Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yocto Project Weekly Status June 24th, 2025 ==
== Yocto Project Weekly Status Nov. 4th, 2025 ==
Current Dev Position: YP 5.3 M2<br/>
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday June 26th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Nov. 6th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday June 24th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Nov. 4th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday June 26th 10am GMT and Monday June 30th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Nov. 6th 10am GMT and Monday Nov. 10th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3 M1 is in QA
*YP 5.0.13 was released
*Patches continue to merge into master for upgrades and fixes.
*YP 5.3 M3 is due to be released
*The UNPACKDIR layout changes merged. This has been disruptive for layers and it will take a while for changes to filter through various layers. It does set up better in the future with tools like devtool to avoid having lots of legacy layouts to support, and cleans up git recipes to be easier to write going forward.
*YP 4.0.31 is in QA
*To support this, the layer series was updated to whinlatter in core.
*Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
*The clang build time and size increases continue to cause significant concern.
*We plan to merge the documentation changes then stop updating the poky repository master branch.
*There are patches in progress for improving gomod support in devtool and the mirroring issue for gomod was resolved.The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*We are now past the feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
*Support for BUILDHISTORY_RESET was removed as it was error prone and better handled on the CI side of integration.
**check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
*OE-Core is adopting the use of glvnd for libGL abstraction
**Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
*The initial RISC-V tune changes merged
**The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
*Support for distro/machine selection with builtin fragments was added.
**The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
*A section was added to the manual on primary and secondary architecture/feature support for Yocto Project: https://docs.yoctoproject.org/dev/ref-manual/yocto-project-supported-features.html
**Help welcomed to resolve these issues!
*An email about this was sent to the openembedded-architecture list: https://lists.openembedded.org/g/openembedded-architecture/message/2162
*Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. The 6.17 kernel has run into issues we don’t have availability/time to resolve unfortunately so we will have to release with 6.16.
*For M2, the following changes have been mentioned as possibilities:
*YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
**bitbake-setup
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.
**wic split from OE-Core
**RISC-V tune changes (part 2)
**go/gomod fetcher changes
**switch classextend to use [filter] support from bitbake


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 42: Line 38:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2778 (last week 2777) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 3103 (last week 3001) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1093 (last week 1084)
**Total patches found: 1098 (last week 1091)
**Patches in the Pending State: 157 (14%) [last week 158 (19%)]
**Patches in the Pending State: 153 (14%) [last week 153 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M1 in QSA.
*YP 5.3 M3 is in review for release.
*YP 5.3 M2 Build Date 2025-07-21
*YP 5.3 M4 Build Date 2025-11-10
*YP 5.3 M2 Release Date 2025-08-01
*YP 5.3 M4 Release Date 2025-11-28
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M4 Build Date 2025-10-06
*YP 5.3 M4 Release Date 2025-10-31


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.28 Build Date 2025-06-30
*YP 5.0.13 was released.
*YP 4.0.28 Release Date 2025-07-11
*YP 4.0.31 is in QA.
*YP 5.2.2 Build Date 2025-07-07
*YP 5.2.2 Release Date 2025-07-18
*YP 5.0.11 Build Date 2025-07-14
*YP 5.0.11 Release Date 2025-07-25
*YP 4.0.29 Build Date 2025-08-11
*YP 4.0.29 Release Date 2025-08-25
*YP 5.2.3 Build Date 2025-08-18
*YP 5.2.3 Release Date 2025-08-29
*YP 5.0.12 Build Date 2025-08-25
*YP 5.0.12 Release Date 2025-09-05
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Release Date 2025-10-03
*YP 5.2.4 Build Date 2025-09-29
*YP 5.2.4 Release Date 2025-10-10
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 4.0.31 Build Date 2025-11-03
*YP 4.031 Release Date 2025-11-14
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 5.0.14 Release Date 2025-11-28

Latest revision as of 15:52, 4 November 2025

Yocto Project Weekly Status Nov. 4th, 2025

Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release
Next Deadline: YP 5.3 M4 Build Date 2025-11-10

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.0.13 was released
  • YP 5.3 M3 is due to be released
  • YP 4.0.31 is in QA
  • Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
  • We plan to merge the documentation changes then stop updating the poky repository master branch.
  • We are now past the feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
    • check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
    • Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
    • The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
    • The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
    • Help welcomed to resolve these issues!
  • Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. The 6.17 kernel has run into issues we don’t have availability/time to resolve unfortunately so we will have to release with 6.16.
  • YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 is in review for release.
  • YP 5.3 M4 Build Date 2025-11-10
  • YP 5.3 M4 Release Date 2025-11-28

Upcoming dot releases:

  • YP 5.0.13 was released.
  • YP 4.0.31 is in QA.
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives