== Yocto Project Weekly Status Sept. 30th, 2025 ==
== Yocto Project Weekly Status Oct. 28th, 2025 ==
Current Dev Position: YP 5.3 M3<br/>
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Oct. 2nd at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Oct. 30th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Sept. 30th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Oct. 28th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Oct. 2nd 10am GMT and Monday Oct. 6th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Oct. 30th 10am GMT and Monday Nov. 3rd 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.0.30 is under review for release
*YP 5.3 M3 is in QA
*YP 5.2.4 is in QA
*YP 5.0.13 is under review for release
*YP 5.3 M3 is due to build soon
*Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
*We’re at feature freeze for YP 5.3. There are three pending items we still need to resolve before building:
*We have now past feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter.  Known issues:
**Fixing a reproducibility problem in perf from 6.16
**check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
**Split of llvm from clang (currently blocked by uninative issues with llvm static libs)
**Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
**Merging of bitbake-setup once the autobuilder can use it
**The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
*We aim to merge bitbake-setup before building 5.3 M3, work is currently being done to migrate the autobuilder to use it.
**The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
*This change will mean “poky” as a combo-layer repository will no longer be needed or updated.
**Help welcomed to resolve these issues!
*Patch merging is continuing as long as the risk for the changes are low
*Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. We are evaluating the situation with 6.17, feedback on it (for/against and known issues) would be welcome.
*“poky” as a combo-layer repository will soon no longer be needed or updated for master and whinlatter branches.
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.
*There is a proposal to the TSC requesting an exception to allow backporting of SPDX 3 support to scarthgap. Please comment on the list in support of or against this as appropriate, the TSC is leading towards granting the exception.
*There are a couple of open Yocto Project positions which we’re in the process of advertising:
**Ecosystem Engineering and Operations Lead
**LTS Maintainer  - Steve Sakoman is retiring in April 2026


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 39: Line 36:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2854 (last week 2846) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 3001 (last week 3009) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1103 (last week 1105)
**Total patches found: 1091 (last week 1091)
**Patches in the Pending State: 154 (14%) [last week 154 (14%)]
**Patches in the Pending State: 153 (14%) [last week 153 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 is in QA.
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M4 Build Date 2025-11-10
*YP 5.3 M4 Build Date 2025-10-06
*YP 5.3 M4 Release Date 2025-11-28
*YP 5.3 M4 Release Date 2025-10-31


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.30 is ready for release.
*YP 5.0.13 is in review for release.
*YP 5.2.4 is in QA.
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 4.0.31 Build Date 2025-11-03
*YP 4.0.31 Build Date 2025-11-03
*YP 4.031 Release Date 2025-11-14
*YP 4.0.31 Release Date 2025-11-14
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 5.0.14 Release Date 2025-11-28

Latest revision as of 14:50, 28 October 2025

Yocto Project Weekly Status Oct. 28th, 2025

Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release
Next Deadline: YP 5.3 M4 Build Date 2025-11-10

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M3 is in QA
  • YP 5.0.13 is under review for release
  • Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
  • We have now past feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
    • check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
    • Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
    • The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
    • The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
    • Help welcomed to resolve these issues!
  • Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. We are evaluating the situation with 6.17, feedback on it (for/against and known issues) would be welcome.
  • “poky” as a combo-layer repository will soon no longer be needed or updated for master and whinlatter branches.
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 is in QA.
  • YP 5.3 M4 Build Date 2025-11-10
  • YP 5.3 M4 Release Date 2025-11-28

Upcoming dot releases:

  • YP 5.0.13 is in review for release.
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.0.31 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives