== Yocto Project Weekly Status October 15, 2019 ==
== Yocto Project Weekly Status October 23, 2019 ==
Current Dev Position: YP 3.0 Final Release<br/>
Current Dev Position: YP 3.0 Final Release<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>
Next Deadline: YP 3.0 Final Release 25th Oct<br/>
Line 5: Line 5:
'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>
*SWAT lead is currently: Paul
*SWAT lead is currently: Paul
*SWAT team rotation: Paul -> Ross on Oct. 18, 2019
*SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
*SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
*SWAT team rotation: Amanda -> Armin on Nov. 1, 2019
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Oct. 17th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Oct. 24th at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting uesday Nov. 5th at 8am  PDT (https://zoom.us/j/990892712)
*Monthly Project Meeting Tuesday Nov. 5th at 8am  PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 15th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Oct. 22nd at 8am PDT (https://zoom.us/j/990892712)
*Twitch - Next event is Tuesday Nov. 12th at 8am PDT (https://www.twitch.tv/yocto_project)
*Twitch - Next event is Tuesday Nov. 12th at 8am PDT (https://www.twitch.tv/yocto_project)


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 3.0 was built and submitted to QA as 3.0 rc2 (rc1 had build failures).
*YP 3.0 as been approved by the TSC and should be released later this week. Only the final tweaks to the release notes remain.
*There is a QA report from QA for 3.0 rc2. There were two issues raised from testing but these are both relatively minor issues that are unlikely to block release.
*Master has continued taking patches for post 3.0.
*The release is therefore now pending a decision from the TSC on whether we should release.
*There are a number of intermittent failures on the autobuiler which are causing concern, there is a separate email about this.
*Master has started taking patches for post 3.0 to try and avoid any further backlog buildup.
*YP 2.6.4 was built and submitted to QA
*We plan to build 2.7.2, followed by 2.6.4 imminently, Armin has been preparing the branches.
*YP 2.7.2 was not built due to a remaining bug which needs to be resolved first
Next week is ELC-E and therefore may be quiet on the mailing lists with patch merging being delayed.
*We have begun collecting ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
*We have begun collecting ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
Line 28: Line 29:


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 2.7.2 (Warrior) is planned this week.
*YP 2.7.2 (Warrior) s planned this week (assuming the remaining bug is resolved).
*YP 2.6.4 (Thud) is planned for after YP 2.7.2  release.
*YP 2.6.4 (Thud) is in QA.


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2528 (last week 2525) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2498 (last week 2528) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1445 (last week 1448)
**Total patches found: 1432 (last week 1445)
**Patches in the Pending State: 586 (41%) [last week 587 (41%)]
**Patches in the Pending State: 578 (41%) [last week 586 (41%)]


'''Key Status Links for YP:'''<br/>
'''Key Status Links for YP:'''<br/>

Revision as of 14:51, 22 October 2019

Yocto Project Weekly Status October 23, 2019

Current Dev Position: YP 3.0 Final Release
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Paul
  • SWAT team rotation: Ross -> Amanda on Oct. 25, 2019
  • SWAT team rotation: Amanda -> Armin on Nov. 1, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • YP 3.0 as been approved by the TSC and should be released later this week. Only the final tweaks to the release notes remain.
  • Master has continued taking patches for post 3.0.
  • There are a number of intermittent failures on the autobuiler which are causing concern, there is a separate email about this.
  • YP 2.6.4 was built and submitted to QA
  • YP 2.7.2 was not built due to a remaining bug which needs to be resolved first

Next week is ELC-E and therefore may be quiet on the mailing lists with patch merging being delayed.

Planned Releases for YP 3.0 {2.8}:

  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) s planned this week (assuming the remaining bug is resolved).
  • YP 2.6.4 (Thud) is in QA.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives