== Yocto Project Weekly Status April 23rd, 2024 ==
== Yocto Project Weekly Status Oct. 28th, 2025 ==
Current Dev Position: YP 5.0 preparing to build rc2 <br/>
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Next Deadline: 1st April 2024 YP 5.0 M4 build<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday April 25th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Oct. 30th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday April 23rd at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Oct. 28th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch - See https://www.twitch.tv/theyoctojester
*Yocto Project Patch Review - Thursday Oct. 30th 10am GMT and Monday Nov. 3rd 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)
 
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0 rc1 is building but has many (6+) failures in the build so will have to be abandoned.
*YP 5.3 M3 is in QA
*The final dunfell build will follow 5.0 into QA.
*YP 5.0.13 is under review for release
*The master branch has diverged from scarthgap.
*Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
*For 5.0, we were able to switch to the new hash equivalence server however the need for websockets complicated the worker configuration and needed new buildtools tarball versions which are causing various problems.
*We have now past feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
*During the rc1 build as well as pip and setuptools issues within buildtools, we also saw a qemuppc boot issue, an instance of the spdx dependency problem, an sstate mirror issue and a github network error. This highlights how important fixing these is over the release cycle. The volume of these may impact our ability to maintain the LTS.
**check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
*Thanks to everyone who sent documentation patches, we’re in much better shape with the migration guide and release notes now. Further improvements are still very welcome.
**Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
*The “Binary Distro” work is now well underway and there are PR Server passthrough and image testing patches under review. The wiki page has had a number of policy/process proposals documented, help is welcome to help improve these, or highlight where further documentation is needed.
**The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
*There are patches for improving the build performance graphs in review. Sample output from the changes is here and here.
**The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
*There are also patches under review for the patch/cve metrics page to improve the usability.
**Help welcomed to resolve these issues!
*We continue to watch the NIST NVD (CVE database) situation, the recent update didn’t clarify much. Unfortunately there doesn’t appear to be a clear path forward as yet but using data directly from MITRE may help give partial information. These issues are making it hard to know what to include in the 5.0 release as it isn’t clear which changes are security related.
*Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. We are evaluating the situation with 6.17, feedback on it (for/against and known issues) would be welcome.
*“poky” as a combo-layer repository will soon no longer be needed or updated for master and whinlatter branches.
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*There are bugs that are currently unassigned for YP 5.0. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.0_Unassigned_Enhancements/Bugs
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics  
*Help us resolve CVE issues: CVE metrics  
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''YP 5.0 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 5.0 is in QA
*WDD 3001 (last week 3009) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.0 M4 Release date 2024/04/30
*OE-Core/Poky Patch Metrics
**Total patches found: 1091 (last week 1091)
**Patches in the Pending State: 153 (14%) [last week 153 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.1 Proposed Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.1 M1 Build date 2024-05-20
*YP 5.3 M3 is in QA.
*YP 5.1 M1 Release date 2024-05-31
*YP 5.3 M4 Build Date 2025-11-10
*YP 5.1 M2 Build date 2024-07-08
*YP 5.3 M4 Release Date 2025-11-28
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 3.1.33 is in QA
*YP 5.0.13 is in review for release.
*YP 3.1.33 Release date 2024-04-26
*YP 4.0.31 Build Date 2025-11-03
*YP 4.0.18 is in QA
*YP 4.0.31 Release Date 2025-11-14
*YP 4.0.18 Release date 2024-05-03
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.1 Build Date 2024-05-13
*YP 5.0.14 Release Date 2025-11-28
*YP 5.0.1 Release Date 2024-05-24
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.19 build date 2024-06-03
*YP 4.0.32 Release Date 2025-12-24
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.15 Release Date 2026-01-16
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29
 
'''Tracking Metrics:'''<br/>
*WDD 2714 (last week 2719) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
**Total patches found: 1140 (last week 1173)
**Patches in the Pending State: 249 (21%) [last week 249 (21%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 80: Line 62:


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]

Latest revision as of 14:50, 28 October 2025

Yocto Project Weekly Status Oct. 28th, 2025

Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release
Next Deadline: YP 5.3 M4 Build Date 2025-11-10

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M3 is in QA
  • YP 5.0.13 is under review for release
  • Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
  • We have now past feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
    • check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
    • Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
    • The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
    • The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
    • Help welcomed to resolve these issues!
  • Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. We are evaluating the situation with 6.17, feedback on it (for/against and known issues) would be welcome.
  • “poky” as a combo-layer repository will soon no longer be needed or updated for master and whinlatter branches.
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 is in QA.
  • YP 5.3 M4 Build Date 2025-11-10
  • YP 5.3 M4 Release Date 2025-11-28

Upcoming dot releases:

  • YP 5.0.13 is in review for release.
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.0.31 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: