== Yocto Project Weekly Status January 22, 2019 ==
== Yocto Project Weekly Status January 29, 2019 ==
Current Dev Position: YP 2.7 M2 <br/>
Current Dev Position: YP 2.7 M3 <br/>
Next Deadline: YP 2.7 M2 Cutoff is Jan. 21, 2019<br/>
Next Deadline: YP 2.7 M3 Cutoff is Feb. 25, 2019<br/>


'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>


*SWAT lead is currently: Chen
*SWAT lead is currently: Armin
SWAT team rotation: Chen -> Armin on Jan. 25, 2019
SWAT team rotation: Armin -> Anuj on Feb. 1, 2019
*SWAT team rotation: Armin -> Anuj on Jan. 18, 2019
*SWAT team rotation: Anuj -> Paul on Feb. 8, 2019
**https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
**https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Line 20: Line 20:


'''Planned Releases for YP 2.7:'''<br/>
'''Planned Releases for YP 2.7:'''<br/>
*YP 2.7 M2 Cutoff is Jan. 21, 2019
*YP 2.7 M2 is built and in QA.
*YP 2.7 M2 Release Target is Feb. 1, 2019
*YP 2.7 M2 Release Target is Feb. 1, 2019
*YP 2.7 M3 Cutoff is Feb. 25, 2019
*YP 2.7 M3 Cutoff is Feb. 25, 2019
Line 28: Line 28:


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 2.6.1 (Thud) will is out of QA.
*YP 2.6.1 (Thud) will release shortly.
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
Line 34: Line 34:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2421 (last week 2391) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2393 (last week 2421) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1572 (last week 1565)
**Total patches found: 1583 (last week 1572)
**Patches in the Pending State: 677 (43%) [last week 667 (43%)]
**Patches in the Pending State: 677 (43%) [last week 677 (43%)]


'''Key Status Links for YP:'''<br/>
'''Key Status Links for YP:'''<br/>

Revision as of 15:56, 29 January 2019

Yocto Project Weekly Status January 29, 2019

Current Dev Position: YP 2.7 M3
Next Deadline: YP 2.7 M3 Cutoff is Feb. 25, 2019

SWAT Team Rotation:

  • SWAT lead is currently: Armin

SWAT team rotation: Armin -> Anuj on Feb. 1, 2019

Key Status/Updates:

  • YP 2.6.1 is out of QA and the QA results are being reviewed. See: https://wiki.yoctoproject.org/wiki/WW02_-_2019-01-09_-_Full_Test_Cycle_2.6.1_RC1
  • We have preliminary patches for the qemuarm migration to an armv7 machine. These haven’t passed testing and will need some improvements, particularly in the area of graphics support so will be deferred to M3 but it is great to see progress being made.
  • The qemu virtgl patchset is also making great progress in review/development but will also be deferred to M3.
  • We are now running the build performance tests as part of our standard autobuilder which is a further step towards streamlining our testing and release process. We are having some problems with the graphs that are generated in the emails. If anyone has experience or interest in helping with this (google charts in emails) we’d love to hear from you!
  • The perl changes which landed last week seem to have mostly been ok, there have been some race issues and we’re grateful to Alex and the perl-cross upstream for their fast turnaround on those.
  • Further fixes for the gitsm fetcher landed but there are still reports of issues. We continue to try and find ways to expand our test case matrix so we can fix the issues *and* ensure we don’t regress.
  • The latest round of updates from the AUH were sent out. Some have responded to this and sent in upgrades, many have not. If you are listed as a maintainer, please help us keep recipes up to date!

Planned Releases for YP 2.7:

  • YP 2.7 M2 is built and in QA.
  • YP 2.7 M2 Release Target is Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, 2019
  • YP 2.7 M3 Release Target is Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, 2019
  • YP 2.7 M4 Release Target is Apr. 26, 2019

Planned upcoming dot releases:

  • YP 2.6.1 (Thud) will release shortly.
  • YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
  • YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features