== Yocto Project Weekly Status February 18, 2020 == | == Yocto Project Weekly Status February 18, 2020 == | ||
Current Dev Position: YP 3.1 M3 <br/> | Current Dev Position: YP 3.1 M3 - At Feature Freeze <br/> | ||
Next Deadline: YP 3.1 M3 build date 2/24/2020<br/> | Next Deadline: YP 3.1 M3 build date 2/24/2020<br/> | ||
'''Next Team Meetings:'''<br/> | '''Next Team Meetings:'''<br/> | ||
*Bug Triage meeting Thursday Feb. | *Bug Triage meeting Thursday Feb. 27th at 7:30am PDT (https://zoom.us/j/454367603) | ||
*Monthly Project Meeting Tuesday Mar. 3rd at 8am PDT (https://zoom.us/j/990892712) | *Monthly Project Meeting Tuesday Mar. 3rd at 8am PDT (https://zoom.us/j/990892712) | ||
*Weekly Engineering Sync Tuesday Feb. | *Weekly Engineering Sync Tuesday Feb. 25th at 8am PDT (https://zoom.us/j/990892712) | ||
*Twitch - | *Twitch - See http://www.twitch.tv/letoatreidesthe2nd | ||
'''Key Status/Updates:'''<br/> | '''Key Status/Updates:'''<br/> | ||
Line 29: | Line 29: | ||
*YP 2.7.3 built and in QA | *YP 2.7.3 built and in QA | ||
*YP 2.7.3 release date 2/21/2020 | *YP 2.7.3 release date 2/21/2020 | ||
*YP 3.0.2 build date | *YP 3.0.2 release soon | ||
*YP 3.0.2 release date | *YP 3.0.3 build date 5/4/2020 | ||
*YP 3.0.3 release date 5/15/2020 | |||
*YP 2.7.4 build date 5/18/2020 | |||
*YP 2.7.4 release date 5/29/2020 | |||
'''Tracking Metrics:'''<br/> | '''Tracking Metrics:'''<br/> | ||
*WDD | *WDD 2665 (last week 2710) (https://wiki.yoctoproject.org/charts/combo.html) | ||
*Poky Patch Metrics | *Poky Patch Metrics | ||
**Total patches found: | **Total patches found: 1356 (last week 1360) | ||
**Patches in the Pending State: | **Patches in the Pending State: 543 (40%) [last week 546 (40%)] | ||
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> | '''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> |
Revision as of 15:49, 25 February 2020
Yocto Project Weekly Status February 18, 2020
Current Dev Position: YP 3.1 M3 - At Feature Freeze
Next Deadline: YP 3.1 M3 build date 2/24/2020
Next Team Meetings:
- Bug Triage meeting Thursday Feb. 27th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Mar. 3rd at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Feb. 25th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - See http://www.twitch.tv/letoatreidesthe2nd
Key Status/Updates:
- The project recently updated its git hosting infrastructure and there were some issues encountered with the cgit http/https repository sharing. Those issues should now be resolved, apologies if they caused issues for anyone. The git:// protocol sharing was unaffected.
- YP 3.0.2 rc2 is in QA with the report due soon.
- We continue to see a small number of reproducibility issues with master which need resolving for green builds (in particular gstreamer and perl).
- A significant memory usage issue was identified during bitbake parsing where memory usage would grow in each parser thread linearly per number of recipes parsed. This would therefore particularly affect large numbers of layers, multilibs and multiconfig. The fix has merged into bitbake along with the corresponding zeus and warrior branches. For one test case it reduced peak memory usage during parsing for 5 multiconfigs from 20GB to 2GB.
- Warrior patches for 2.7.3 are out for review.
- With the git infrastructure issue updated, we now have centos8 workers added to the autobuilder.
- We are making various queued changes to the autobuilder configuration to fix bugs, improve efficiency and test coverage but this may result in some test result instability as we test and resolve issues.
- We’re collecting a list of companies, products and projects which use the Yocto Project on the wiki: https://wiki.yoctoproject.org/wiki/Project_Users Please add any you know are missing (or email Richard/Stephen who can add).
- The triage team is worried about attendance at triage meetings and the project is finding it hard to find people to help fix bugs. If anyone is willing to work on bugs, assistance would be greatly appreciated.
Proposed YP 3.1 Milestone Dates
- YP 3.1 M3 build date 2/24/2020
- YP 3.1 M3 release date 3/6/2020
- YP 3.1 M4 build date 3/30/2020
- YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
- YP 2.7.3 built and in QA
- YP 2.7.3 release date 2/21/2020
- YP 3.0.2 release soon
- YP 3.0.3 build date 5/4/2020
- YP 3.0.3 release date 5/15/2020
- YP 2.7.4 build date 5/18/2020
- YP 2.7.4 release date 5/29/2020
Tracking Metrics:
- WDD 2665 (last week 2710) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1356 (last week 1360)
- Patches in the Pending State: 543 (40%) [last week 546 (40%)]
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: