Yocto Project Weekly Status December 11, 2018

Current Dev Position: YP 2.7 M1
Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018

SWAT Team Rotation:

Key Status/Updates:

  • YP 2.5.2 rc1 is in QA and is 18% complete: See https://wiki.yoctoproject.org/wiki/2.5_QA_Status
  • We’re preparing for 2.7 M1 which should build this week. QA isn’t quite ready since 2.5.2 is being worked on. Most patches targeting M1 have merged at this point and apart from some QA improvement patches, M1 should be mostly ready.
  • The btibake persistdb patches related to the sstate hash equivalence code have merged. Any instability noticed in persistdb should be reported ASAP. The rest of the hash equivalency code is now mainly pending on some decisions about terminology and will merge early in M2.
  • Many of the most predominant oe-selftest bugs have now been resolved, there are a number of less frequent issues remaining and being worked upon. We’ve reached a point where builds aren’t continually throwing up new issues, many thanks to Ross in particular for fixing some gnarly problems and for WindRiver for taking on several of the remaining issues.
  • There are patches queued in thud-next and sumo-next which backport the extra json QA reporting and oe-selftest fixes. These series are larger than normal and verge on feature backport but allow us to have better quality releases despite the changes in QA resourcing. As such we therefore believe they are justified and in the project’s interest.

Planned Releases for YP 2.6:

  • YP 2.7 M1 Cutoff is Dec. 10, 2018
  • YP 2.7 M1 Release Target is Dec. 21, 2018
  • YP 2.7 M2 Cutoff is Jan. 21, 2019
  • YP 2.7 M2 Release Target is Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, 2019
  • YP 2.7 M3 Release Target is Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, 2019
  • YP 2.7 M4 Release Target is Apr. 26, 2019

Planned upcoming dot releases:

  • YP 2.5.2 (Sumo) is in QA.
  • YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
  • YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
  • YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features

Archives