Weekly Status: Difference between revisions
From Yocto Project
Jump to navigationJump to search
Line 29: | Line 29: | ||
*YP 2.5.2 (Sumo) will be built soon. | *YP 2.5.2 (Sumo) will be built soon. | ||
*YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done. | *YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done. | ||
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M4 is done. | *YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done. | ||
*YP 2.6.2 (Thud) will be targeted after YP 2.5. | *YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done. | ||
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done. | |||
'''Tracking Metrics:'''<br/> | '''Tracking Metrics:'''<br/> |
Revision as of 16:13, 6 December 2018
Yocto Project Weekly Status December 4, 2018
Current Dev Position: YP 2.7 M1
Next Deadline: YP 2.7 M1 Cutoff is Dec. 10, 2018
SWAT Team Rotation:
- SWAT lead is currently: Amanda
- SWAT team rotation: Amanda -> Chen on Dec. 7, 2018
- SWAT team rotation: Chen -> Armin on Nov. 30, 2018
- https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Key Status/Updates:
- YP 2.4.4 was released
- Some progress has been made on fixing the oe-selftest stability issues reported last week. As an idea of scale there have been over 20 different issues found so far but others continue to appear.
- Patches are merging to master but at a reduced rate due to the selftest stability problem.
- Please be aware 2.7 M1 is due to be built on Monday.
Planned Releases for YP 2.6:
- YP 2.7 M1 Cutoff is Dec. 10, 2018
- YP 2.7 M1 Release Target is Dec. 21, 2018
- YP 2.7 M2 Cutoff is Jan. 21, 2019
- YP 2.7 M2 Release Target is Feb. 1, 2019
- YP 2.7 M3 Cutoff is Feb. 25, 2019
- YP 2.7 M3 Release Target is Mar. 8, 2019
- YP 2.7 M4 Cutoff is Apr. 1, 2019
- YP 2.7 M4 Release Target is Apr. 26, 2019
Planned upcoming dot releases:
- YP 2.5.2 (Sumo) will be built soon.
- YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
- YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
- YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
- YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
Tracking Metrics:
- WDD 2425 (last week 2426) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1675 (last week 1682)
- Percentage of patches in the Pending State: 736 (44%) [last week 734 (44%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features