== Yocto Project Weekly Status December 11, 2018 ==
== Yocto Project Weekly Status December 18, 2018 ==
Current Dev Position: YP 2.7 M1 <br/>
Current Dev Position: YP 2.7 M1 is in QA <br/>
Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018<br/>
Next Deadline: YP 2.7 M1 Release Target is Dec. 21, 2018<br/>


'''SWAT Team Rotation:'''<br/>
'''SWAT Team Rotation:'''<br/>


*SWAT lead is currently: Chen
*SWAT lead is currently: Armin
*SWAT team rotation: Chen -> Armin on Nov. 14, 2018
*SWAT team rotation: Armin -> Anuj on Dec. 21, 2018
*SWAT team rotation: Armin -> Anuj on Dec. 21, 2018
*SWAT team rotation: Anuj -> Paul on Nov. 28, 2018
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 2.5.2 rc1 is in QA and is 18% complete:  See https://wiki.yoctoproject.org/wiki/2.5_QA_Status
*The next status report will be published on 2019/1/2 as we expect things to slow down over the holiday season in many locations.
*We’re preparing for 2.7 M1 which should build this week. QA isn’t quite ready since 2.5.2 is being worked on. Most patches targeting M1 have merged at this point and apart from some QA improvement patches, M1 should be mostly ready.
*YP 2.5.2 rc1 is out of QA and should release today or tomorrow.
*The btibake persistdb patches related to the sstate hash equivalence code have merged. Any instability noticed in persistdb should be reported ASAP. The rest of the hash equivalency code is now mainly pending on some decisions about terminology and will merge early in M2.
*YP 2.7 M1 is in QA.
*Many of the most predominant oe-selftest bugs have now been resolved, there are a number of less frequent issues remaining and being worked upon. We’ve reached a point where builds aren’t continually throwing up new issues, many thanks to Ross in particular for fixing some gnarly problems and for WindRiver for taking on several of the remaining issues.
*The distrodata bbclass in OE-Core is being removed since the tinfoil API provides a much better way to handle this kind of issue/data.
*There are patches queued in thud-next and sumo-next which backport the extra json QA reporting and oe-selftest fixes. These series are larger than normal and verge on feature backport but allow us to have better quality releases despite the changes in QA resourcing. As such we therefore believe they are justified and in the project’s interest.
*We discovered potential hash collision issues with some of bitbake’s caching of objects so we are likely going to change to use sha256 everywhere including for sstate objects.
*There are occasional issues continuing in oe-selftest which we’re struggling to get to the bottom of unfortunately.
*There are some patches like the perl upgrade which are blocked on merging due to limited help in fixing fallout from them in layers like meta-openembedded. Khem in particular does a great job but we can’t rely on him alone.


'''Planned Releases for YP 2.6:'''<br/>
'''Planned Releases for YP 2.6:'''<br/>
*YP 2.7 M1 Cutoff is Dec. 10, 2018
*YP 2.7 M1 Cutoff is in QA.
*YP 2.7 M1 Release Target is Dec. 21, 2018
*YP 2.7 M1 Release Target is Dec. 21, 2018
*YP 2.7 M2 Cutoff is Jan. 21, 2019
*YP 2.7 M2 Cutoff is Jan. 21, 2019
Line 28: Line 30:


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 2.5.2 (Sumo) is in QA.
*YP 2.5.2 (Sumo) is out of QA and should release shortly.
*YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
*YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
Line 35: Line 37:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2295 (last week 2425) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2332 (last week 2295) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1678 (last week 1675)
**Total patches found: 1629 (last week 1678)
**Patches in the Pending State: 740 (44%) [last week 736 (44%)]
**Patches in the Pending State: 720 (44%) [last week 740 (44%)]


'''Key Status Links for YP:'''<br/>
'''Key Status Links for YP:'''<br/>

Revision as of 16:23, 18 December 2018

Yocto Project Weekly Status December 18, 2018

Current Dev Position: YP 2.7 M1 is in QA
Next Deadline: YP 2.7 M1 Release Target is Dec. 21, 2018

SWAT Team Rotation:

Key Status/Updates:

  • The next status report will be published on 2019/1/2 as we expect things to slow down over the holiday season in many locations.
  • YP 2.5.2 rc1 is out of QA and should release today or tomorrow.
  • YP 2.7 M1 is in QA.
  • The distrodata bbclass in OE-Core is being removed since the tinfoil API provides a much better way to handle this kind of issue/data.
  • We discovered potential hash collision issues with some of bitbake’s caching of objects so we are likely going to change to use sha256 everywhere including for sstate objects.
  • There are occasional issues continuing in oe-selftest which we’re struggling to get to the bottom of unfortunately.
  • There are some patches like the perl upgrade which are blocked on merging due to limited help in fixing fallout from them in layers like meta-openembedded. Khem in particular does a great job but we can’t rely on him alone.

Planned Releases for YP 2.6:

  • YP 2.7 M1 Cutoff is in QA.
  • YP 2.7 M1 Release Target is Dec. 21, 2018
  • YP 2.7 M2 Cutoff is Jan. 21, 2019
  • YP 2.7 M2 Release Target is Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, 2019
  • YP 2.7 M3 Release Target is Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, 2019
  • YP 2.7 M4 Release Target is Apr. 26, 2019

Planned upcoming dot releases:

  • YP 2.5.2 (Sumo) is out of QA and should release shortly.
  • YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
  • YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
  • YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features

Archives