Yocto Project Weekly Status March 10, 2020
Current Dev Position: YP 3.1 M3 - At Feature Freeze, build pending
Next Deadline: YP 3.1 M3 build date 2/24/2020
Next Team Meetings:
- Bug Triage meeting Thursday Mar. 12th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Apr. 7th at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Mar. 10th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - See http://www.twitch.tv/letoatreidesthe2nd
Key Status/Updates:
- YP 3.1 has been announced as an LTS release: https://www.yoctoproject.org/yocto-project-long-term-support-announced/
- We are now past M3 feature freeze. The blocking issues continue to reduce, thanks to everyone who has contributed fixes. The remaining issues are:
- continued minor bugs with buildtools tarball integration
- coreutils ptest blocked on reproducibility issues with gcc-plugins
- SystemExit() intermittent selftest failure
- pseudo sysroot high priority bug
- There are significant changes proposed to bitbake’s logging structure to address concerns raised by hashequiv changes. These are currently in testing and are likely to become part of M3 given the timing, wider review is welcome.
- Recipe upgrades are now unlikely to be merged into 3.1 as we focus on stabilizing and bug fixing for the release
- Autobuilder build results continue to be a concern as we’re not getting green builds very often due to multiple varied issues.
Proposed YP 3.1 Milestone Dates
- YP 3.1 M3 build date 2/24/2020
- YP 3.1 M3 release date 3/6/2020
- YP 3.1 M4 build date 3/30/2020
- YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
- YP 3.0.3 build date 5/4/2020
- YP 3.0.3 release date 5/15/2020
- YP 2.7.4 build date 5/18/2020
- YP 2.7.4 release date 5/29/2020
Tracking Metrics:
- WDD 2703 (last week 2720) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1354 (last week 1346)
- Patches in the Pending State: 541 (40%) [last week 539 (40%)]