Yocto Project Weekly Status March 17, 2020
Current Dev Position: YP 3.1 M3 - At Feature Freeze, build pending
Next Deadline: YP 3.1 M3 is in QA
Next Team Meetings:
- Bug Triage meeting Thursday Mar. 12th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Apr. 7th at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Mar. 10th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - See http://www.twitch.tv/letoatreidesthe2nd
Key Status/Updates:
- M3 has now been built and is in QA. We are therefore feature frozen.
- YP 3.1 has been announced as an LTS release: https://www.yoctoproject.org/yocto-project-long-term-support-announced/
- There were logging changes merged to better handle hashequiv and usability concerns, thanks Joshua
- We have seen a welcome rise in green builds recently although several key intermittent failures have not been addressed. It is crucial for an LTS release we do resolve these.
- Recipe upgrades are now unlikely to be merged into 3.1 as we focus on stabilizing and bug fixing for the final release
Proposed YP 3.1 Milestone Dates
- YP 3.1 M3 is in QA
- YP 3.1 M3 release date 3/6/2020
- YP 3.1 M4 build date 3/30/2020
- YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
- YP 3.0.3 build date 5/4/2020
- YP 3.0.3 release date 5/15/2020
- YP 2.7.4 build date 5/18/2020
- YP 2.7.4 release date 5/29/2020
Tracking Metrics:
- WDD 2703 (last week 2720) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1354 (last week 1346)
- Patches in the Pending State: 541 (40%) [last week 539 (40%)]