Yocto Project Weekly Status December 4, 2018

Current Dev Position: YP 2.7 M1
Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018

SWAT Team Rotation:

Key Status/Updates:

  • YP 2.4.4 was released
  • Some progress has been made on fixing the oe-selftest stability issues reported last week. As an idea of scale there have been over 20 different issues found so far but others continue to appear.
  • Patches are merging to master but at a reduced rate due to the selftest stability problem.
  • Please be aware 2.7 M1 is due to be built on Monday.

Planned Releases for YP 2.6:

  • YP 2.7 M1 Cutoff is Dec. 10, 2018
  • YP 2.7 M1 Release Target is Dec. 21, 2018
  • YP 2.7 M2 Cutoff is Jan. 21, 2019
  • YP 2.7 M2 Release Target is Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, 2019
  • YP 2.7 M3 Release Target is Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, 2019
  • YP 2.7 M4 Release Target is Apr. 26, 2019

Planned upcoming dot releases:

  • YP 2.5.2 (Sumo) will be built soon.
  • YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
  • YP 2.5.3 (Sumo) will be targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be targeted after YP 2.5.3 is done.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features

Archives