Yocto Project v2.6 Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
Line 209: Line 209:
| Package Update || Plan to have 70% or greater packages updated. || bgcolor=""  |  
| Package Update || Plan to have 70% or greater packages updated. || bgcolor=""  |  
|-
|-
| Upstream Commits || Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. || bgcolor=""  |  
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor=""  |  
|-
|-
| Publication || The release is announced ||  bgcolor=""  |  
| Publication || The release is announced ||  bgcolor=""  |  
Line 227: Line 227:
| Open Bugs || All bugs have been dispositioned.  Milestone high issues have been fixed. || bgcolor=""  | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2]  
| Open Bugs || All bugs have been dispositioned.  Milestone high issues have been fixed. || bgcolor=""  | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2]  
|-
|-
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor=""  | https://wiki.yoctoproject.org/wiki/WW07_-_2018-02-14-_Full_Test_Cycle_-_2.6_M2_rc1
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor=""  |  
|-
|-
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version || bgcolor=""  |  
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version || bgcolor=""  |  
Line 237: Line 237:
| Package Update || Plan to have 70% or greater packages updated. ||  bgcolor=""  |  
| Package Update || Plan to have 70% or greater packages updated. ||  bgcolor=""  |  
|-
|-
| Upstream Commits || Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. || bgcolor=""  |  
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor=""  |  
|-
|-
| Publication || The release is announced || bgcolor=""  |  
| Publication || The release is announced || bgcolor=""  |  
Line 243: Line 243:
<br/><br/>
<br/><br/>


== Milestone 3 - Target Mar. 2, 2018 ==  
== Milestone 3 - Target Sept. 7, 2018 ==  
{| border="1" {{table}}
{| border="1" {{table}}
| ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 3 Target''' || ! scope="col" bgcolor="grey" | '''Milestone 3 Status'''
| ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 3 Target''' || ! scope="col" bgcolor="grey" | '''Milestone 3 Status'''
|-
|-
| Functional Completion || All high features are completed. ||  bgcolor="#39FF14"  | Done
| Functional Completion || All high features are completed. ||  bgcolor=""  |  
|-
|-
| Build and Release (Yocto) || All completed features can be built with no errors. ||  bgcolor="#39FF14"  | Done
| Build and Release (Yocto) || All completed features can be built with no errors. ||  bgcolor=""  |  
|-
|-
| Build and Release (BSPs) || Core BSPs can be built with no errors. ||  bgcolor="yellow"  | [https://wiki.yoctoproject.org/wiki/WW15_-_2018-04-09-_Full_Test_Cycle_-_2.6_M3_rc1 QA Report]
| Build and Release (BSPs) || Core BSPs can be built with no errors. ||  bbgcolor=""  |  
|-
|-
| Open Bugs || All bugs have been dispositioned.  Milestone high issues have been fixed. || bgcolor="yellow"  | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2&target_milestone=2.6%20M3]  Proposal to push High bugs to M4
| Open Bugs || All bugs have been dispositioned.  Milestone high issues have been fixed. || bgcolor=""  | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2&target_milestone=2.6%20M3]   
|-
|-
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor="yellow"  | [https://wiki.yoctoproject.org/wiki/WW15_-_2018-04-09-_Full_Test_Cycle_-_2.6_M3_rc1 QA Report]
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor=""  |  
|-
|-
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version ||  bgcolor="#39FF14"  | Done: CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version ||  bgcolor="#39FF14"  | bgcolor=""  |
|-
|-
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor="#39FF14"  | Done [https://wiki.yoctoproject.org/wiki/WW15_-_2018-04-09-_Full_Test_Cycle_-_2.6_M3_rc1 QA Report]
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor=""  |  
|-
|-
| Build Performance || Try to at least maintain the current performance and improve if possible. ||  bgcolor="yellow"  | [https://wiki.yoctoproject.org/wiki/WW15_-_2018-04-09-_Full_Test_Cycle_-_2.6_M3_rc1#Performance_Charts Performance Charts]
| Build Performance || Try to at least maintain the current performance and improve if possible. ||  bgcolor=""  |  
|-
|-
| Package Update || Plan to have 70% or greater packages updated. ||  bgcolor="#39FF14"  | Done
| Package Update || Plan to have 70% or greater packages updated. ||  bgcolor=""  |  
|-
|-
| Upstream Commits || Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. ||   bgcolor="#39FF14"  | Done 99.9%
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor=""  |  
|-
|-
| Publication || The release is announced ||  bgcolor="#39FF14"  | Released
| Publication || The release is announced ||  bgcolor=""  |  
|}
|}
<br/><br/>
<br/><br/>


== Milestone 4/Final - Target Apr. 27, 2018 ==  
== Milestone 4/Final - Target Oct. 26, 2018 ==  
{| border="1" {{table}}
{| border="1" {{table}}
| ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 4/Final Target''' || ! scope="col" bgcolor="grey" | '''Milestone 4/Final Status'''
| ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 4/Final Target''' || ! scope="col" bgcolor="grey" | '''Milestone 4/Final Status'''
|-
|-
| Functional Completion || All high features are completed. ||  bgcolor="#39FF14"  | Done
| Functional Completion || All high features are completed. ||  bbgcolor=""  |  
|-
|-
| Build and Release (Yocto) || All completed features can be built with no errors. ||  bgcolor="#39FF14"  | Done
| Build and Release (Yocto) || All completed features can be built with no errors. ||  bgcolor=""  |  
|-
|-
| Build and Release (BSPs) || Core BSPs can be built with no errors. ||  bgcolor="#39FF14"   | [https://wiki.yoctoproject.org/wiki/WW19_-_2018-05-10-_Full_Test_Cycle_-_2.6_M4_rc1 QA Report] Done
| Build and Release (BSPs) || Core BSPs can be built with no errors. ||  bgcolor="" |  
|-
|-
| Open Bugs || All bugs have been dispositioned.  Milestone high issues have been fixed. || bgcolor="Yellow" | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2&target_milestone=2.6%20M3&target_milestone=2.6%20M4] will be closed/dispositioned in the Triage meeting.
| Open Bugs || All bugs have been dispositioned.  Milestone high issues have been fixed. || bgcolor="" | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2&target_milestone=2.6%20M3&target_milestone=2.6%20M4]  
|-
|-
| Bug Trend || Downward trend in bug tracking during the stabilization period.    ||  bgcolor="#39FF14"  | [https://wiki.yoctoproject.org/charts/combo.html Bug Trend] Done
| Bug Trend || Downward trend in bug tracking during the stabilization period.    ||  bgcolor=""  |  
|-
|-
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor="#39FF14"   | [https://wiki.yoctoproject.org/wiki/WW19_-_2018-05-10-_Full_Test_Cycle_-_2.6_M4_rc1 QA Report] Done
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor="" |  
|-
|-
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version ||  bgcolor="#39FF14"  | Done - CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version ||  bgcolor=""  |  
|-
|-
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor="#39FF14"   | [https://wiki.yoctoproject.org/wiki/WW19_-_2018-05-10-_Full_Test_Cycle_-_2.6_M4_rc1 QA Report] Done
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. ||  bgcolor="" |  
|-
|-
| Documentation || All examples are tested to be functional. ||  bgcolor="Yellow"  | In Process
| Documentation || All examples are tested to be functional. ||  bgcolor="Yellow"  | In Process
|-
|-
| Build Performance || Try to at least maintain the current performance and improve if possible. ||  bgcolor="#39FF14"   | [https://wiki.yoctoproject.org/wiki/WW19_-_2018-05-10-_Full_Test_Cycle_-_2.6_M4_rc1#Build_Performance_Test QA Report Performance] Done
| Build Performance || Try to at least maintain the current performance and improve if possible. ||  bgcolor="" |  
|-
|-
| Package Update || Plan to have 70% or greater packages updated. ||  bgcolor="#39FF14"  | Done: 72% [http://recipes.yoctoproject.org/rrs/recipes/2.6/M4/ RRS]
| Package Update || Plan to have 70% or greater packages updated. ||  bgcolor=""  |  
|-
|-
| Upstream Commits || Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. || bgcolor="#39FF14"  | Done - 100%
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor=""  |  
|-
|-
| Wiki/Web Site Updated || Have reviewed the Wiki and Web site to insure all is current.|| bgcolor="#39FF14"  | Done
| Wiki/Web Site Updated || Have reviewed the Wiki, Tutorials, and Website to insure all is current.|| bgcolor=""  |  
|-
| Code scan completed || Have reviewed the results of a Protex scan of all code being released.||  bgcolor="#39FF14"  | Done
|-
|-
| Publication || The release is announced ||  bgcolor=""  |
| Publication || The release is announced ||  bgcolor=""  |
|}
|}
<br/><br/>
<br/><br/>

Revision as of 14:59, 21 May 2018

Yocto Project 2.6 release Status - Work in progress

Project Dashboard

https://wiki.yoctoproject.org/charts/combo.html

Feature/Task Board

Overview

Scheduled Design Design Complete Development Patch Review Testing Done Blocked
"None"
"None"
"None"
"None"
"None"
IDAssigneeMilestone
7336Paul Eggleton2.6
6307Hongxu Jia2.6
12689Anuj Mittal2.6 M1
10744Richard Purdie2.6 M1
10681Alejandro Hernandez2.6 M2
12727Alexander Kanavin2.6 M2
12891Awais2.6 M3
12785David Reyna2.6 M3
12821David Reyna2.6 M3
12822David Reyna2.6 M3
12824David Reyna2.6 M3
12825David Reyna2.6 M3
8446Hongxu Jia2.6 M3
12789pankaj yadav2.6 M3
12749Richard Purdie2.6 M3
no bugzilla tickets were found
"None"

List View

Blocked

IDAssigneeEWhiteboardMilestoneStatus
  0   

Planned

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Scheduled

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Design

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Design Complete

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Development

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Patch Review

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Testing

IDAssigneePESummary (15 tasks) WhiteboardMilestoneStatus
7336Paul EggletonMedium1buildhistory-diff reports recipe-wide changes per-subpackage2.6RESOLVED
6307Hongxu JiaMedium7Package grub-efi modules and scripts similar to grub-bios2.6RESOLVED
12689Anuj MittalHigh1wic should be able to use initrd value for grub2.6 M1RESOLVED
10744Richard PurdieMedium+5Update test case of smartpm/createrepo under meta/lib/oeqa/runtime2.6 M1RESOLVED
10681Alejandro HernandezMedium+10Support inter-multi-configuration dependencies2.6 M2RESOLVED
12727Alexander KanavinMedium+Drop wireless-tools and use iw2.6 M2RESOLVED
12891AwaisMedium+5Allow flexible value for TOASTERDIR plus custom fixture support2.6 M3RESOLVED
12785David ReynaMedium+4Support Project Specific configuration for external tools (e.g. ISS, Eclipse)2.6 M3RESOLVED
12821David ReynaMedium+5Make Toaster conf changes compatible with command line usage2.6 M3RESOLVED
12822David ReynaMedium+5Support importing user changes to conf files into Toaster2.6 M3RESOLVED
12824David ReynaMedium2Scan imported layers for content so that they are immediately available2.6 M3RESOLVED
12825David ReynaMedium1show layer clone item in progress bar2.6 M3RESOLVED
8446Hongxu JiaMedium5fix .pyc/.pyo buildpaths issue2.6 M3RESOLVED
12789pankaj yadavHighqa-tools: enhance script to analyze ptest log to identify test case that passing in precious cycle but failing in current cycle2.6 M3RESOLVED
12749Richard PurdieMedium+Add ability to do "preflight" by using sstate2.6 M3RESOLVED
   51    

Done

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    




Yocto Project v2.6 Release Criteria

Milestone 1 - Target June 22, 2018

Release Criteria Milestone 1 Target Milestone 1 Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [1]
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Publication The release is announced



Milestone 2 - Target July 22, 2018

Release Criteria Milestone 2 Target Milestone 2 Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [2]
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Publication The release is announced



Milestone 3 - Target Sept. 7, 2018

Release Criteria Milestone 3 Target Milestone 3 Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [3]
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version bgcolor="" |
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Publication The release is announced



Milestone 4/Final - Target Oct. 26, 2018

Release Criteria Milestone 4/Final Target Milestone 4/Final Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [4]
Bug Trend Downward trend in bug tracking during the stabilization period.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Documentation All examples are tested to be functional. In Process
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Wiki/Web Site Updated Have reviewed the Wiki, Tutorials, and Website to insure all is current.
Publication The release is announced