Yocto Project v2.6 Status: Difference between revisions
From Yocto Project
Jump to navigationJump to search
Line 215: | Line 215: | ||
<br/><br/> | <br/><br/> | ||
== Milestone 2 - Target | == Milestone 2 - Target July 22, 2018 == | ||
{| border="1" {{table}} | {| border="1" {{table}} | ||
| ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Target''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Status''' | | ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Target''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Status''' | ||
|- | |- | ||
| Functional Completion || All high features are completed. || bgcolor=" | | Functional Completion || All high features are completed. || bgcolor="" | | ||
|- | |- | ||
| Build and Release (Yocto) || All completed features can be built with no errors. || bgcolor=" | | Build and Release (Yocto) || All completed features can be built with no errors. || bgcolor="" | | ||
|- | |- | ||
| Build and Release (BSPs) || Core BSPs can be built with no errors. || bgcolor=" | | Build and Release (BSPs) || Core BSPs can be built with no errors. || bgcolor="" | | ||
|- | |- | ||
| Open Bugs || All bugs have been dispositioned. Milestone high issues have been fixed. || bgcolor=" | | Open Bugs || All bugs have been dispositioned. Milestone high issues have been fixed. || bgcolor="" | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.6&target_milestone=2.6%20M1&target_milestone=2.6%20M2] | ||
|- | |- | ||
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor=" | | Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="" | https://wiki.yoctoproject.org/wiki/WW07_-_2018-02-14-_Full_Test_Cycle_-_2.6_M2_rc1 | ||
|- | |- | ||
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version || bgcolor=" | | Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version || bgcolor="" | | ||
|- | |- | ||
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor=" | | BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="" | | ||
|- | |- | ||
| Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor=" | | Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor="" | | ||
|- | |- | ||
| Package Update || Plan to have 70% or greater packages updated. || bgcolor=" | | Package Update || Plan to have 70% or greater packages updated. || bgcolor="" | | ||
|- | |- | ||
| Upstream Commits || Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. || bgcolor=" | | Upstream Commits || Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. || bgcolor="" | | ||
|- | |- | ||
| Publication || The release is announced || bgcolor=" | | Publication || The release is announced || bgcolor="" | | ||
|} | |} | ||
<br/><br/> | <br/><br/> |
Revision as of 14:53, 21 May 2018
Yocto Project 2.6 release Status - Work in progress
Project Dashboard
https://wiki.yoctoproject.org/charts/combo.html
Feature/Task Board
Overview
Scheduled | Design | Design Complete | Development | Patch Review | Testing | Done | Blocked | ||||||||||||||||||||||||||||||||||||||||||||||||
"None"
|
"None"
|
"None"
|
"None"
|
"None"
|
|
no bugzilla tickets were found
|
"None"
|
List View
Blocked
ID | Assignee | E | Whiteboard | Milestone | Status |
---|---|---|---|---|---|
0 |
Planned
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Scheduled
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Design
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Design Complete
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Development
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Patch Review
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Testing
ID | Assignee | P | E | Summary (15 tasks) ⇒ | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
7336 | Paul Eggleton | Medium | 1 | buildhistory-diff reports recipe-wide changes per-subpackage | 2.6 | RESOLVED | |
6307 | Hongxu Jia | Medium | 7 | Package grub-efi modules and scripts similar to grub-bios | 2.6 | RESOLVED | |
12689 | Anuj Mittal | High | 1 | wic should be able to use initrd value for grub | 2.6 M1 | RESOLVED | |
10744 | Richard Purdie | Medium+ | 5 | Update test case of smartpm/createrepo under meta/lib/oeqa/runtime | 2.6 M1 | RESOLVED | |
10681 | Alejandro Hernandez | Medium+ | 10 | Support inter-multi-configuration dependencies | 2.6 M2 | RESOLVED | |
12727 | Alexander Kanavin | Medium+ | Drop wireless-tools and use iw | 2.6 M2 | RESOLVED | ||
12891 | Awais | Medium+ | 5 | Allow flexible value for TOASTERDIR plus custom fixture support | 2.6 M3 | RESOLVED | |
12785 | David Reyna | Medium+ | 4 | Support Project Specific configuration for external tools (e.g. ISS, Eclipse) | 2.6 M3 | RESOLVED | |
12821 | David Reyna | Medium+ | 5 | Make Toaster conf changes compatible with command line usage | 2.6 M3 | RESOLVED | |
12822 | David Reyna | Medium+ | 5 | Support importing user changes to conf files into Toaster | 2.6 M3 | RESOLVED | |
12824 | David Reyna | Medium | 2 | Scan imported layers for content so that they are immediately available | 2.6 M3 | RESOLVED | |
12825 | David Reyna | Medium | 1 | show layer clone item in progress bar | 2.6 M3 | RESOLVED | |
8446 | Hongxu Jia | Medium | 5 | fix .pyc/.pyo buildpaths issue | 2.6 M3 | RESOLVED | |
12789 | pankaj yadav | High | qa-tools: enhance script to analyze ptest log to identify test case that passing in precious cycle but failing in current cycle | 2.6 M3 | RESOLVED | ||
12749 | Richard Purdie | Medium+ | Add ability to do "preflight" by using sstate | 2.6 M3 | RESOLVED | ||
51 |
Done
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Yocto Project v2.6 Release Criteria
Milestone 1 - Target June 22, 2018
Release Criteria | Milestone 1 Target | Milestone 1 Status |
Functional Completion | All high features are completed. | |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [1] |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | Plan to have 70% or greater packages updated. | |
Upstream Commits | Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. | |
Publication | The release is announced |
Milestone 2 - Target July 22, 2018
Release Criteria | Milestone 2 Target | Milestone 2 Status |
Functional Completion | All high features are completed. | |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [2] |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | https://wiki.yoctoproject.org/wiki/WW07_-_2018-02-14-_Full_Test_Cycle_-_2.6_M2_rc1 |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | Plan to have 70% or greater packages updated. | |
Upstream Commits | Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. | |
Publication | The release is announced |
Milestone 3 - Target Mar. 2, 2018
Release Criteria | Milestone 3 Target | Milestone 3 Status |
Functional Completion | All high features are completed. | Done |
Build and Release (Yocto) | All completed features can be built with no errors. | Done |
Build and Release (BSPs) | Core BSPs can be built with no errors. | QA Report |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [3] Proposal to push High bugs to M4 |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | QA Report |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | Done: CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | Done QA Report |
Build Performance | Try to at least maintain the current performance and improve if possible. | Performance Charts |
Package Update | Plan to have 70% or greater packages updated. | Done |
Upstream Commits | Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. | Done 99.9% |
Publication | The release is announced | Released |
Milestone 4/Final - Target Apr. 27, 2018
Release Criteria | Milestone 4/Final Target | Milestone 4/Final Status |
Functional Completion | All high features are completed. | Done |
Build and Release (Yocto) | All completed features can be built with no errors. | Done |
Build and Release (BSPs) | Core BSPs can be built with no errors. | QA Report Done |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [4] will be closed/dispositioned in the Triage meeting. |
Bug Trend | Downward trend in bug tracking during the stabilization period. | Bug Trend Done |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | QA Report Done |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | Done - CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | QA Report Done |
Documentation | All examples are tested to be functional. | In Process |
Build Performance | Try to at least maintain the current performance and improve if possible. | QA Report Performance Done |
Package Update | Plan to have 70% or greater packages updated. | Done: 72% RRS |
Upstream Commits | Have upstream status reviewed on 100% of patches. Greater than 90% upstreamed. | Done - 100% |
Wiki/Web Site Updated | Have reviewed the Wiki and Web site to insure all is current. | Done |
Code scan completed | Have reviewed the results of a Protex scan of all code being released. | Done |
Publication | The release is announced |