Yocto Project v2.6 Status
From Yocto Project
Jump to navigationJump to search
Yocto Project 2.6 release Status - Work in progress
Project Dashboard
https://wiki.yoctoproject.org/charts/combo.html
Feature/Task Board
Overview
Scheduled | Design | Design Complete | Development | Patch Review | Testing | Done | Blocked | ||||||||||||||||||||||||||||||||||||||||||||||||
"None"
|
"None"
|
"None"
|
"None"
|
"None"
|
|
no bugzilla tickets were found
|
"None"
|
List View
Blocked
ID | Assignee | E | Whiteboard | Milestone | Status |
---|---|---|---|---|---|
0 |
Planned
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Scheduled
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Design
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Design Complete
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Development
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Patch Review
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Testing
ID | Assignee | P | E | Summary (15 tasks) ⇒ | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
7336 | Paul Eggleton | Medium | 1 | buildhistory-diff reports recipe-wide changes per-subpackage | 2.6 | RESOLVED | |
6307 | Hongxu Jia | Medium | 7 | Package grub-efi modules and scripts similar to grub-bios | 2.6 | RESOLVED | |
12689 | Anuj Mittal | High | 1 | wic should be able to use initrd value for grub | 2.6 M1 | RESOLVED | |
10744 | Richard Purdie | Medium+ | 5 | Update test case of smartpm/createrepo under meta/lib/oeqa/runtime | 2.6 M1 | RESOLVED | |
10681 | Alejandro Hernandez | Medium+ | 10 | Support inter-multi-configuration dependencies | 2.6 M2 | RESOLVED | |
12727 | Alexander Kanavin | Medium+ | Drop wireless-tools and use iw | 2.6 M2 | RESOLVED | ||
12891 | Awais | Medium+ | 5 | Allow flexible value for TOASTERDIR plus custom fixture support | 2.6 M3 | RESOLVED | |
12785 | David Reyna | Medium+ | 4 | Support Project Specific configuration for external tools (e.g. ISS, Eclipse) | 2.6 M3 | RESOLVED | |
12821 | David Reyna | Medium+ | 5 | Make Toaster conf changes compatible with command line usage | 2.6 M3 | RESOLVED | |
12822 | David Reyna | Medium+ | 5 | Support importing user changes to conf files into Toaster | 2.6 M3 | RESOLVED | |
12824 | David Reyna | Medium | 2 | Scan imported layers for content so that they are immediately available | 2.6 M3 | RESOLVED | |
12825 | David Reyna | Medium | 1 | show layer clone item in progress bar | 2.6 M3 | RESOLVED | |
8446 | Hongxu Jia | Medium | 5 | fix .pyc/.pyo buildpaths issue | 2.6 M3 | RESOLVED | |
12789 | pankaj yadav | High | qa-tools: enhance script to analyze ptest log to identify test case that passing in precious cycle but failing in current cycle | 2.6 M3 | RESOLVED | ||
12749 | Richard Purdie | Medium+ | Add ability to do "preflight" by using sstate | 2.6 M3 | RESOLVED | ||
51 |
Done
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Yocto Project v2.6 Release Criteria
Milestone 1 - Target June 22, 2018
Release Criteria | Milestone 1 Target | Milestone 1 Status |
Functional Completion | All high features are completed. | Done |
Build and Release (Yocto) | All completed features can be built with no errors. | Done |
Build and Release (BSPs) | Core BSPs can be built with no errors. | Done |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [1] Done |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | Done -
https://wiki.yoctoproject.org/wiki/WW27_-_2018-07-02_-_Full_Test_Cycle_2.6_M1_rc1 |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | Done CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | Done -
https://wiki.yoctoproject.org/wiki/WW27_-_2018-07-02_-_Full_Test_Cycle_2.6_M1_rc1 |
Build Performance | Try to at least maintain the current performance and improve if possible. | Done -
https://wiki.yoctoproject.org/wiki/WW27_-_2018-07-02_-_Full_Test_Cycle_2.6_M1_rc1 |
Package Update | Plan to have 70% or greater packages updated. | Done 81% - http://recipes.yoctoproject.org/rrs/recipes/2.6/M1/ |
Patch Upstream Status | Less than 50% of all patches in Pending state. | Done - 46% |
Publication | The release is announced | Released |
Milestone 2 - Target July 27, 2018
Release Criteria | Milestone 2 Target | Milestone 2 Status |
Functional Completion | All high features are completed. | Done |
Build and Release (Yocto) | All completed features can be built with no errors. | Done |
Build and Release (BSPs) | Core BSPs can be built with no errors. | Done |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [2] Done |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | Done - https://wiki.yoctoproject.org/wiki/WW32_-_2018-08-07_-_Full_Test_Cycle_2.6_M2_rc1 |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | Done - CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | Done - https://wiki.yoctoproject.org/wiki/WW32_-_2018-08-07_-_Full_Test_Cycle_2.6_M2_rc1 |
Build Performance | Try to at least maintain the current performance and improve if possible. | Done |
Package Update | Plan to have 70% or greater packages updated. | Done 82% - http://recipes.yoctoproject.org/rrs/recipes/2.6/M2/ |
Patch Upstream Status | Less than 50% of all patches in Pending state. | Done 45% |
Publication | The release is announced | Released |
Milestone 3 - Target Sept. 7, 2018
Release Criteria | Milestone 3 Target | Milestone 3 Status |
Functional Completion | All high features are completed. | Done |
Build and Release (Yocto) | All completed features can be built with no errors. | Done |
Build and Release (BSPs) | Core BSPs can be built with no errors. | Done |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [3] Done |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | Done - https://wiki.yoctoproject.org/wiki/WW41_-_2018-10-03_-_Full_Test_Cycle_2.6_M3_RC1 |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | Done - CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | Done - https://wiki.yoctoproject.org/wiki/WW41_-_2018-10-03_-_Full_Test_Cycle_2.6_M3_RC1 |
Build Performance | Try to at least maintain the current performance and improve if possible. | Done |
Package Update | Plan to have 70% or greater packages updated. | Not yet updated - http://recipes.yoctoproject.org/rrs/recipes/2.6/M3/ |
Patch Upstream Status | Less than 50% of all patches in Pending state. | |
Publication | The release is announced |
Milestone 4/Final - Target Oct. 26, 2018
Release Criteria | Milestone 4/Final Target | Milestone 4/Final Status |
Functional Completion | All high features are completed. | |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [4] |
Bug Trend | Downward trend in bug tracking during the stabilization period. | |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | |
Documentation | All examples are tested to be functional. | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | Plan to have 70% or greater packages updated. | |
Patch Upstream Status | Less than 50% of all patches in Pending state. | |
Wiki/Web Site Updated | Have reviewed the Wiki, Tutorials, and Website to insure all is current. | |
Publication | The release is announced |