Yocto Project Weekly Status November 26, 2019
Current Dev Position: YP 3.1 M1
Next Deadline: YP 3.1 M1 build Dec. 2, 2019
Next Team Meetings:
- Bug Triage meeting Thursday Dec. 5th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Dec. 3rd at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Nov. 26th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is Tuesday Dec. 10th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- YP 2.7.2 should be released imminently.
- The reproducibility issues from last week have been addressed and we are hoping to enable this by default soon, thanks to everyone who helped fix issues.
- The news for hash equivalence is not so promising. Whilst a number of bugs were fixed, we’ve found a major problem which explains some of the failures we’ve seen and are currently working out how we may be able to resolve that issue.
- Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them.
- The focus on hash equivalence and reproducibility has slowed patch merging in other areas. Patch testing has been problematic as there are a lot of regressions being found in submitted patches which also slows down the whole merging process.
- The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the next couple of weeks.
- We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
- Due to the number of key fixes being found we have delayed YP 3.0.1 being built slightly whilst we merge those fixes, it should build in the next few days.
- If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.
Proposed YP 3.1 Milestone Dates
- YP 3.1 M1 Proposed build date 12/2/2019
- YP 3.1 M1 Proposed release date 12/13/2019
- YP 3.1 M2 Proposed build date 1/20/2020
- YP 3.1 M2 Proposed release date 1/31/2020
- YP 3.1 M3 Proposed build date 2/24/2020
- YP 3.1 M3 Proposed release date 3/6/2020
- YP 3.1 M4 Proposed build date 3/30/2020
- YP 3.1 M4 Proposed release date 4/24/2020
Planned upcoming dot releases:
- YP 2.7.2 Should release this week.
- YP 3.0.1 Proposed build date 11/25/2019
- YP 3.0.1 Proposed release date 12/06/2019
- YP 2.7.3 Proposed build date 2/10/20
- YP 2.7.3 Proposed release date 2/21/20
- YP 3.0.2 Proposed build date 2/3/20
- YP 3.0.2 Proposed release date 2/14/20
Tracking Metrics:
- WDD 2578 (last week 2533) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1450 (last week 1461)
- Patches in the Pending State: 579 (40%) [last week 579 (40%)]