Weekly Status: Difference between revisions
From Yocto Project
Jump to navigationJump to search
Line 1: | Line 1: | ||
== Yocto Project Weekly Status | == Yocto Project Weekly Status December 3, 2019 == | ||
Current Dev Position: YP 3.1 M1 <br/> | Current Dev Position: YP 3.1 M1 <br/> | ||
Next Deadline: YP 3.1 M1 build Dec. 2, 2019<br/> | Next Deadline: YP 3.1 M1 build Dec. 2, 2019<br/> |
Revision as of 15:48, 3 December 2019
Yocto Project Weekly Status December 3, 2019
Current Dev Position: YP 3.1 M1
Next Deadline: YP 3.1 M1 build Dec. 2, 2019
Next Team Meetings:
- Bug Triage meeting Thursday Dec. 5th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Dec. 3rd at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is Tuesday Dec. 10th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- YP 3.0.1 is out of QA with good test results so should be released soon.
- We have set a deadline of Monday 9th December for removing python2 support from OE-Core, a separate email was sent out about this. The patches to do this are in master-next and they remove python and python2 from HOSTTOOLS.
- Reproducible builds are now enabled by default in poky, we should also consider this for the default in OE-Core.
- Hash equivalence continues to undergo testing and further work.
- We’re likely to build M1 after the python 2 removal is merged next week, also giving time for the hash equivalence work to move forward further.
- Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them.
- The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the coming weeks.
- We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
- If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard and Stephen.
Proposed YP 3.1 Milestone Dates
- YP 3.1 M1 build date 12/2/2019
- YP 3.1 M1 release date 12/13/2019
- YP 3.1 M2 build date 1/20/2020
- YP 3.1 M2 release date 1/31/2020
- YP 3.1 M3 build date 2/24/2020
- YP 3.1 M3 release date 3/6/2020
- YP 3.1 M4 build date 3/30/2020
- YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
- YP 3.0.1 is out of QA and should be released soon.
- YP 2.7.3 build date 2/10/20
- YP 2.7.3 release date 2/21/20
- YP 3.0.2 build date 2/3/20
- YP 3.0.2 release date 2/14/20
Tracking Metrics:
- WDD 2620 (last week 2578) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1444 (last week 1450)
- Patches in the Pending State: 571 (40%) [last week 579 (40%)]