== Yocto Project Weekly Status December | == Yocto Project Weekly Status December 10, 2019 == | ||
Current Dev Position: YP 3.1 M1 <br/> | Current Dev Position: YP 3.1 M1 <br/> | ||
Next Deadline: YP 3.1 M1 build Dec. 2, 2019<br/> | Next Deadline: YP 3.1 M1 build Dec. 2, 2019<br/> | ||
'''Next Team Meetings:'''<br/> | '''Next Team Meetings:'''<br/> | ||
*Bug Triage meeting Thursday Dec. | *Bug Triage meeting Thursday Dec. 12th at 7:30am PDT (https://zoom.us/j/454367603) | ||
*Monthly Project Meeting Tuesday | *Monthly Project Meeting Tuesday Jan. 7th at 8am PDT (https://zoom.us/j/990892712) | ||
*Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (https://zoom.us/j/990892712) | *Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (https://zoom.us/j/990892712) | ||
*Twitch - Next event is Tuesday Dec. | *Twitch - Next event is Tuesday Dec. 17th at 8am PDT (https://www.twitch.tv/yocto_project) | ||
'''Key Status/Updates:'''<br/> | '''Key Status/Updates:'''<br/> | ||
*YP 3.0.1 | *YP 3.0.1 was released. | ||
* | *Python 2.x has been removed from HOSTTOOLS so OE-Core is python2 use free. | ||
* | *Hash Equivalency has been enabled by default for poky using a local server. | ||
* | *YP 3.1 M1 was due to be built but issues have been encountered in the release builds, both with previously unseen hash equivalence issue and a ptest performance regression on the autobuilders. Both issues are being worked on but are further delaying a successful M1 build. | ||
*Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them. | *Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them. | ||
*Patch review and testing has run into new issues with a number of regressions from upgrades causing instability. Most of these were isolated pre-merge but not all. | |||
*The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the coming weeks. | *The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the coming weeks. | ||
*We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing | *We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing | ||
Line 31: | Line 31: | ||
'''Planned upcoming dot releases:'''<br/> | '''Planned upcoming dot releases:'''<br/> | ||
*YP 3.0.1 is | *YP 3.0.1 is released. | ||
*YP 2.7.3 build date 2/10/20 | *YP 2.7.3 build date 2/10/20 | ||
*YP 2.7.3 release date 2/21/20 | *YP 2.7.3 release date 2/21/20 | ||
Line 38: | Line 38: | ||
'''Tracking Metrics:'''<br/> | '''Tracking Metrics:'''<br/> | ||
*WDD | *WDD 2698 (last week 2620) (https://wiki.yoctoproject.org/charts/combo.html) | ||
*Poky Patch Metrics | *Poky Patch Metrics | ||
**Total patches found: | **Total patches found: 1410 (last week 1444) | ||
**Patches in the Pending State: | **Patches in the Pending State: 564 (40%) [last week 571 (40%)] | ||
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> | '''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> |
Revision as of 15:37, 10 December 2019
Yocto Project Weekly Status December 10, 2019
Current Dev Position: YP 3.1 M1
Next Deadline: YP 3.1 M1 build Dec. 2, 2019
Next Team Meetings:
- Bug Triage meeting Thursday Dec. 12th at 7:30am PDT (https://zoom.us/j/454367603)
- Monthly Project Meeting Tuesday Jan. 7th at 8am PDT (https://zoom.us/j/990892712)
- Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (https://zoom.us/j/990892712)
- Twitch - Next event is Tuesday Dec. 17th at 8am PDT (https://www.twitch.tv/yocto_project)
Key Status/Updates:
- YP 3.0.1 was released.
- Python 2.x has been removed from HOSTTOOLS so OE-Core is python2 use free.
- Hash Equivalency has been enabled by default for poky using a local server.
- YP 3.1 M1 was due to be built but issues have been encountered in the release builds, both with previously unseen hash equivalence issue and a ptest performance regression on the autobuilders. Both issues are being worked on but are further delaying a successful M1 build.
- Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them.
- Patch review and testing has run into new issues with a number of regressions from upgrades causing instability. Most of these were isolated pre-merge but not all.
- The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the coming weeks.
- We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
- If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard and Stephen.
Proposed YP 3.1 Milestone Dates
- YP 3.1 M1 build date 12/2/2019
- YP 3.1 M1 release date 12/13/2019
- YP 3.1 M2 build date 1/20/2020
- YP 3.1 M2 release date 1/31/2020
- YP 3.1 M3 build date 2/24/2020
- YP 3.1 M3 release date 3/6/2020
- YP 3.1 M4 build date 3/30/2020
- YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
- YP 3.0.1 is released.
- YP 2.7.3 build date 2/10/20
- YP 2.7.3 release date 2/21/20
- YP 3.0.2 build date 2/3/20
- YP 3.0.2 release date 2/14/20
Tracking Metrics:
- WDD 2698 (last week 2620) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1410 (last week 1444)
- Patches in the Pending State: 564 (40%) [last week 571 (40%)]
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC