Web Hob design project with T&T: Difference between revisions
No edit summary |
mNo edit summary |
||
(43 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
This page contains information on the '''Web Hob''' design project we ran with the London-based agency [http:// | [[Category:Toaster]] | ||
The project formely known as Web Hob / WebHob / Webhob / webhob is now [[Toaster]]. | |||
This page contains information on the '''[[WebHob|Web Hob]]''' design project we ran with the London-based agency [http://www.tobiasandtobias.com/ Tobias & Tobias] between January and March 2013. | |||
General discussion about '''Web Hob''' happens on a dedicated mailing list: [https://lists.yoctoproject.org/listinfo/webhob https://lists.yoctoproject.org/listinfo/webhob] | General discussion about '''Web Hob''' happens on a dedicated mailing list: [https://lists.yoctoproject.org/listinfo/webhob https://lists.yoctoproject.org/listinfo/webhob] | ||
Line 14: | Line 18: | ||
* 2 rounds of user feedback | * 2 rounds of user feedback | ||
The | [[#Final deliverables|The final deliverables]] would be a set of static wireframes, a web-based prototype and a visual design framework. | ||
== Scope == | == Scope == | ||
Line 26: | Line 30: | ||
=== Stage 2 === | === Stage 2 === | ||
Implement the second core capability of Web Hob for the first time - the build specification and creation process. Along with build metrics this will undergo continuous improvement throughout Web Hob's lifetime. Also implement support for multi-user operation, supporting the Team Web Hob context. | Implement the second core capability of Web Hob for the first time - the build specification and creation process. Along with build metrics this will undergo continuous improvement throughout Web Hob's lifetime. Also implement support for multi-user operation, supporting the [[Web Hob Contexts|Team Web Hob context]]. | ||
=== Stage 3 === | === Stage 3 === | ||
Improve the two core capabilities, making them more powerful and more robust. At the end of this stage these core Web Hob features should be mature enough that it is ready to be deployed on publicly available infrastructure. | Improve the two core capabilities, making them more powerful and more robust. At the end of this stage these core Web Hob features should be mature enough that it is ready to be deployed on [[Web Hob Contexts#3._Public_Web_Hob|publicly available infrastructure]]. | ||
=== Scenarios | === Scenarios included in stages 1 to 3 === | ||
* Show Build Metrics | * Show Build Metrics | ||
Line 40: | Line 44: | ||
** View analysis overview | ** View analysis overview | ||
* Finding / Viewing Builds | * Finding / Viewing Builds | ||
**View list of projects/builds | ** View list of projects/builds | ||
* Install Single-User Web Hob | * Install Single-User Web Hob | ||
** Check prerequisites | ** Check prerequisites | ||
Line 58: | Line 62: | ||
** View error logs | ** View error logs | ||
=== What we really covered === | |||
The project plan turned out to be over optimistic. Of the above scenarios, the 2 installation ones (Install single-user option and Install Web Hob server) were never covered. | |||
==== | We, however, introduced an additional scenario about file access. | ||
== Final deliverables == | |||
Wireframes: [[File:Final_wireframes_candidate_v1.1.pdf]] | |||
[http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/plain/Design%20project%202%20-%20TT/phase3_final_prototype_with_dots/index.html Static prototypes] | |||
[http://www.yoctoproject.org/webhob/phase3_final_web_prototype/dashboard.html Web-based prototype] | |||
[http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/tree/Design%20project%202%20-%20TT/visual_design_psd Visual design (Photoshop files)] | |||
== Intermediate deliverables == | |||
=== Wireframes === | |||
* [[File:Wireframes-Stage_1-INT-002-0.10.pdf]] — Final Stage I Wireframes (bright blue links, buttons, etc. are clickable) | |||
* [[File:Wireframes-Stage_2&3_review-INT-002-0.18.pdf]] — Interim wireframes incorporating Stage II & III feedback (bright blue links, buttons, etc. are clickable) | * [[File:Wireframes-Stage_2&3_review-INT-002-0.18.pdf]] — Interim wireframes incorporating Stage II & III feedback (bright blue links, buttons, etc. are clickable) | ||
=== | === Static prototypes index === | ||
{|style="border-collapse: separate; border-spacing: 0; border-width: 1px; border-style: solid; border-color: #000; padding: 0" | {|style="border-collapse: separate; border-spacing: 0; border-width: 1px; border-style: solid; border-color: #000; padding: 0" | ||
! style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"| | ! style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"| Iteration | ||
! style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"| Version | ! style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"| Version | ||
! style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"| Stage | ! style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"| Stage | ||
Line 127: | Line 141: | ||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|All scenarios | |style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|All scenarios | ||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|[http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/plain/phase2-iteration5-allscenarios/index.html prototype] | |style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|[http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/plain/phase2-iteration5-allscenarios/index.html prototype] | ||
|- | |||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|3 | |||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|1 | |||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|I,II,III | |||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|All scenarios | |||
|style="border-style: solid; border-width: 0 1px 1px 0; align: left; padding: 0 5px;"|[http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/plain/Design%20project%202%20-%20TT/phase3_final_prototype/index.html prototype] | |||
|} | |} | ||
<br> | <br> | ||
* <strong> | * <strong>Iteration</strong> is the design round during which the prototype was produced. There were 3 design iterations in this project. | ||
* <strong>Version</strong> indicates how many | * <strong>Version</strong> indicates how many variations of each prototype we created as part of the design process. | ||
* <strong>Stage</strong> refers to the Web Hob stages identified by Tobias & Tobias and | * <strong>Stage</strong> refers to the Web Hob stages identified by Tobias & Tobias and described in the [[#Scope]] section. | ||
* <strong>Scope</strong> indicates, at a high level, which scenarios are addressed by the prototype | * <strong>Scope</strong> indicates, at a high level, which scenarios are addressed by the prototype. | ||
* <strong>Link</strong> to the Yocto Project git repository where the prototype is hosted | * <strong>Link</strong> to the Yocto Project git repository where the prototype is hosted. | ||
=== Other interaction design documents === | |||
==== Visual design | * [[File:Web_Hob_content_structure.pdf]] — Web Hob information architecture | ||
* [[File:Multiuser_support_in_Web_Hob.pdf]] - Design approach to multi user workflows in Web Hob | |||
=== User feedback === | |||
* [[File:User_Test_1_Findings-INT-002.pdf]] — Summary of feedback gathered on the iteration I designs | |||
* [[File:User_Test_2_Findings-INT-002.pdf]] - Summary of feedback gathered on iteration II designs | |||
=== Visual design === | |||
Visual design work by Tobias & Tobias started at the beginning of March. They agreed to deliver a set of GUI components and 3 screen mockups: | Visual design work by Tobias & Tobias started at the beginning of March. They agreed to deliver a set of GUI components and 3 screen mockups: | ||
Line 154: | Line 182: | ||
Final versions were delivered on Friday, 22nd March 2013. This is the agency's final piece of work: it doesn't mean it will be the design we will implement. Changes might come based on community feedback. | Final versions were delivered on Friday, 22nd March 2013. This is the agency's final piece of work: it doesn't mean it will be the design we will implement. Changes might come based on community feedback. | ||
===== My activity dashboard ===== | ===== My activity dashboard ===== | ||
Line 167: | Line 193: | ||
File: Yocto_dark_01.png | 4 Mar - dark | File: Yocto_dark_01.png | 4 Mar - dark | ||
</gallery> | </gallery> | ||
===== Build dashboard ===== | ===== Build dashboard ===== | ||
Line 182: | Line 206: | ||
File:Yocto_dark_02.png | 4 Mar- dark | File:Yocto_dark_02.png | 4 Mar- dark | ||
</gallery> | </gallery> | ||
===== Package information ===== | ===== Package information ===== | ||
Line 193: | Line 215: | ||
File:INT-002_-_Yocto_-_Build_Packages_-_v0.7.png | 8 Mar | File:INT-002_-_Yocto_-_Build_Packages_-_v0.7.png | 8 Mar | ||
</gallery> | </gallery> | ||
===== GUI controls ===== | ===== GUI controls ===== | ||
Line 203: | Line 223: | ||
</gallery> | </gallery> | ||
== Other Web Hob work == | |||
== | |||
* [ | * [[Web Hob]] - the main page for the Web Hob project | ||
* [[Yocto_Web_Hob_Design_0.0_—_Archived|WebHob Design — Archived]] - Design and documentation for the first Web Hob project, now superseded by the above. | * [[Yocto_Web_Hob_Design_0.0_—_Archived|WebHob Design — Archived]] - Design and documentation for the first Web Hob project, now superseded by the above. | ||
* Web UI 0.1: [[File:HOB_WEB_architecture_overview_v0_1.pdf]] (deprecated) | * Web UI 0.1: [[File:HOB_WEB_architecture_overview_v0_1.pdf]] (deprecated) |
Latest revision as of 13:18, 15 October 2013
The project formely known as Web Hob / WebHob / Webhob / webhob is now Toaster.
This page contains information on the Web Hob design project we ran with the London-based agency Tobias & Tobias between January and March 2013.
General discussion about Web Hob happens on a dedicated mailing list: https://lists.yoctoproject.org/listinfo/webhob
Introduction
Web Hob is a web-based interface to the Yocto Project. The agency Tobias & Tobias were hired to start the interface design process, following a previous strategy engagement that established priorities and a high level plan for the Web Hob project.
The design work happened between January and March 2013 and was structured like this:
- 3 design iterations
- 2 rounds of user feedback
The final deliverables would be a set of static wireframes, a web-based prototype and a visual design framework.
Scope
The strategy engagement identified 8 stages for the Web Hob project. The 3-month design work would cover the first 3 stages.
Stage 1
Create the first iteration of Web Hob, a read-only application that is limited to carrying out build metrics and forensics.
Stage 2
Implement the second core capability of Web Hob for the first time - the build specification and creation process. Along with build metrics this will undergo continuous improvement throughout Web Hob's lifetime. Also implement support for multi-user operation, supporting the Team Web Hob context.
Stage 3
Improve the two core capabilities, making them more powerful and more robust. At the end of this stage these core Web Hob features should be mature enough that it is ready to be deployed on publicly available infrastructure.
Scenarios included in stages 1 to 3
- Show Build Metrics
- Identify image
- Define scope of analysis
- Run analysis of image
- View analysis overview
- Finding / Viewing Builds
- View list of projects/builds
- Install Single-User Web Hob
- Check prerequisites
- Download/git clone Web Hob
- Install single-user option
- Create build
- Set up project
- Choose hardware
- Set preferences
- Specify layer(s)
- Specify base image and packages
- Run build
- Install Web Hob server
- Configure team servers
- Select team options and configure
- Error messaging
- View error logs
What we really covered
The project plan turned out to be over optimistic. Of the above scenarios, the 2 installation ones (Install single-user option and Install Web Hob server) were never covered.
We, however, introduced an additional scenario about file access.
Final deliverables
Wireframes: File:Final wireframes candidate v1.1.pdf
Visual design (Photoshop files)
Intermediate deliverables
Wireframes
- File:Wireframes-Stage 1-INT-002-0.10.pdf — Final Stage I Wireframes (bright blue links, buttons, etc. are clickable)
- File:Wireframes-Stage 2&3 review-INT-002-0.18.pdf — Interim wireframes incorporating Stage II & III feedback (bright blue links, buttons, etc. are clickable)
Static prototypes index
Iteration | Version | Stage | Scope | Link |
---|---|---|---|---|
1 | 1 | I,III | Build analysis | prototype |
2 | 1 | II,III | Projects and builds | prototype |
2 | 2 | II,III | Projects and builds | prototype |
2 | 3 | II,III | Projects and builds | prototype |
2 | 1 | II,III | File browsing and multi-user | prototype |
2 | 2 | I,II,III | File browsing and build analysis | prototype |
2 | 4 | I,II,III | All scenarios | prototype |
2 | 5 | I,II,III | All scenarios | prototype |
3 | 1 | I,II,III | All scenarios | prototype |
- Iteration is the design round during which the prototype was produced. There were 3 design iterations in this project.
- Version indicates how many variations of each prototype we created as part of the design process.
- Stage refers to the Web Hob stages identified by Tobias & Tobias and described in the #Scope section.
- Scope indicates, at a high level, which scenarios are addressed by the prototype.
- Link to the Yocto Project git repository where the prototype is hosted.
Other interaction design documents
- File:Web Hob content structure.pdf — Web Hob information architecture
- File:Multiuser support in Web Hob.pdf - Design approach to multi user workflows in Web Hob
User feedback
- File:User Test 1 Findings-INT-002.pdf — Summary of feedback gathered on the iteration I designs
- File:User Test 2 Findings-INT-002.pdf - Summary of feedback gathered on iteration II designs
Visual design
Visual design work by Tobias & Tobias started at the beginning of March. They agreed to deliver a set of GUI components and 3 screen mockups:
- My activity dashboard
- Build dashboard
- Package information
The thumbnails below show the visual design work as it was delivered over time. I've grouped them by page, so that it's easier to see how they evolved.
Final versions were delivered on Friday, 22nd March 2013. This is the agency's final piece of work: it doesn't mean it will be the design we will implement. Changes might come based on community feedback.
My activity dashboard
Build dashboard
Package information
GUI controls
Other Web Hob work
- Web Hob - the main page for the Web Hob project