Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status February 25, 2020 ==
== Yocto Project Weekly Status March 3, 2020 ==
Current Dev Position: YP 3.1 M3  - At Feature Freeze <br/>
Current Dev Position: YP 3.1 M3  - At Feature Freeze <br/>
Next Deadline: YP 3.1 M3 build date 2/24/2020<br/>
Next Deadline: YP 3.1 M3 build date 2/24/2020<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Feb. 27th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Mar. 5th at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting Tuesday  Mar. 3rd at 8am  PDT (https://zoom.us/j/990892712)
*Monthly Project Meeting Tuesday  Mar. 3rd at 8am  PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Feb. 25th at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Mar. 10th at 8am PDT (https://zoom.us/j/990892712)
*Twitch - See http://www.twitch.tv/letoatreidesthe2nd
*Twitch - See http://www.twitch.tv/letoatreidesthe2nd


Line 27: Line 27:


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 2.7.3 built and in QA
*YP 2.7.3 release date 2/21/2020
*YP 3.0.2 release soon
*YP 3.0.3 build date  5/4/2020
*YP 3.0.3 build date  5/4/2020
*YP 3.0.3 release date 5/15/2020
*YP 3.0.3 release date 5/15/2020
Line 36: Line 33:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2665 (last week 2710) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2720 (last week 2665) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1356 (last week 1360)
**Total patches found: 1346 (last week 1356)
**Patches in the Pending State: 543 (40%) [last week 546 (40%)]
**Patches in the Pending State: 539 (40%) [last week 543 (40%)]


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Revision as of 15:44, 3 March 2020

Yocto Project Weekly Status March 3, 2020

Current Dev Position: YP 3.1 M3 - At Feature Freeze
Next Deadline: YP 3.1 M3 build date 2/24/2020

Next Team Meetings:

Key Status/Updates:

  • YP 2.7.3 rc1 is in QA with the report due next week.
  • YP 3.0.2 rc2 was rebuilt to remove a broken bash CVE patch, rc3 had automated QA only and is now due for release.
  • We are now at the date for M3 which is feature freeze. We are not yet in a position where we can build M3 as there are a number of open high blocking bugs but patches will need to start tapering down to bug fix only. More invasive or unplanned features will no longer be accepted.
  • We have a serious issue with hashequiv but a patch in progress for that. There is also a usability issue raised with hashequiv and this can only realistically be fixed in M4, it means changing the UI message handling within bitbake.
  • We continue to see automated test failures with master, most are long standing issues which we’re struggling to resolve. A minority now have had their causes narrowed down or are now reproducible at will which should help but there is concern about the others.
  • Some recent changes like psplash systemd support have introduced a race causing intermittent build failures. We had thought those resolved but they reappeared after merging.
  • Alex Kanavin has quietly but very effectively been fixing ptest failures and we now have only a very small number of non-toolchain tests failing, thanks Alex!
  • We’re collecting a list of companies, products and projects which use the Yocto Project on the wiki: https://wiki.yoctoproject.org/wiki/Project_Users Please add any you know are missing (or email Richard/Stephen who can add).
  • The triage team is worried about attendance at triage meetings and the project is finding it hard to find people to help fix bugs. If anyone is willing to work on bugs, assistance would be greatly appreciated.

Proposed YP 3.1 Milestone Dates

  • YP 3.1 M3 build date 2/24/2020
  • YP 3.1 M3 release date 3/6/2020
  • YP 3.1 M4 build date 3/30/2020
  • YP 3.1 M4 release date 4/24/2020

Planned upcoming dot releases:

  • YP 3.0.3 build date 5/4/2020
  • YP 3.0.3 release date 5/15/2020
  • YP 2.7.4 build date 5/18/2020
  • YP 2.7.4 release date 5/29/2020

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives