Yocto Project Weekly Status August 27, 2019

Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Anuj
  • SWAT team rotation: Anuj -> Armin on Aug. 30, 2019
  • SWAT team rotation: Armin -> Paul on Sept. 6, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • We’re now in feature freeze for 3.0 and working on bug fixing for final release
  • There are the following planned features which are still under consideration for 3.0:
    • Systemd vs. sysvinit defaults (maybe for the poky alternative configuration tests)
    • Removal of LSB and poky-lsb and replacement with alt config testing
    • Final configuration of hash equivalency
  • The sstate hash equivalency continues to have challenges:
    • we need to rework the client/server communication to scale to the autobuilder
    • there are some bugs in the code the autobuilder continues to expose
    • we have cases where its not 100% clear what the correct behaviour should be
    • test cases are proving to be problematic to write in a maintainable way
  • Patch merging has been delayed due to vacations (RP and Ross) so the final feature patches aren’t resolved yet.
  • If anyone has any status items for the proj

Planned Releases for YP 3.0 {2.8}:

  • M3 Release 6th Sept
  • M4 Cutoff 30th Sept - this will be YP 3.0.
  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
  • YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features