Weekly Status: Difference between revisions
From Yocto Project
Jump to navigationJump to search
Line 1: | Line 1: | ||
== Yocto Project Weekly Status | == Yocto Project Weekly Status April 2, 2019 == | ||
Current Dev Position: YP 2.7 | Current Dev Position: YP 2.7 M4 (New feature Freeze has begun.)<br/> | ||
Next Deadline: YP 2.7 M3 Release Target was Mar. 8, 2019<br/> | Next Deadline: YP 2.7 M3 Release Target was Mar. 8, 2019<br/> | ||
'''SWAT Team Rotation:'''<br/> | '''SWAT Team Rotation:'''<br/> | ||
*SWAT lead is currently: | *SWAT lead is currently: Ross | ||
*SWAT team rotation: Ross -> Amanda on Apr. 5, 2019 | *SWAT team rotation: Ross -> Amanda on Apr. 5, 2019 | ||
*SWAT team rotation: Amanda -> Chen on Apr. 12, 2019 | |||
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | *https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team | ||
'''Next Team Meetings:'''<br/> | |||
*YP 2.8 Planning meeting Tuesday April 2nd at 8am PDT (https://zoom.us/j/990892712) or see the invite on the mailing list at: (https://lists.yoctoproject.org/pipermail/yocto/2019-April/044654.html) | |||
*Bug Triage meeting Thursday April 4th at 7:30am PDT (https://zoom.us/j/454367603) | |||
'''Key Status/Updates:'''<br/> | '''Key Status/Updates:'''<br/> |
Revision as of 15:54, 2 April 2019
Yocto Project Weekly Status April 2, 2019
Current Dev Position: YP 2.7 M4 (New feature Freeze has begun.)
Next Deadline: YP 2.7 M3 Release Target was Mar. 8, 2019
SWAT Team Rotation:
- SWAT lead is currently: Ross
- SWAT team rotation: Ross -> Amanda on Apr. 5, 2019
- SWAT team rotation: Amanda -> Chen on Apr. 12, 2019
- https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Next Team Meetings:
- YP 2.8 Planning meeting Tuesday April 2nd at 8am PDT (https://zoom.us/j/990892712) or see the invite on the mailing list at: (https://lists.yoctoproject.org/pipermail/yocto/2019-April/044654.html)
- Bug Triage meeting Thursday April 4th at 7:30am PDT (https://zoom.us/j/454367603)
Key Status/Updates:
- M3 has been built and is currently in QA
- There are a small number of upgrades which merged after M3 as it was felt better to be up to date in these cases along with various other fixes. The project is now very much in feature freeze and bug fixing working toward the final release though.
- The OpenEmbedded election for its TSC members is now in the nomination phase.
- For the stable releases, the autobuilder-helper changes have now merged and the resulttool patches are also backported on the relevant -next branches. This means we’re ready to build both 2.5.3 and 2.6.2.
Planned Releases for YP 2.7:
- YP 2.7 M3 Cutoff was Feb. 25, 2019
- YP 2.7 M3 Release Target was Mar. 8, 2019
- YP 2.7 M4 Cutoff is Apr. 1, 2019
- YP 2.7 M4 Release Target is Apr. 26, 2019
Planned upcoming dot releases:
- YP 2.5.3 (Sumo) will be targeted for build as soon as it is ready..
- YP 2.6.2 (Thud) will be targeted after YP 2.5.3 is done.
Tracking Metrics:
- WDD 2418 (last week 2432) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1538 (last week 1526)
- Patches in the Pending State: 656 (43%) [last week 656 (43%)]
Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features