Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yocto Project Weekly Status June 24th, 2025 ==
== Yocto Project Weekly Status Sept. 16th, 2025 ==
Current Dev Position: YP 5.3 M2<br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday June 26th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Sept. 18th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday June 24th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Sept. 16th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday June 26th 10am GMT and Monday June 30th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Sept. 18th 10am GMT and Monday Sept. 22nd 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3 M1 is in QA
*YP 5.2.3 was released.
*Patches continue to merge into master for upgrades and fixes.
*YP 5.0.12 was released.
*The UNPACKDIR layout changes merged. This has been disruptive for layers and it will take a while for changes to filter through various layers. It does set up better in the future with tools like devtool to avoid having lots of legacy layouts to support, and cleans up git recipes to be easier to write going forward.
*YP 5.3 M3 is due to build soon
*To support this, the layer series was updated to whinlatter in core.
*We’re at feature freeze for YP 5.3
*The clang build time and size increases continue to cause significant concern.
*We have now updated to the 6.16 linux kernel
*There are patches in progress for improving gomod support in devtool and the mirroring issue for gomod was resolved.The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*There are clang/llvm performance improvements we plan to merge before building 5.3 (Thanks Ross!)
*Support for BUILDHISTORY_RESET was removed as it was error prone and better handled on the CI side of integration.
*We aim to merge bitbake-setup before building 5.3 M3, work is currently being done to migrate the autobuilder to use it.
*OE-Core is adopting the use of glvnd for libGL abstraction
*This change will mean “poky” as a combo-layer repository will no longer be needed or updated.
*The initial RISC-V tune changes merged
*Patch merging is continuing as long as the risk for the changes are low
*Support for distro/machine selection with builtin fragments was added.
*There are a couple of open Yocto Project positions which we’re in the process of advertising:
*A section was added to the manual on primary and secondary architecture/feature support for Yocto Project: https://docs.yoctoproject.org/dev/ref-manual/yocto-project-supported-features.html
**Ecosystem Engineering and Operations Lead
*An email about this was sent to the openembedded-architecture list: https://lists.openembedded.org/g/openembedded-architecture/message/2162
**LTS Maintainer  - Steve Sakoman is retiring in April 2026
*For M2, the following changes have been mentioned as possibilities:
**bitbake-setup
**wic split from OE-Core
**RISC-V tune changes (part 2)
**go/gomod fetcher changes
**switch classextend to use [filter] support from bitbake


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 42: Line 36:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2778 (last week 2777) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2828 (last week 2835) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1093 (last week 1084)
**Total patches found: 1112 (last week 1111)
**Patches in the Pending State: 157 (14%) [last week 158 (19%)]
**Patches in the Pending State: 155 (14%) [last week 156 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M1 in QSA.
*YP 5.3 M2 Build Date 2025-07-21
*YP 5.3 M2 Release Date 2025-08-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M3 Release Date 2025-09-12
Line 58: Line 49:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.28 Build Date 2025-06-30
*YP 5.2.3 was released.
*YP 4.0.28 Release Date 2025-07-11
*YP 5.0.12 was released.
*YP 5.2.2 Build Date 2025-07-07
*YP 5.2.2 Release Date 2025-07-18
*YP 5.0.11 Build Date 2025-07-14
*YP 5.0.11 Release Date 2025-07-25
*YP 4.0.29 Build Date 2025-08-11
*YP 4.0.29 Release Date 2025-08-25
*YP 5.2.3 Build Date 2025-08-18
*YP 5.2.3 Release Date 2025-08-29
*YP 5.0.12 Build Date 2025-08-25
*YP 5.0.12 Release Date 2025-09-05
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Release Date 2025-10-03
*YP 4.0.30 Release Date 2025-10-03

Latest revision as of 14:40, 16 September 2025

Yocto Project Weekly Status Sept. 16th, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.2.3 was released.
  • YP 5.0.12 was released.
  • YP 5.3 M3 is due to build soon
  • We’re at feature freeze for YP 5.3
  • We have now updated to the 6.16 linux kernel
  • There are clang/llvm performance improvements we plan to merge before building 5.3 (Thanks Ross!)
  • We aim to merge bitbake-setup before building 5.3 M3, work is currently being done to migrate the autobuilder to use it.
  • This change will mean “poky” as a combo-layer repository will no longer be needed or updated.
  • Patch merging is continuing as long as the risk for the changes are low
  • There are a couple of open Yocto Project positions which we’re in the process of advertising:
    • Ecosystem Engineering and Operations Lead
    • LTS Maintainer - Steve Sakoman is retiring in April 2026

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 was released.
  • YP 5.0.12 was released.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives