 1400)
'''YP 6.0 Milestone Dates:'''<br/>
**Patches in the Pending State: 562 (40%) [last week 562 (40%)]
*YP 6.0 M1 Build Date 2026-01-05
*YP 6.0 M1 Release Date 2026-01-16
*YP 6.0 M2 Build Date 2026-02-02
*YP 6.0 M2 Release Date 2026-02-13
*YP 6.0 M3 Build Date 2026-03-02
*YP 6.0 M3 Release Date 2026-03-13
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26
 
 
'''Upcoming dot releases:'''<br/>
*YP 4.0.32 is in QA.
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16
*YP 5.3.1 Build Date 2026-01-12
*YP 5.3.1 Release Date 2026-01-23
*YP 4.0.33 Build Date 2026-01-26
*YP 4.0.33 Release Date 2026-01-30
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.16 Release Date 2026-02-20
*YP 5.3.2 Build Date 2026-02-16
*YP 5.3.2 Release Date 2026-02-27
*YP 4.0.34 Build Date 2026-02-23
*YP 4.0.34 Release Date 2026-03-06
*YP 5.3.3 Build Date 2026-03-09
*YP 5.3.3 Release Date 2026-03-20
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 45: Line 85:


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]

Latest revision as of 15:51, 16 December 2025

Yocto Project Weekly Status Dec. 16th, 2025

Current Dev Position: YP 6.0 M1
Next Deadline: YP 6.0 M1 Build Date 2026-01-05

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 was released, thanks to everyone who helped make it happen!
  • YP 4.0.32 is in QA
  • The project will be taking a break from our regular meetings from 24th December until 4th January for the holidays.
  • Patches for master are merging and the builds are looking greener, there is a problem with the test result regression reports still causing failures as well as some check-layer issues.
  • We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
  • Further bitbake-setup changes under discussion for the new development cycle:
    • defaulting to a common sstate directory and hashequiv server
    • Allowing symlinking of local existing repos into the build instead of fetching
  • The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
  • We are considering entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M4 is released.

YP 6.0 Milestone Dates:

  • YP 6.0 M1 Build Date 2026-01-05
  • YP 6.0 M1 Release Date 2026-01-16
  • YP 6.0 M2 Build Date 2026-02-02
  • YP 6.0 M2 Release Date 2026-02-13
  • YP 6.0 M3 Build Date 2026-03-02
  • YP 6.0 M3 Release Date 2026-03-13
  • YP 6.0 M4 Build Date 2026-03-30
  • YP 6.0 M4 Release Date 2026-04-26


Upcoming dot releases:

  • YP 4.0.32 is in QA.
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16
  • YP 5.3.1 Build Date 2026-01-12
  • YP 5.3.1 Release Date 2026-01-23
  • YP 4.0.33 Build Date 2026-01-26
  • YP 4.0.33 Release Date 2026-01-30
  • YP 5.0.16 Build Date 2026-02-09
  • YP 5.0.16 Release Date 2026-02-20
  • YP 5.3.2 Build Date 2026-02-16
  • YP 5.3.2 Release Date 2026-02-27
  • YP 4.0.34 Build Date 2026-02-23
  • YP 4.0.34 Release Date 2026-03-06
  • YP 5.3.3 Build Date 2026-03-09
  • YP 5.3.3 Release Date 2026-03-20
  • YP 5.0.17 Build Date 2026-03-16
  • YP 5.0.17 Release Date 2026-03-23
  • YP 4.0.35 Build Date 2026-04-06
  • YP 4.0.35 Release Date 2026-04-17
  • YP 5.3.4 Build Date 2026-04-13
  • YP 5.3.4 Release Date 2026-04-24
  • YP 5.0.18 Build Date 2026-04-20
  • YP 5.0.18 Release Date 2026-05-01
  • YP 5.0.19 Build Date 2026-05-26
  • YP 5.0.19 Release Date 2026-06-05