Yocto Project Weekly Status February 26, 2019
Current Dev Position: YP 2.7 M3
Next Deadline: YP 2.7 M3 Cutoff was Mar. 5, 2019
SWAT Team Rotation:
- SWAT lead is currently: Chen
- SWAT team rotation: Chen -> Anuj on Mar. 8, 2019
- SWAT team rotation: Anuj -> Armin on Mar. 15, 2019
- https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Key Status/Updates:
- YP 2.7 M2 rc2 is being released today Mar. 5, 2019.
- YP 2.7 M3 has not yet been built but progress has been made in resolving several issues:
- bug 13178 “X server and matchbox desktop don't start up properly on beaglebone” was fixed
- multiconfig bugs have been fixed and a test case added
- qemu virgl code and selftests have been added (not enabled as default)
- qemu native build was split into user and system components
- lttng-tools ptest timeout fixed
- systemd version upgrade
- ltp recipe version upgrade
- perl ptest regressions fixed
- The list of remaining potential items for M3 is:
- 5.0 linux kernel (and libc headers) (Bruce)
- qemuarm to v7 changes (Jon)
- Aarch64 build host support finalization (Jon)
- Busybox ‘full’ utility replacement (Tom)
- YP 2.5.3 is nearly ready for building however the autobuilder-helper changes need to be resolved for the stable branches, as do the resulttool changes in master to move to the new QA process.
Planned Releases for YP 2.7:
- YP 2.7 M2 Released Mar. 5, 2019
- YP 2.7 M3 Cutoff is Feb. 25, 2019
- YP 2.7 M3 Release Target is Mar. 8, 2019
- YP 2.7 M4 Cutoff is Apr. 1, 2019
- YP 2.7 M4 Release Target is Apr. 26, 2019
Planned upcoming dot releases:
- YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
- YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
- YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
Tracking Metrics:
- WDD 2436 (last week 2415) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1502 (last week 1516)
- Patches in the Pending State: 658 (44%) [last week 660 (44%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features