Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status March 31, 2020 ==
== Yocto Project Weekly Status April 7, 2020 ==
Current Dev Position: YP 3.1 M4 - Stabilization- Final RC builds <br/>
Current Dev Position: YP 3.1 M4 - RC built and in QA <br/>
Next Deadline: YP 3.1 M4 build date 3/30/2020<br/>
Next Deadline: YP 3.1 release date 4/24/2020<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Apr. 2nd at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Apr. 9th at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting Tuesday  Apr. 7th at 8am  PDT (https://zoom.us/j/990892712)
*Monthly Project Meeting Tuesday  Apr. 7th at 8am  PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Mar. 31st at 8am PDT (https://zoom.us/j/990892712)
*Weekly Engineering Sync Tuesday Apr. 14th at 8am PDT (https://zoom.us/j/990892712)
*Twitch - See http://www.twitch.tv/letoatreidesthe2nd
*Twitch - See http://www.twitch.tv/letoatreidesthe2nd


Line 17: Line 17:


'''Proposed YP 3.1 Milestone Dates'''<br/>
'''Proposed YP 3.1 Milestone Dates'''<br/>
*YP 3.1 M4 build date  3/30/2020
*YP 3.1 M4 built and is in QA
*YP 3.1 M4 release date  4/24/2020
*YP 3.1 M4 release date  4/24/2020


Line 27: Line 27:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2663 (last week 2681) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2605 (last week 2663) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1354 (last week 1350)
**Total patches found: 1363 (last week 1354)
**Patches in the Pending State: 536 (40%) [last week 535 (40%)]
**Patches in the Pending State: 538 (40%) [last week 536 (40%)]


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Revision as of 14:28, 7 April 2020

Yocto Project Weekly Status April 7, 2020

Current Dev Position: YP 3.1 M4 - RC built and in QA
Next Deadline: YP 3.1 release date 4/24/2020

Next Team Meetings:

Key Status/Updates:

  • 3.1 M3 was released
  • The 3.1 rc1 build has not happened yet, the final remaining patches are being worked upon and will be built when the remaining high issues are resolved.
  • YP 3.1 has been announced as an LTS release: https://www.yoctoproject.org/yocto-project-long-term-support-announced/
  • The focus is now on stabilizing and bug fixing for the final release
  • We continue to have concerns about the number of autobuilder intermittent failures, particularly with this being an LTS release however the remaining issues are proving hard to reproduce and track down.

Proposed YP 3.1 Milestone Dates

  • YP 3.1 M4 built and is in QA
  • YP 3.1 M4 release date 4/24/2020

Planned upcoming dot releases:

  • YP 3.0.3 build date 5/4/2020
  • YP 3.0.3 release date 5/15/2020
  • YP 2.7.4 build date 5/18/2020
  • YP 2.7.4 release date 5/29/2020

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives