Yocto Project v1.2 Status: Difference between revisions
From Yocto Project
Jump to navigationJump to search
Line 61: | Line 61: | ||
= Yocto Project SWAT team = | = Yocto Project SWAT team = | ||
Chairperson of the current week: Darren Hart (darren.hart@intel.com) <br/> | Chairperson of the current week: Darren Hart (darren.hart@intel.com) <br/> <br/> | ||
Please see here for the details of the SWAT team: https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | Please see here for the details of the SWAT team: https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | ||
Revision as of 18:44, 12 January 2012
Yocto Project 1.2 release Status
Feature/Task Board
Scheduled | Design | Design Review | Development | Patch Review | Testing | Done | Blocked |
1277, M2, Shane, 9 | 1598, M2, Paul, 10 | 1634, M2, Bruce, 4 | 1582, M3, Joshua, 5 | 1555, M2, Lianhao, 2 | 1744, M2, Shane, 2 | 1461, M1, Beth, 0 | |
1615, M3, Richard, 0 | 1543, M2, ScottG, 2 | 1621, M2, Dexuan, 2 | 822, M3, Joshua, 1 | 1655, M2, Xiaofeng, 1 | 1748, M2, Shane, 2 | 1580, M1, Jessica, 0 | |
1581, M2, Shane, 3 | 1145, M2, ScottG, 2 | 1608, M2, Josh, 2 | 1590, M2, Wenzhong, 1 | 1805, M2, Jessica, 2 | 1627, M1, Beth, 0 | ||
1241, M2, Shane, 3 | 1656, M2, Kai, 1 | 1636, M3, Darren, 7 | 1630, M2, Tom, 1 | 1566, M2, Paul, 2 | 1564, M1, Dongxiao, 0 | ||
1763, M3, Saul, 0 | 1567, M1, Yi, 6 | 1589, M2, Liezhi, 1 | 1847, M2, Liming, 1 | 1644, M1, Bruce, 0 | |||
1584, M2, Jiajun, 2 | 1651, M2, Leizhi, 2 | 1126, M2, Lianhao, 1 | 1742, M1, Dongxiao, 0 | ||||
1614, M3, Daren, 0 | 1643, M2, Bruce, 2 | 1556, M2, Lianhao, 1 | 1743, M1, Dongxiao, 0 | ||||
1830, M3, Daren, 0 | 1764, M2, Belen, 2 | 1734, M2, Edwin, 1 | 1745, M1, Dongxiao, 0 | ||||
1649, M3, Daren, 0 | 1809, M2, Belen, 2 | 1272, M2, Dongxiao, 1 | 1747, M1, Dongxiao, 0 | ||||
1303, M2, Dongxiao, 3 | 1573, M3, Shane, 1 | 1572, M2, Dongxiao, 1 | 1732, M1, Dexuan, 0 | ||||
1729, M2, Dongxiao, 3 | 1678, M2, Tom, 1 | 1750, M2, Dongxiao, 1 | 1660, M1, Tom, 0 | ||||
1730, M2, Dongxiao, 3 | 1654, M2, Paul, 1 | 1752, M2, Dongxiao, 1 | 1661, M1, Tom, 0 | ||||
1595, M2, Jiajun, 1 | 1775, M2, Dongxiao, 1 | 1751, M1, Shane, 0 | |||||
1628, M2, Beth, 1 | 1787, M2, Dongxiao, 1 | 1565, M1, Paul, 0 | |||||
1629, M2, Beth, 1 | 1792, M2, Dongxiao, 1 | 1546, M1, Beth, 0 | |||||
1873, M2, Edwin, 1 | 1872, M2, Dongxiao, 1 | 1603, M1, Wenzhong, 0 | |||||
1629, M2, Beth, 1 | 1638, M2, Bruce, 1 | 1568, M1, Jiajun, 0 | |||||
1674, M1, Xiaofeng, 1 | 1776, M1, Beth, 0 | ||||||
1642, M2, Darren, 0 | |||||||
1647, M2, Daren, 0 | |||||||
1008, M1, ScottG, 0 |
Note: Each column lists "Feature #, Target Milestone, Owner, # of weeks in this stage".
Project Dashboard
Yocto Project SWAT team
Chairperson of the current week: Darren Hart (darren.hart@intel.com)
Please see here for the details of the SWAT team: https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Yocto Project 1.2 Release Criteria
Milestone 1
Release Criteria | Milestone 1 Target | Milestone 1 Status |
Functional Completion | All P1 features are completed. | See https://wiki.yoctoproject.org/wiki/Yocto_1.2_Schedule for details. |
Build and Release (Yocto) | All completed features can be built with no errors. | Complete |
Build and Release (BSPs) | Core and meta-intel BSPs can be built with no errors. | Complete |
Open Bugs | All bugs have been dispositioned. High issues have been fixed. | [1] - new bugs for 1.2. HIGH priority bugs - high bugs for 1.2 See trend chart at https://wiki.yoctoproject.org/wiki/Yocto_Bug_Trend. |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report |
Distros Tested | Fedora, Ubuntu, Opensuse current version | Fedora 15, Opensuse 11.4 and Ubuntu 11.04 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report |
Documentation | Doc for windows user to deploy a Yocto BSP image on the hardware | Complete |
Build Performance | Try to at least maintain the current performance and improve if possible. | M1 improved performance. |
Package Update | 50% of the target | 90% |
Upstream Commits | Have upstream status updated on 100% of patches (so that we can have a status update) | Complete (a little below the target, will do better) |
Marketing Deliverables | None | N/A |
Publication | Yocto 1.2, Milestone 1 release is announced | Complete |
Milestone 2
Release Criteria | Milestone 2 Target | Milestone 2 Status |
Functional Completion | All P1 features are completed. | See https://wiki.yoctoproject.org/wiki/Yocto_1.2_Schedule for details. |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core and meta-intel BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. High issues have been fixed. | [2] - new bugs for 1.2. HIGH priority bugs - high bugs for 1.2 See trend chart at https://wiki.yoctoproject.org/wiki/Yocto_Bug_Trend. |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report |
Distros Tested | Fedora, Ubuntu, Opensuse current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report |
Documentation | None | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | about 70% of the target | |
Upstream Commits | Have upstream status updated on 100% of patches (so that we can have a status update) | |
Marketing Deliverables | None | N/A |
Publication | Yocto 1.2, Milestone 1 release is announced |