Yocto Project Weekly Status December 18, 2018

Current Dev Position: YP 2.7 M1 is in QA
Next Deadline: YP 2.7 M1 Release Target is Dec. 21, 2018

SWAT Team Rotation:

Key Status/Updates:

  • The next status report will be published on 2019/1/2 as we expect things to slow down over the holiday season in many locations.
  • YP 2.5.2 rc1 is out of QA and should release today or tomorrow.
  • YP 2.7 M1 is in QA.
  • The distrodata bbclass in OE-Core is being removed since the tinfoil API provides a much better way to handle this kind of issue/data.
  • We discovered potential hash collision issues with some of bitbake’s caching of objects so we are likely going to change to use sha256 everywhere including for sstate objects.
  • There are occasional issues continuing in oe-selftest which we’re struggling to get to the bottom of unfortunately.
  • There are some patches like the perl upgrade which are blocked on merging due to limited help in fixing fallout from them in layers like meta-openembedded. Khem in particular does a great job but we can’t rely on him alone.

Planned Releases for YP 2.6:

  • YP 2.7 M1 Cutoff is in QA.
  • YP 2.7 M1 Release Target is Dec. 21, 2018
  • YP 2.7 M2 Cutoff is Jan. 21, 2019
  • YP 2.7 M2 Release Target is Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, 2019
  • YP 2.7 M3 Release Target is Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, 2019
  • YP 2.7 M4 Release Target is Apr. 26, 2019

Planned upcoming dot releases:

  • YP 2.5.2 (Sumo) is out of QA and should release shortly.
  • YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
  • YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
  • YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features

Archives