Yocto 1.2 Schedule: Difference between revisions
No edit summary |
|||
(46 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
= Yocto Project 1.2 (release date: April | = Yocto Project 1.2 (release date: April 27, 2012) = | ||
---- | ---- | ||
The detailed milestone map for the 1.2 release of Yocto Project is as below. | The detailed milestone map for the 1.2 release of Yocto Project is as below. If you would like to have a real time dynamic view of all scheduled features for 1.2, please click here [http://bugzilla.pokylinux.org/buglist.cgi?bug_severity=enhancement&bug_status=NEW&bug_status=ACCEPTED&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&bug_status=RESOLVED&bug_status=VERIFIED&bug_status=CLOSED&columnlist=short_desc%2Ctarget_milestone%2Cstatus_whiteboard%2Cassigned_to%2Cbug_status%2Cbug_severity&query_format=advanced&target_milestone=1.2%20M1&target_milestone=1.2%20M2&target_milestone=1.2%20M3&target_milestone=1.2%20M4&order=target_milestone%2Cassigned_to%20DESC%2Cpriority%2Cbug_status%20DESC%2Cbug_id&query_based_on=1.2%20Scheduled%20Features]. <br/><br/> | ||
To view the Yocto schedule-at-a-glance, go to [[YoctoCalendar]]. Please note that the estimation for each feature is done based on 'perfect day'. The purpose of the estimation is to estimate the relative size of features, NOT to predict when a single feature could be done. | To view the Yocto schedule-at-a-glance, go to [[YoctoCalendar]]. <br/><br/> | ||
Please note that the estimation for each feature is done based on 'perfect day'. The purpose of the estimation is to estimate the relative size of features, NOT to predict when a single feature could be done. | |||
== M1 (Oct. 31 to Dec. 23, 2011 -- 8 weeks: planning done in week 1, development week 1-5, stabilization week 6-7, release week 8) == | == M1 (Oct. 31 to Dec. 23, 2011 -- 8 weeks: planning done in week 1, development week 1-5, stabilization week 6-7, release week 8) == | ||
=== M1 Feature Development (Oct. 31 to Dec. | === M1 Feature Development (Oct. 31 to Dec. 2, 2011) === | ||
{{#bugzilla: | |||
|columns=id,from,summary,milestone,whiteboard,to,status,url | |||
|milestone=1.2 M1 | |||
|severity=enhancement | |||
}} | |||
==== Stabilize schedule ==== | ==== M1 Stabilize schedule ==== | ||
'''Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)''' | '''Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)''' | ||
* RC1 | * RC1: 12/7/11 | ||
* RC2: 12/14/11 | |||
* | |||
* M1 Release readiness meeting: 12/21/2011 | * M1 Release readiness meeting: 12/21/2011 | ||
* M1 release: 12/23/11 | * M1 release: 12/23/11 | ||
== M2 (Dec. 12 to | == M2 (Dec. 12, 2011 to Feb. 3, 2012 -- 8 weeks: planning done in week 1, development week 1-4, stabilization week 5-6, week 7: Chinese New Year holiday for teams in China, release week 8) == | ||
=== | === M2 Feature Development (Dec. 12, 2011 to Jan. 6, 2012) === | ||
{{#bugzilla: | |||
|columns=id,from,summary,milestone,whiteboard,to,status,url | |||
|milestone=1.2 M2 | |||
|severity=enhancement | |||
}} | |||
==== M2 Stabilize schedule ==== | |||
'''Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)''' | |||
* RC1: 1/11/12 | |||
* RC2: 1/18/12 | |||
* M2 Release readiness meeting:1/25/12 | |||
* M2 release: 2/3/12 | |||
== M3 (Jan. 23 to Mar. 16, 2012 -- 9 weeks: planning done in week 1-2, development week 1-6, stabilization week 7-8, release week 9) == | |||
=== M3 Feature Development (Jan. 23 to Feb. 24, 2012) === | |||
{{#bugzilla: | |||
|columns=id,from,summary,milestone,whiteboard,to,status,url | |||
|milestone=1.2 M3 | |||
|severity=enhancement | |||
}} | |||
==== Stabilize schedule ==== | ==== M3 Stabilize schedule ==== | ||
'''Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)''' | '''Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)''' | ||
* RC1: | * RC1: 2/29/12 | ||
* RC2: | * RC2: 3/7/12 | ||
* | * M3 Release readiness meeting: 3/14/12 | ||
* | * M3 release: 3/16/12 | ||
== M4 (Mar. 5 to Apr. 27, 2012 -- 8 weeks: planning done in week 1, development week 1-4, stabilization week 5-7, release week 8) == | |||
=== M4 Feature Development (Mar. 5 to Mar. 18, 2012) === | |||
{{#bugzilla: | |||
|columns=id,from,summary,milestone,whiteboard,to,status,url | |||
|milestone=1.2 M4 | |||
|severity=enhancement | |||
}} | |||
==== M4 Stabilize schedule ==== | |||
'''Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)''' | |||
* RC1: 3/28/12 | |||
* RC2: 4/4/12 | |||
* RC3: 4/11/12 | |||
* RC4: 4/18/12 | |||
* RC5: 4/23/12 | |||
* M4 Release readiness meeting: 4/30/12 | |||
* Yocto Project 1.2 release: 4/30/12 | |||
== Yocto Project unscheduled features == | |||
Please feel free to pick up these features for development whenever you have time. We welcome and appreciate all developers' help from the community. | |||
=== Feature List === | |||
Please see https://wiki.yoctoproject.org/wiki/Yocto_1.2_Features#Unsorted |
Latest revision as of 17:53, 30 April 2012
Yocto Project 1.2 (release date: April 27, 2012)
The detailed milestone map for the 1.2 release of Yocto Project is as below. If you would like to have a real time dynamic view of all scheduled features for 1.2, please click here [2].
To view the Yocto schedule-at-a-glance, go to YoctoCalendar.
Please note that the estimation for each feature is done based on 'perfect day'. The purpose of the estimation is to estimate the relative size of features, NOT to predict when a single feature could be done.
M1 (Oct. 31 to Dec. 23, 2011 -- 8 weeks: planning done in week 1, development week 1-5, stabilization week 6-7, release week 8)
M1 Feature Development (Oct. 31 to Dec. 2, 2011)
ID | Requester | Summary (20 tasks) ⇒ | Milestone | Whiteboard | Assignee | Status | |
---|---|---|---|---|---|---|---|
1008 | Mark Hatle | New santiy check for userspace packages | 1.2 M1 | (P2)(QA Testing Completed) (Done) | Scott Garman | RESOLVED | |
1461 | Beth Flanagan | Put a uname and ab name in stdio | 1.2 M1 | (P3)(No QA needed) Status: Done and verified | Beth Flanagan | RESOLVED | |
1546 | Richard Purdie | License file WARNING messages | 1.2 M1 | (P1)(No QA needed) Done | Beth Flanagan | RESOLVED | |
1565 | Richard Purdie | Package History: Data Collection | 1.2 M1 | (P1)(QA Testing Completed) Merged into master and 1.2_M1 | Paul Eggleton | RESOLVED | |
1568 | Richard Purdie | QA Tests: Add recipe for ltp/posix tests and automate test | 1.2 M1 | (P2)(No QA needed) Done | Jiajun Xu | RESOLVED | |
1580 | Jessica | Add Valgrind support in remote tools | 1.2 M1 | (P2)(No QA needed) Done | Jessica | RESOLVED | |
1627 | Song Liu | Autobuilder clean sstate option | 1.2 M1 | (P2)(No QA needed) Status: IN REPO FINISHED | Beth Flanagan | RESOLVED | |
1660 | Tom Zanussi | crownbay: add support for video acceleration | 1.2 M1 | (P2)(QA Testing Completed) Done | Tom Zanussi | RESOLVED | |
1661 | Tom Zanussi | meta-intel: streamline and clean up kernel config options and machine conf files | 1.2 M1 | (P2)(No QA needed) Done | Tom Zanussi | RESOLVED | |
1732 | Edwin Zhai | [Build Appliance] Build core-image-minimal on sugarbay using Self Hosted Image | 1.2 M1 | (P1) (QA Testing Completed) Development (100% completed) : core-image-minimal can build on sugarbay | Dexuan Cui | RESOLVED | |
1742 | Shane Wang | [Hob2] Layer selection | 1.2 M1 | (P1) (QA Testing Completed) Development (100%) | Dongxiao Xu | RESOLVED | |
1743 | Shane Wang | [Hob2] configuration and recipe parsing | 1.2 M1 | (P1) (QA Testing Completed) Development (100%) | Dongxiao Xu | RESOLVED | |
1745 | Shane Wang | [Hob2] information collection for recipes | 1.2 M1 | (P1) (QA Testing Completed) Development (100%) | Dongxiao Xu | RESOLVED | |
1747 | Shane Wang | [Hob2] getting build dependency | 1.2 M1 | (P1) (QA Testing Completed) Development (100%) | Dongxiao Xu | RESOLVED | |
1221 | Jiajun Xu | Add build progress indicator | 1.2 M1 | Done. see bug 1751 | Shane Wang | VERIFIED | |
1564 | Richard Purdie | Multilib: Drop MULTILIB_IMAGE_INSTALL | 1.2 M1 | (P2)(QA Testing Completed) | Dongxiao Xu | VERIFIED | |
1603 | Jessica | Add recipe supporting autoconf-nativesdk and automake-nativesdk | 1.2 M1 | (P2) (QA testing completed) Done | Wenzong.Fan | VERIFIED | |
1751 | Shane Wang | [Hob2] using progress bar to show build tasks left | 1.2 M1 | (P1)(QA Testing Completed) Development (100%) | Shane Wang | VERIFIED | |
1674 | Xiaofeng Yan | run gtk+ over directfb | 1.2 M1 | (P2) (QA testing completed) Done | Xiaofeng Yan | RESOLVED | |
1776 | Beth Flanagan | License wrangling, stage 1 | 1.2 M1 | Stage1: (P1) Final commit. RFC/Pull sent. Documentation sent to Scottrif | Beth Flanagan | RESOLVED |
M1 Stabilize schedule
Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)
- RC1: 12/7/11
- RC2: 12/14/11
- M1 Release readiness meeting: 12/21/2011
- M1 release: 12/23/11
M2 (Dec. 12, 2011 to Feb. 3, 2012 -- 8 weeks: planning done in week 1, development week 1-4, stabilization week 5-6, week 7: Chinese New Year holiday for teams in China, release week 8)
M2 Feature Development (Dec. 12, 2011 to Jan. 6, 2012)
ID | Requester | Summary (29 tasks) ⇒ | Milestone | Whiteboard | Assignee | Status | |
---|---|---|---|---|---|---|---|
1241 | Joshua Lock - Disabled | Should be easier to find and remove packages | 1.2 M2 | (P2) Fixed. | Shane Wang | RESOLVED | |
1272 | Jessica | Preference Package Format only support one selection at a time | 1.2 M2 | (P3) (QA Testing Completed) Development (100%) | Dongxiao Xu | RESOLVED | |
1557 | Richard Purdie | Build Appliance: Pre-configured VM Build image built by Yocto | 1.2 M2 | (P1) for 2 people | Saul Wold | RESOLVED | |
1559 | Richard Purdie | Hob Improvements tracking bug | 1.2 M2 | Umbrella Bug For Tracking Only | Shane Wang | RESOLVED | |
1572 | Matthew McClintock | report on artifacts after image generation | 1.2 M2 | (P1) (Test Complete for Private Branch) Development (100%) | Dongxiao Xu | RESOLVED | |
1642 | Song Liu | Minimal Image unique | 1.2 M2 | (P2)(Test Case Ready)(Complete) | Darren Hart | RESOLVED | |
1647 | Song Liu | Upstream config fragments | 1.2 M2 | (P2)(Already covered in QA plan) Complete | Darren Hart | RESOLVED | |
1733 | Edwin Zhai | [Build Appliance] Improve Self-Hosted Performance | 1.2 M2 | (P2) (Test Plan Ready) : Not need now. | Edwin Zhai | RESOLVED | |
1734 | Edwin Zhai | [Build Appliance] Create image with X and Pygtk support | 1.2 M2 | (P1) (QA Testing Completed)(Done) | Edwin Zhai | RESOLVED | |
1744 | Dongxiao Xu | [Hob2] load/save user's configuration | 1.2 M2 | (P1) (QA Testing Completed) Development (100%) | Shane Wang | RESOLVED | |
1746 | Dongxiao Xu | [Hob2] Generate a temporary recipe for image install | 1.2 M2 | (P1) Invalid | Shane Wang | RESOLVED | |
1748 | Dongxiao Xu | [Hob2] pkgdata improvement | 1.2 M2 | (P1) (QA Testing Completed) (Patch Review) Development (100%) | Shane Wang | RESOLVED | |
1750 | Dongxiao Xu | [Hob2] Collect pkgdata information | 1.2 M2 | (P1) (QA Testing Completed) (Done) | Dongxiao Xu | RESOLVED | |
1752 | Dongxiao Xu | [Hob2] Package selection and deselection | 1.2 M2 | (P1) (QA Testing Completed) (Patch Review and Revise) Development (100%) | Dongxiao Xu | RESOLVED | |
1775 | Dongxiao Xu | [Hob2] Use configuration's key/value hash to validate parsing caches | 1.2 M2 | (P1) (QA Testing Completed) (Patch Review and Revise) Development (100%) | Dongxiao Xu | RESOLVED | |
1787 | Dongxiao Xu | [Hob2] Split bitbake server and frontend GUI | 1.2 M2 | (P1) (QA Testing Completed) (Patch Review and Revise) Development (100%) | Dongxiao Xu | RESOLVED | |
1805 | Joshua Lock - Disabled | GUI helper to start creating a recipe | 1.2 M2 | (p2)(QA Testing Complete) - Impl 100% done | Jessica | RESOLVED | |
1809 | Shane Wang | [Hob2] Feedbacks from hob2 preview | 1.2 M2 | 100% Done. | Belen Barros Pena | RESOLVED | |
1847 | Shane Wang | [Hob2] UI implementation based on UI skeleton design | 1.2 M2 | (P1) (No QA needed) Development 100% | anliming | RESOLVED | |
1872 | Shane Wang | [Hob2] some TODO enhancements for HOB Jiajun and Dongxiao thought about | 1.2 M2 | (Patch Review and Revise) Development (100%) | Dongxiao Xu | RESOLVED | |
991 | Joshua Lock - Disabled | Show contents of images & tasks | 1.2 M2 | Done. see bug 1747 | Shane Wang | VERIFIED | |
1450 | Joshua Lock - Disabled | Enable removal of packages | 1.2 M2 | (P1)(QA Testing Completed) dup of 1752 | Shane Wang | VERIFIED | |
1556 | Richard Purdie | Handled Releases with the PR server | 1.2 M2 | (P1)(QA Testing Completed) (Done) | Lianhao Lu | VERIFIED | |
1566 | Richard Purdie | Package History: Data Analysis | 1.2 M2 | (P1)(QA Testing Completed) (Done) | Paul Eggleton | VERIFIED | |
1608 | Joshua Lock - Disabled | Improve device management | 1.2 M2 | (P2) (No QA Needed Currently) (Done) | Joshua Lock - Disabled | VERIFIED | |
1638 | Song Liu | replace qemuppc | 1.2 M2 | (P2) (QA testing completed) Done | Bruce Ashfield | VERIFIED | |
1651 | Mark Hatle | Incremental image generation | 1.2 M2 | (P3)(QA testing completed) Done | Robert Yang | VERIFIED | |
1792 | Dongxiao Xu | [Hob2] Dynamically set back user selected packages to bitbake server and build the image | 1.2 M2 | (P1) (QA Testing Completed) Development (100%) | Dongxiao Xu | VERIFIED | |
1126 | Lianhao Lu | pending tasks and discussion about the networked PR service | 1.2 M2 | (P1)(QA Testing Completed) (Done) | Lianhao Lu | VERIFIED |
M2 Stabilize schedule
Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)
- RC1: 1/11/12
- RC2: 1/18/12
- M2 Release readiness meeting:1/25/12
- M2 release: 2/3/12
M3 (Jan. 23 to Mar. 16, 2012 -- 9 weeks: planning done in week 1-2, development week 1-6, stabilization week 7-8, release week 9)
M3 Feature Development (Jan. 23 to Feb. 24, 2012)
ID | Requester | Summary (29 tasks) ⇒ | Milestone | Whiteboard | Assignee | Status | |
---|---|---|---|---|---|---|---|
37 | Rob Bradford | sato-icon-theme lacks generic / unknown icon | 1.2 M3 | (P2)(Done) | Edwin Zhai | RESOLVED | |
717 | Gary Thomas | Improve syslog configurability | 1.2 M3 | (QA Test Completed)(Done) | Joshua Lock - Disabled | RESOLVED | |
1141 | Scott Garman | bitbake -b prints meaningless error when given an invalid recipe name | 1.2 M3 | (P1)(QA Testing Completed) (Done) | Paul Eggleton | RESOLVED | |
1143 | Scott Garman | Remove python stack trace when do_patch fails | 1.2 M3 | (P1) (QA Testing Completed) Patch merged (19 Jan) | Paul Eggleton | RESOLVED | |
1540 | Matthew McClintock | Display a summary of warnings and errors at the end of a bitbake command | 1.2 M3 | (P1)(QA Testing Completed)(Done) | Richard Purdie | RESOLVED | |
1547 | Richard Purdie | License file cleanup | 1.2 M3 | 3 Stages: Stage1: (P1)(D4) Stage2: (P2)(D10) Stage3: (P3)(D5) | Beth Flanagan | RESOLVED | |
1567 | Richard Purdie | QA Tests: Add recipe for LSB Tests and automate test | 1.2 M3 | (P2) (No QA needed) Done | Yi Zhao | RESOLVED | |
1573 | Matthew McClintock | make it clear how to run saved hob recipes from command line | 1.2 M3 | (P2)(QA Testing Completed) Done | Shane Wang | RESOLVED | |
1590 | Richard Purdie | Archive work directory | 1.2 M3 | (P2) (Test Case Ready) See 1977 | Wenzong.Fan | RESOLVED | |
1620 | Song Liu | Finish Oracle/Sun Hotspot JDK/JRE support | 1.2 M3 | (P2)(No QA Needed) (Done) | Nitin Kamble | RESOLVED | |
1623 | Song Liu | POSIX support | 1.2 M3 | (P2) (Already covered by QA plan) See 1740/1741 | Kai Kang | RESOLVED | |
1630 | Song Liu | Provide a click through license mechanism | 1.2 M3 | (P2)(QA Testing Completed) (Done) | Tom Zanussi | RESOLVED | |
1655 | Mark Hatle | Export source package from work | 1.2 M3 | (P3) (Test Case Ready ) (see 1977) | Xiaofeng Yan | RESOLVED | |
1735 | Edwin Zhai | [Build Appliance] Test Self hosted image on vmware | 1.2 M3 | (P2) )(QA Testing Completed) (Done) : Mar 03, 2012 | Dexuan Cui | RESOLVED | |
1749 | Shane Wang | [Hob2] getting build dependency quickly | 1.2 M3 | (P1)(QA Testing Completed) Done | Dongxiao Xu | RESOLVED | |
1764 | Shane Wang | [Hob2] UI skelecton | 1.2 M3 | (P1) (No QA needed) 100% Done | Belen Barros Pena | RESOLVED | |
1871 | Shane Wang | [Hob2] Implement the 4 use cases | 1.2 M3 | (QA testing completed) Done | Dongxiao Xu | RESOLVED | |
1873 | Shane Wang | [Build Appliance] Track Dave's comments on build appliance | 1.2 M3 | (QA testing completed) (Done) | Edwin Zhai | RESOLVED | |
1277 | Joshua Lock - Disabled | Need guidance choosing 'Base image' | 1.2 M3 | (P2) (QA Testing Completed) Development 100% Done | Shane Wang | VERIFIED | |
1555 | Richard Purdie | Make BasicHash the default signature generator | 1.2 M3 | (P1)(QA Testing Completed) | Lianhao Lu | VERIFIED | |
1589 | Richard Purdie | Disk space monitoring | 1.2 M3 | (P3) (QA testing completed) Done | Robert Yang | VERIFIED | |
1611 | Jessica | enhance the bitbake commander eclipse plugin | 1.2 M3 | (p2)Done | Lianhao Lu | VERIFIED | |
1682 | Robert Yang | A scripts to clean obsolote sstate cache files | 1.2 M3 | (P3)(QA testing completed) (Done) | Robert Yang | VERIFIED | |
1753 | Dongxiao Xu | [Hob2] Handle multiple providers for virtual packages | 1.2 M3 | (P1) (QA Testing Completed) Done | Shane Wang | VERIFIED | |
1837 | Shane Wang | [Hob2] integrate image deployment into HOB | 1.2 M3 | (P2) (QA Testing Completed) Development 100%. | Shane Wang | VERIFIED | |
542 | Darren Hart | bitbake "NoProvider" message doesn't aid in resolving the problem | 1.2 M3 | (P1)(QA Testing Completed)(Done) | Richard Purdie | RESOLVED | |
1127 | Scott Garman | Improve the error reporting when SkipPackage error is raised | 1.2 M3 | (P1)(Done) | Scott Garman | RESOLVED | |
1675 | Xiaofeng Yan | Create an image to meet LSB requirement for version 1.2 | 1.2 M3 | (P2) (Already covered by QA plan )(Done) | Xiaofeng Yan | RESOLVED | |
1740 | Kai Kang | POSIX support: Make new posix test suit passed on Yocto 1.2 | 1.2 M3 | (P2)(Already covered by QA plan)Done | Kai Kang | RESOLVED |
M3 Stabilize schedule
Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)
- RC1: 2/29/12
- RC2: 3/7/12
- M3 Release readiness meeting: 3/14/12
- M3 release: 3/16/12
M4 (Mar. 5 to Apr. 27, 2012 -- 8 weeks: planning done in week 1, development week 1-4, stabilization week 5-7, release week 8)
M4 Feature Development (Mar. 5 to Mar. 18, 2012)
ID | Requester | Summary (23 tasks) ⇒ | Milestone | Whiteboard | Assignee | Status | |
---|---|---|---|---|---|---|---|
1636 | Song Liu | Upgrade to EFI | 1.2 M4 | (P2)(QA Testing Completed) (Done) | Darren Hart | RESOLVED | |
1543 | Richard Purdie | Improve error handling and feedback to users | 1.2 M4 | (P1)(No QA needed) Done | Scott Garman | RESOLVED | |
1595 | Richard Purdie | Open source Yocto QA Test Cases | 1.2 M4 | (P2)(No QA Needed) Approved, Done | Jiajun Xu | RESOLVED | |
1643 | Song Liu | Kernel Tools: meta data handling enhancements | 1.2 M4 | (P2)(No QA Needed) (Done) | Bruce Ashfield | RESOLVED | |
1644 | Song Liu | kernel: development workflow usecase documentation and support | 1.2 M4 | (P1) (Test Plan Ready)- done for 1.2, see 2333 for remaining work | Bruce Ashfield | RESOLVED | |
1737 | Edwin Zhai | [Build Appliance] Create Deploy Script for deploying to HDD or USB | 1.2 M4 | (P1) (Done) dup of 1806 | Dexuan Cui | RESOLVED | |
1738 | Edwin Zhai | [Build Appliance] Create GUI for Deploy Script to be integrated with HOB | 1.2 M4 | (P2) (QA Testing Completed) (Done) | Dexuan Cui | RESOLVED | |
1806 | Darren Hart | Image Writer: provide an image writer tool to simplify the process of getting images to boot media | 1.2 M4 | (P1) (QA Testing Completed) Done | Darren Hart | RESOLVED | |
1931 | Scott Rifenbark | Need better documentation on the IMAGE_INSTALL variable | 1.2 M4 | Done | Scott Rifenbark | RESOLVED | |
718 | Gary Thomas | Allow logrotate to use a different file system from the original logs | 1.2 M4 | (P3) (QA testing completed) Done | Robert Yang | VERIFIED | |
1145 | Scott Garman | Make bitbake output less noisy for non-error cases | 1.2 M4 | (P1)(QA Testing Completed) (Testing) | Paul Eggleton | VERIFIED | |
1561 | Richard Purdie | Enable cleanup of WORKDIR | 1.2 M4 | (P3)(QA testing completed) Done | Kai Kang | VERIFIED | |
2035 | Jessica | ADT manual needs update for 1.2 for tools like lttng, BPS tools, etc | 1.2 M4 | Done | Scott Rifenbark | VERIFIED | [1] |
1645 | Song Liu | Add linux-yocto tiny ktype | 1.2 M4 | (P2) (Done) | Darren Hart | RESOLVED | |
1678 | Tom Zanussi | kernel usability scripts | 1.2 M4 | (P2)(QA Testing Completed) Done | Tom Zanussi | RESOLVED | |
1679 | Darren Hart | linux-kernel-dev refresh for 1.2 | 1.2 M4 | (P1) (No QA needed) Done | Bruce Ashfield | RESOLVED | |
1680 | Darren Hart | linux-yocto stable refresh for 1.2 | 1.2 M4 | (P2) (No QA needed): Done | Bruce Ashfield | RESOLVED | |
1741 | Kai Kang | POSIX support: Fixes bugs for every milestone - 1.2 | 1.2 M4 | (P2)(Already covered by QA plan)Done | Kai Kang | RESOLVED | |
1777 | Beth Flanagan | License wrangling, stage 2 | 1.2 M4 | Stage2: (P2) Invalid | Beth Flanagan | RESOLVED | |
1960 | Shane Wang | [Hob2] Change the UI to fit into the new design video | 1.2 M4 | (P1)(No QA needed) Done | Dongxiao Xu | RESOLVED | |
1977 | Xiaofeng Yan | Realize source archiver class | 1.2 M4 | (P2)(QA testing completed) Done | Xiaofeng Yan | VERIFIED | |
2100 | Giulia | [Hob2] Provide visual feedback when removing recipes, packages or tasks. | 1.2 M4 | Done | anliming | VERIFIED | |
2103 | Giulia | [Hob2] Select a Base Image behaviour | 1.2 M4 | Fixed | Shane Wang | VERIFIED |
M4 Stabilize schedule
Release Candidate and Milestone Release schedule (Full Pass QA test follows every RC build)
- RC1: 3/28/12
- RC2: 4/4/12
- RC3: 4/11/12
- RC4: 4/18/12
- RC5: 4/23/12
- M4 Release readiness meeting: 4/30/12
- Yocto Project 1.2 release: 4/30/12
Yocto Project unscheduled features
Please feel free to pick up these features for development whenever you have time. We welcome and appreciate all developers' help from the community.
Feature List
Please see https://wiki.yoctoproject.org/wiki/Yocto_1.2_Features#Unsorted