Line 1: | Line 1: | ||
== Yocto Project Weekly Status | == Yocto Project Weekly Status August 6, 2019 == | ||
Current Dev Position: YP 2.8 M3<br/> | Current Dev Position: YP 2.8 M3<br/> | ||
Next Deadline: YP 2.8 Milestone M3 Cutoff (Feature Freeze) Aug 25, 2019<br/> | Next Deadline: YP 2.8 Milestone M3 Cutoff (Feature Freeze) Aug 25, 2019<br/> | ||
Line 5: | Line 5: | ||
'''SWAT Team Rotation:'''<br/> | '''SWAT Team Rotation:'''<br/> | ||
*SWAT lead is currently: | *SWAT lead is currently: Ross | ||
*SWAT team rotation: Ross -> Amanda on Aug. 9, 2019 | *SWAT team rotation: Ross -> Amanda on Aug. 9, 2019 | ||
*SWAT team rotation: Amanda -> Chen on Aug. 16, 2019 | |||
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | *https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | ||
'''Next Team Meetings:'''<br/> | '''Next Team Meetings:'''<br/> | ||
*Bug Triage meeting Thursday August | *Bug Triage meeting Thursday August 8th at 7:30am PDT (https://zoom.us/j/454367603) | ||
*Monthly Project Meeting August 6th at 8am PDT (https://zoom.us/j/990892712) | *Monthly Project Meeting August 6th at 8am PDT (https://zoom.us/j/990892712) | ||
*Twitch - Next event is August 6th at 8am PDT (https://www.twitch.tv/yocto_project) | *Twitch - Next event is August 6th at 8am PDT (https://www.twitch.tv/yocto_project) | ||
'''Key Status/Updates:'''<br/> | '''Key Status/Updates:'''<br/> | ||
*YP 2.8 M2 | *YP 2.8 M2 is due for release this week | ||
*YP 2.6.3 | *YP 2.6.3 is in QA | ||
*We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs | *We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs | ||
* | *This release which was 2.8 will now become 3.0 | ||
*The project is working on some mentor and mentee opportunities. Please see the separate email from Nicolas on the yocto list about this. | *The project is working on some mentor and mentee opportunities. Please see the separate email from Nicolas on the yocto list about this. | ||
*Patches to bitbake to enable the task scheduler to react to “equivalent” build output have merged. There is more information about this major change in a separate email: | |||
http://lists.openembedded.org/pipermail/openembedded-core/2019-August/285300.html | |||
*It is hoped this change should improve productivity and reduce rebuilds. | |||
*In making some of these changes, there were some API changes in bitbake, notably the removal of the bb.build.FuncFailed exception, the signature generator task representation changed and there were some siggen function API changes. | |||
libx11-diet was removed as its not really appropriate on a modern locale aware system. | |||
'''Planned Releases for YP 2.8:'''<br/> | '''Planned Releases for YP 2.8:'''<br/> |
Revision as of 14:51, 6 August 2019
Yocto Project Weekly Status August 6, 2019
Current Dev Position: YP 2.8 M3
Next Deadline: YP 2.8 Milestone M3 Cutoff (Feature Freeze) Aug 25, 2019
SWAT Team Rotation:
- SWAT lead is currently: Ross
- SWAT team rotation: Ross -> Amanda on Aug. 9, 2019
- SWAT team rotation: Amanda -> Chen on Aug. 16, 2019
- https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
- Bug Triage meeting Thursday August 8th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting August 6th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is August 6th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- YP 2.8 M2 is due for release this week
- YP 2.6.3 is in QA
- We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs
- This release which was 2.8 will now become 3.0
- The project is working on some mentor and mentee opportunities. Please see the separate email from Nicolas on the yocto list about this.
- Patches to bitbake to enable the task scheduler to react to “equivalent” build output have merged. There is more information about this major change in a separate email:
http://lists.openembedded.org/pipermail/openembedded-core/2019-August/285300.html
- It is hoped this change should improve productivity and reduce rebuilds.
- In making some of these changes, there were some API changes in bitbake, notably the removal of the bb.build.FuncFailed exception, the signature generator task representation changed and there were some siggen function API changes.
libx11-diet was removed as its not really appropriate on a modern locale aware system.
Planned Releases for YP 2.8:
- M2 is in QA
- M2 Release 26th July
- M3 Cutoff (Feature Freeze) 25th Aug
- M3 Release 6th Sept
- M4 Cutoff 30th Sept
- 2.8 (M4) Final Release 25th Oct
Planned upcoming dot releases:
- YP 2.7.2 (Warrior) is planned for after 2.8 M2 release.
- YP 2.6.3 (Thud) is intended for build after 2.7.1 is complete and before 2.8 M3.
Tracking Metrics:
- WDD 2483 (last week 2489) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1499 (last week 1502)
- Patches in the Pending State: 623 (42%) [last week 630 (42%)]